Document List by Author
Fermilab at Work ]  [ Accelerator Division ]  [ Beams DocDB ]  [ LARP ]  [ LARP DocDB ]  [ ProgDev DocDB ] 

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

Craig C Drennan of Fermi National Accelerator Laboratory is listed as an author on the following documents:

Beams-doc-# Title Author(s) Topic(s) Last Updated
3486-v5 Installation Planning for BPM-HRM Booster DAQ Extension Craig C Drennan Beam Instrumentation
12 Nov 2009
3214-v2 Booster Bunch Length Monitor Craig C Drennan Beam Instrumentation
26 Oct 2009
3368-v7 Booster Corrector Installation Data -- Shutdown 2009 Craig C Drennan Controls
Power Supplies
10 Sep 2009
3425-v1 Booster LLRF Electronics Upgrade -- Electronic Design Efforts, April 2009 Craig C Drennan LLRF
21 Jul 2009
2762-v5 Penetrations for Corrector Cables Craig C Drennan Power Supplies
29 Apr 2009
3367-v1 Characterization of the Fast Phase Detector in the Booster LLRF System Craig C Drennan Controls
LLRF
15 Apr 2009
2974-v2 Mathematical Description of the Booster LLRF Controls Craig C Drennan Controls
LLRF
15 Apr 2009
2828-v4 Requirements for the Booster LLRF DDS Module Craig C Drennan et al. Hardware
LLRF
15 Apr 2009
3366-v1 Collection of Published Papers for the Booster Corrector Upgrade Craig C Drennan Booster
13 Apr 2009
3315-v2 Choices for Instrumenting Booster Corrector RTD's Craig C Drennan Controls
Operations
24 Feb 2009
3230-v1 Examination of the Booster Short Straight Corrector Prototype Installation Craig C Drennan Upgrades
20 Oct 2008
3205-v4 Pulse Stretcher Application For Measuring BDot Coils on Booster MP02 Current Craig C Drennan Beam Instrumentation
Booster
29 Sep 2008
1410-v8 BLM Upgrade Users' Guide Alan Baumbaugh et al. Instrumentation
Beam Instrumentation
Beam Instrumentation
Beam Loss Monitors (BLM)
TeV ABORT
29 Jan 2008
2863-v2 Conversion Between New Booster Correctors and Old Craig C Drennan Power Supplies
Operations
02 Oct 2007
2859-v11 Booster Corrector Installation Data -- Shutdown 2007 Craig C Drennan Controls
Upgrades
Power Supplies
19 Sep 2007
1881-v5 SPECIFICATION FOR THE BOOSTER CORRECTOR MAGNETS AND POWER SUPPLIES Craig C Drennan Controls
19 Jul 2007
2757-v3 Updating Calibration Values in the Booster BPM System Craig C Drennan BPM
Upgrades
10 Jul 2007
2792-v7 Minutes of the Booster Corrector Prototype Test Planning Meeting Craig C Drennan Upgrades
05 Jul 2007
2804-v1 Proton Plan Booster Corrector Upgrade -- Directors Review Aug. 2006 Craig C Drennan Upgrades
11 Jun 2007
2632-v3 Coordinate System for New Booster Corrector Magnet System Craig C Drennan et al. Controls
Upgrades
Beam Dynamics
Operations
30 May 2007
2791-v1 System Overview for the Multi-element Corrector Magnets and Controls for the Fermilab Booster. Craig C Drennan Upgrades
29 May 2007
1883-v2 Booster Floor Plan Markup for New Corrector System Craig C Drennan Power Supplies
14 May 2007
2773-v3 Booster Corrector Power Cable Installation Details Craig C Drennan Power Supplies
14 May 2007
2734-v2 Booster Long Straight Corrector Package Installation Craig C Drennan Upgrades
24 Apr 2007
2718-v1 March 27, 2007 Booster Corrector Status for DOE Review Craig C Drennan Upgrades
27 Mar 2007
2700-v1 Transformer Test Results BMA001 Craig C Drennan Operations
19 Mar 2007
2520-v3 Booster Corrector Magnet -- Measurement of Mutual Inductance Craig C Drennan Beam Dynamics
20 Oct 2006
2523-v1 Booster Beam Loss Monitor Upgrade Specification Craig C Drennan Beam Instrumentation
Front-end Systems
16 Oct 2006
1882-v4 New Booster Corrector Magnet Power Amplifier Controls Specification Craig C Drennan Power Supplies
16 Aug 2006
1127-v2 TeV BLM Test Card Review Docs Craig C Drennan Instrumentation
Beam Loss Monitors (BLM)
TeV ABORT
16 Apr 2004

Number of documents found: 30

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ]

DocDB Version 8.7.11, contact Beams Document Database Administrators
Security, Privacy, Legal Fermi National Accelerator Laboratory
Execution time: 1 wallclock secs ( 0.44 usr + 0.03 sys = 0.47 CPU)