Tevatron Models

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]
Full Title: Vaia's Meeting on reviewing the status of Tevatron Modelling
Date & Time: 30 Jan 2007 at 14:00
Event Location: The Penthouse
Event Topic(s): General
Event Moderator(s):
Start Title Author(s) Topic(s) File(s) Length
14:00 Tools used by the Run Coordinator to determine optimal end of store times Brian E. Drendel General
End of store tools powerpoint file
00:15
14:15 Review of the Monte-Carlo Based Operations Model of Tevatron Operations Elliott S McCrory Operations
General
Review of Mode...ppt
00:15
14:30 None
None
00:20
14:50 Tevatron Luminosity Model... or why stores should be 36 hrs long Vladimir Shiltsev General
ppt
00:15
15:05 Changes in delivered luminosity by changing the store length Vaia Papadimitriou SDA
store_length_J...ppt
00:05

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.21 usr + 0.02 sys = 0.23 CPU)