Document List by Author

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Randy M Thurman-Keup of Fermi National Accelerator Laboratory is listed as an author on the following documents:

Beams-doc-# Title Author(s) Topic(s) Last Updated
2433-v11 BLM Upgrade Controller Card Program Design Randy M Thurman-Keup Instrumentation
Beam Instrumentation
Beam Loss Monitors (BLM)
Run II Upgrades
16 Oct 2015
4633-v2 Functional Requirement Specification Performance of the MI EBP Randy M Thurman-Keup Beam Instrumentation
Instrumentation
21 Jul 2014
4619-v1 Electron Beam Profiler for the Main Injector Randy M Thurman-Keup Accelerator Seminar
18 Jun 2014
4381-v2 Status of the New MI and RR Beam Profiling Measurement Devices Randy M Thurman-Keup et al. Beam Instrumentation
Beam Instrumentation
Accelerator Seminar
Beam Instrumentation
11 Jun 2013
4020-v1 ASTA/NML Transverse Profile Station: Testing and Installation Amber S Johnson et al. ILCTA
Beamline
OTR
13 Dec 2011
3352-v1 Electron Beam Profiler for Project-X Randy M Thurman-Keup Beam Instrumentation
Project X
24 Jun 2010
1410-v10 BLM Upgrade Users' Guide Alan Baumbaugh et al. Instrumentation
Beam Instrumentation
Beam Instrumentation
Beam Loss Monitors (BLM)
TeV ABORT
21 Jun 2010
3248-v1 Proposal for Experiments and Upgrades at the A0 Photoinjector Mike Church et al. Photoinjector
14 Nov 2008
3218-v1 Instrumentation-Systems-SDA meeting of October 1, 2008 Kevin Cahill et al. SDA
Instrumentation
01 Oct 2008
3198-v1 Instrumentation-Systems-SDA meeting of September 2, 2008 Andreas Jansson et al. SDA
Instrumentation
04 Sep 2008
3043-v2 Tevatron and Main Injector Sampled Bunch Displays Randy M Thurman-Keup Instrumentation
Sampled Bunch Display (SBD)
Beam Instrumentation
20 Aug 2008
3161-v1 Bunch Length Measurements at A0 Randy M Thurman-Keup Diagnostics
16 Jul 2008
3148-v2 Instrumentation-Systems-SDA meeting of July 2, 2008 David P Capista et al. SDA
Instrumentation
03 Jul 2008
3096-v1 Instrumentation-Systems-SDA meeting of May 14, 2008 Mary Convery et al. SDA
Instrumentation
23 May 2008
3097-v1 Impressions from the 13th Beam Instrumentation Workshop BIW2008 Vsevolod Kamerdzhiev et al. Accelerator Seminar
Instrumentation
21 May 2008
3077-v1 BLM Upgrade - Digitizer Card Operating Guide Randy M Thurman-Keup Instrumentation
Beam Instrumentation
Beam Loss Monitors (BLM)
24 Apr 2008
3067-v2 Instrumentation-Systems-SDA meeting of April 2, 2008 David P Capista et al. SDA
Instrumentation
08 Apr 2008
1262-v5 Synchrotron Light Monitor Front End Description Eugene Lorman et al. Instrumentation
SyncLite (SL)
29 Feb 2008
1390-v3 Abort Gap Monitoring Utilizing Synchrotron Light Randy M Thurman-Keup Instrumentation
Abort Gap Measurements
SyncLite (SL)
19 Feb 2008
3025-v1 Instrumentation-Systems-SDA meeting of February 6, 2008 Kevin Cahill et al. SDA
Instrumentation
06 Feb 2008
1738-v3 Sync Light ACNET Parameters Eugene Lorman et al. Instrumentation
SyncLite (SL)
29 Jan 2008
1975-v2 Optical Imaging of the Tevatron Beam using Synchrotron Radiation Randy M Thurman-Keup Instrumentation
Emittance
SyncLite (SL)
29 Jan 2008
1098-v4 Synclite & AGI Harware Setup Eugene Lorman et al. Instrumentation
Abort Gap Measurements
SyncLite (SL)
29 Jan 2008
2956-v1 Instrumentation-Systems-SDA meeting of December 5, 2007 Jerry Annala et al. SDA
Instrumentation
10 Dec 2007
2938-v1 Instrumentation-Systems-SDA meeting of November 7, 2007 James L. Crisp et al. SDA
Instrumentation
29 Nov 2007
2888-v5 Instrumentation-Systems-SDA meeting of October 3, 2007 Timofei B Bolshakov et al. SDA
Flying Wires
04 Oct 2007
2853-v3 Instrumentation-Systems-SDA meeting of August 1, 2007 David P Capista et al. SDA
09 Aug 2007
2821-v1 Instrumentation-Systems-SDA meeting of June 20, 2007 Timofei B Bolshakov et al. SDA
21 Jun 2007
2766-v1 Instrumentation-Systems-SDA meeting of May 2, 2007 Keith E Gollwitzer et al. SDA
03 May 2007
2689-v1 Instrumentation-Systems-SDA meeting of March 14, 2007 Timofei B Bolshakov et al. SDA
16 Mar 2007
2585-v1 Instrumentation-SDA-Systems meeting of December 6 2006 Martin J. Hu et al. SDA
14 Dec 2006
2537-v4 Synclite Master Document Randy M Thurman-Keup Instrumentation
SyncLite (SL)
25 Oct 2006
2519-v1 AGI Status Randy M Thurman-Keup Instrumentation
Emittance
Tevatron Group
Abort Gap Measurements
SyncLite (SL)
13 Oct 2006
2165-v1 Monitoring Abort Gap Beam Intensity in the Tevatron Using Synchrotron Radiation Randy M Thurman-Keup Instrumentation
Abort Gap Measurements
SyncLite (SL)
22 Feb 2006
1974-v1 Synclite Status 9/28/2005 Randy M Thurman-Keup Instrumentation
SyncLite (SL)
30 Sep 2005
1973-v1 A Controls Java-Based Synclite Viewer Application Randy M Thurman-Keup Instrumentation
SyncLite (SL)
29 Sep 2005
1889-v1 DC Beam Measurements Randy M Thurman-Keup Instrumentation
Abort Gap Measurements
05 Jul 2005
1544-v2 Synclite Status Randy M Thurman-Keup Instrumentation
SyncLite (SL)
05 Jul 2005
1337-v2 notes from Instrumentation/Beam Physics Meetings Nathan Eddy et al. DCCTs
Ion Profile Monitor
Intensity Measurements
SyncLite (SL)
Instrumentation/beam Physics
Tune Measurement
Sampled Bunch Display (SBD)
Schottky
FBI
Dampers
Abort Gap Measurements
Flying Wires
29 Mar 2005
1760-v1 Abort Gap Monitoring Randy M Thurman-Keup Instrumentation
Abort Gap Measurements
28 Mar 2005
1759-v1 Synclite Status from 03/25/05 TeV Mtg Randy M Thurman-Keup SyncLite (SL)
Instrumentation
Tevatron Group
28 Mar 2005
1460-v1 Status of Synclite Randy M Thurman-Keup SyncLite (SL)
Instrumentation/beam Physics
Instrumentation
Abort Gap Measurements
17 Nov 2004
1219-v1 Tevatron Abort Gap Monitor Timing Controls Tom Meyer et al. Intensity Measurements
SyncLite (SL)
Instrumentation
TeV ABORT
23 Jun 2004
1218-v1 Abort Gap Monitor Status presented at Beam Phys/Inst Mtg. Randy M Thurman-Keup SyncLite (SL)
Instrumentation
23 Jun 2004
1217-v1 Abort Gap Monitor results presented at TeV Mtg. Randy M Thurman-Keup SyncLite (SL)
Instrumentation
23 Jun 2004
1216-v1 Abort Gap Monitor Talk at LARP Mtg. Randy M Thurman-Keup SyncLite (SL)
Instrumentation
23 Jun 2004
1162-v2 Abort Gap Monitoring Status Randy M Thurman-Keup Talks
SyncLite (SL)
Instrumentation
23 Jun 2004
1195-v1 Abort Gap Synch Light Results from 6/4/04 TeV Meeting Randy M Thurman-Keup SyncLite (SL)
Instrumentation
04 Jun 2004
1194-v1 Abort Gap Synch Light results from 5/28/04 TeV Meeting Randy M Thurman-Keup SyncLite (SL)
Instrumentation
04 Jun 2004

Number of documents found: 49

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.27 usr + 0.06 sys = 0.33 CPU)