Document List by Author

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

David P Capista of Fermi National Accelerator Laboratory is listed as an author on the following documents:

Beams-doc-# Title Author(s) Topic(s) Last Updated
4829-v1 Main Injector/Recycler Magnet Failure Form David P Capista Main Injector
Magnets
Recycler
Magnets
12 May 2015
4828-v1 Main Injector/Recycler Magnet Failure Tag David P Capista Main Injector
Magnets
Recycler
Magnets
12 May 2015
4617-v1 Main Injector Pond temperatures David P Capista Operations
12 Jun 2014
4244-v1 Meeting Notes from RR BPM System -- November 1, 2012 Phil Adamson et al. BPM
Beam Instrumentation
BPM
01 Nov 2012
3613-v1 Systems-Instrumentation-SDA meeting of May 11, 2010 Jerry Annala et al. Tevatron
Main Injector
Instrumentation
18 May 2010
3218-v1 Instrumentation-Systems-SDA meeting of October 1, 2008 Kevin Cahill et al. SDA
Instrumentation
01 Oct 2008
3177-v1 Instrumentation-Systems-SDA meeting of August 6, 2008 Jerry Annala et al. SDA
Instrumentation
07 Aug 2008
3148-v2 Instrumentation-Systems-SDA meeting of July 2, 2008 David P Capista et al. SDA
Instrumentation
03 Jul 2008
2618-v1 First Results from MI8 Collimator Use Phil Adamson et al. Transfer Lines
ES&H
Collimation
Studies
22 Apr 2008
3067-v2 Instrumentation-Systems-SDA meeting of April 2, 2008 David P Capista et al. SDA
Instrumentation
08 Apr 2008
2853-v3 Instrumentation-Systems-SDA meeting of August 1, 2007 David P Capista et al. SDA
09 Aug 2007
2821-v1 Instrumentation-Systems-SDA meeting of June 20, 2007 Timofei B Bolshakov et al. SDA
21 Jun 2007
2689-v1 Instrumentation-Systems-SDA meeting of March 14, 2007 Timofei B Bolshakov et al. SDA
16 Mar 2007
2524-v1 Minutes/Action items of the Accelerator performance monitoring tools meeting, Sept. 28 2006 Jerry Annala et al. SDA
16 Oct 2006
2428-v1 MI BPM alarms David P Capista BPM
30 Aug 2006
2422-v1 Main Injector BPM signoff forms David P Capista BPM
BPM
29 Aug 2006
2099-v1 MI BPM Installation Requirements David P Capista BPM
11 Jan 2006
1996-v5 MI BPM Configurations for Operational States David P Capista BPM
BPM
31 Oct 2005
1786-v7 Requirements for the Main Injector BPM upgrade David P Capista et al. BPM
24 Oct 2005
1998-v1 Summary of MI BPM requirements David P Capista et al. BPM
24 Oct 2005
1904-v5 MI BPM requirements talk David P Capista BPM
BPM
24 Jul 2005
1834-v9 BPM Buffers David P Capista et al. BPM
BPM
30 Jun 2005
1806-v1 MI States and Clock Events David P Capista BPM
03 May 2005
1345-v1 Documents for New MI SBD Chandrashekhara M. Bhat et al. Sampled Bunch Display (SBD)
Beam Instrumentation
22 Sep 2004
591-v1 BEAM BASED MEASUREMENTS OF HYSTERESIS EFFECTS IN FERMILAB MAIN INJECTOR MAGNETS Bruce C. Brown et al. Power Supplies
Magnets
07 May 2003

Number of documents found: 25

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.25 usr + 0.03 sys = 0.28 CPU)