Document List by Author

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

C. Shekhar Mishra of Fermi National Accelerator Laboratory is listed as an author on the following documents:

Beams-doc-# Title Author(s) Topic(s) Last Updated
3691-v1 Indian Institutions and Fermilab Collaboration: A Road We Travel Together C. Shekhar Mishra Accelerator Seminar
12 Oct 2010
1900-v1 Report to the Fermilab Director by the Proton Committee Chuck Ankenbrandt et al. Upgrades
MiniBooNE
General
Operations
18 Jul 2005
1477-v2 Projects in the Accelerator Division suited for University collaboration William J. Ashmanskas et al. SDA
15 Dec 2004
179-v2 Magnetic Field Quality Specification for Recycler Ring Combined Function and Quadrupole Magnets Norman M. Gelfand et al. Magnets
Studies
23 Jul 2003
151-v1 Results of Off-Center Harmonic Measurements and Analysis C. Shekhar Mishra Studies
Magnets
02 Jul 2003
121-v1 Data Analysis & Quality Control of the Fermilab Main Injector Dipoles Using the Flatcoil Measurements C. Shekhar Mishra Studies
Magnets
25 Jun 2003
125-v1 Main Injector Dipole Magnet Acceptance Criteria C. Shekhar Mishra Magnets
25 Jun 2003
374-v1 The Time Evolution of Beam in the Recycler Ring Krishnaswamy Gounder et al. Vacuum
Beam Dynamics
20 Jun 2003
368-v1 The Effects of Antiproton Beam Ionization: First Glance Chandrashekhara M. Bhat et al. Beam Dynamics
20 Jun 2003
378-v1 The Recycler Ring Vacuum: A Comprehensive Report Terry G. Anderson et al. Vacuum
20 Jun 2003
73-v1 Effective Length of the Main Injector Dipole and its Effect on Main Injector Henry D. Glass et al. Magnets
12 Jun 2003
71-v1 Simulation of the Dynamical Performance of the Main Injector at 8.9 GeV Fady A. Harfoush et al. Lattice
Studies
12 Jun 2003
209-v1 Fermilab Collider Run Ib Accelerator performance C. Shekhar Mishra et al. General
13 Dec 2002
702-v1 Recycler Ring Lifetime and Emittance Growth Terry G. Anderson et al. Vacuum
Stochastic Cooling
Commissioning
Beam Dynamics
08 Aug 2001
366-v2 Recycler Ring Aperture Scan: Summary of Results Saeed Assadi et al. Studies
31 Dec 2000
333-v2 Main Injector Commissioning Plan C. Shekhar Mishra Operations
Beam Instrumentation
Commissioning
22 Jul 1998
231-v1 Accelerator Physics Issues C. Shekhar Mishra Lattice
Magnets
Magnets
17 Sep 1996
158-v2 Recycler Beta Function Distortions from Systematic and Random Gradient Errors in Combined Function and Quadrupole Magnets Stephen D. Holmes et al. Magnets
Lattice
02 Apr 1996
155-v2 Recycler Closed Orbit Distortion from a Systematic Mismatch Between Long and Short Combined Function Magnet Strengths Stephen D. Holmes et al. Magnets
29 Feb 1996
152-v1 Main Injector Dipole Magnets Placement in MI62 and MI10 C. Shekhar Mishra Civil
Magnets
20 Dec 1995
149-v2 Thoughts on FMI Application Programming, CHEP95 and the Main Injector C. Shekhar Mishra Controls
Other
Project
05 Oct 1995
150-v2 Data Analysis and Quality Control of the Fermilab Main Injector Dipoles Using the Flatcoil Measurements C. Shekhar Mishra Studies
Magnets
Magnets
16 Jan 1995
111-v1 Study of the Long and Short Quadrupoles Strength Match C. Shekhar Mishra Studies
Magnets
Magnets
30 Jun 1994
110-v1 Study of the Alignment Tolerance and Corrector Strength in the Fermilab Main Injector Lattice C. Shekhar Mishra Lattice
Alignment
Studies
25 May 1994
109-v1 Study of the Main Injector Quadrupole Measurement Precision C. Shekhar Mishra Studies
Magnets
14 Apr 1994
89-v1 Study of the Fermilab Main Injector Lattice Fady A. Harfoush et al. Lattice
Studies
25 Aug 1993
67-v1 Systematic and Random Errors for Main Injector Tracking Fady A. Harfoush et al. Magnets
31 Oct 1991

Number of documents found: 27

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.21 usr + 0.02 sys = 0.23 CPU)