Document List by Author
[
Fermilab at Work
] [
Accelerator Division
] [
Beams DocDB
] [
LARP
] [
LARP DocDB
] [
ProgDev DocDB
]
[
DocDB Home
] [
Search
] [
Last 20 Days
] [
List Authors
] [
List Topics
]
Craig C Drennan
of Fermi National Accelerator Laboratory
is listed as an author on the following documents:
Beams-doc-#
Title
Author(s)
Topic(s)
Last Updated
3486-v5
Installation Planning for BPM-HRM Booster DAQ Extension
Craig C Drennan
Beam Instrumentation
12 Nov 2009
3214-v2
Booster Bunch Length Monitor
Craig C Drennan
Beam Instrumentation
26 Oct 2009
3368-v7
Booster Corrector Installation Data -- Shutdown 2009
Craig C Drennan
Controls
Power Supplies
10 Sep 2009
3425-v1
Booster LLRF Electronics Upgrade -- Electronic Design Efforts, April 2009
Craig C Drennan
LLRF
21 Jul 2009
2762-v5
Penetrations for Corrector Cables
Craig C Drennan
Power Supplies
29 Apr 2009
3367-v1
Characterization of the Fast Phase Detector in the Booster LLRF System
Craig C Drennan
Controls
LLRF
15 Apr 2009
2974-v2
Mathematical Description of the Booster LLRF Controls
Craig C Drennan
Controls
LLRF
15 Apr 2009
2828-v4
Requirements for the Booster LLRF DDS Module
Craig C Drennan
et al.
Hardware
LLRF
15 Apr 2009
3366-v1
Collection of Published Papers for the Booster Corrector Upgrade
Craig C Drennan
Booster
13 Apr 2009
3315-v2
Choices for Instrumenting Booster Corrector RTD's
Craig C Drennan
Controls
Operations
24 Feb 2009
3230-v1
Examination of the Booster Short Straight Corrector Prototype Installation
Craig C Drennan
Upgrades
20 Oct 2008
3205-v4
Pulse Stretcher Application For Measuring BDot Coils on Booster MP02 Current
Craig C Drennan
Beam Instrumentation
Booster
29 Sep 2008
1410-v8
BLM Upgrade Users' Guide
Alan Baumbaugh
et al.
Instrumentation
Beam Instrumentation
Beam Instrumentation
Beam Loss Monitors (BLM)
TeV ABORT
29 Jan 2008
2863-v2
Conversion Between New Booster Correctors and Old
Craig C Drennan
Power Supplies
Operations
02 Oct 2007
2859-v11
Booster Corrector Installation Data -- Shutdown 2007
Craig C Drennan
Controls
Upgrades
Power Supplies
19 Sep 2007
1881-v5
SPECIFICATION FOR THE BOOSTER CORRECTOR MAGNETS AND POWER SUPPLIES
Craig C Drennan
Controls
19 Jul 2007
2757-v3
Updating Calibration Values in the Booster BPM System
Craig C Drennan
BPM
Upgrades
10 Jul 2007
2792-v7
Minutes of the Booster Corrector Prototype Test Planning Meeting
Craig C Drennan
Upgrades
05 Jul 2007
2804-v1
Proton Plan Booster Corrector Upgrade -- Directors Review Aug. 2006
Craig C Drennan
Upgrades
11 Jun 2007
2632-v3
Coordinate System for New Booster Corrector Magnet System
Craig C Drennan
et al.
Controls
Upgrades
Beam Dynamics
Operations
30 May 2007
2791-v1
System Overview for the Multi-element Corrector Magnets and Controls for the Fermilab Booster.
Craig C Drennan
Upgrades
29 May 2007
1883-v2
Booster Floor Plan Markup for New Corrector System
Craig C Drennan
Power Supplies
14 May 2007
2773-v3
Booster Corrector Power Cable Installation Details
Craig C Drennan
Power Supplies
14 May 2007
2734-v2
Booster Long Straight Corrector Package Installation
Craig C Drennan
Upgrades
24 Apr 2007
2718-v1
March 27, 2007 Booster Corrector Status for DOE Review
Craig C Drennan
Upgrades
27 Mar 2007
2700-v1
Transformer Test Results BMA001
Craig C Drennan
Operations
19 Mar 2007
2520-v3
Booster Corrector Magnet -- Measurement of Mutual Inductance
Craig C Drennan
Beam Dynamics
20 Oct 2006
2523-v1
Booster Beam Loss Monitor Upgrade Specification
Craig C Drennan
Beam Instrumentation
Front-end Systems
16 Oct 2006
1882-v4
New Booster Corrector Magnet Power Amplifier Controls Specification
Craig C Drennan
Power Supplies
16 Aug 2006
1127-v2
TeV BLM Test Card Review Docs
Craig C Drennan
Instrumentation
Beam Loss Monitors (BLM)
TeV ABORT
16 Apr 2004
Number of documents found: 30
[
DocDB Home
] [
Search
] [
Last 20 Days
] [
List Authors
] [
List Topics
]
DocDB
Version 8.7.11, contact
Beams Document Database Administrators
Security, Privacy, Legal
Execution time:
1 wallclock secs ( 0.44 usr + 0.03 sys = 0.47 CPU)