Document List by Author

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Chandrashekhara M. Bhat of Fermi National Accelerator Laboratory is listed as an author on the following documents:

Beams-doc-# Title Author(s) Topic(s) Last Updated
5780-v1 Longitudinal Beam Tomography for the Booster Beam Chandrashekhara M. Bhat Studies
Beam Physics
09 Aug 2017
5762-v1 Beam based RF voltage measurements and Longitudinal beam tomography at the Fermilab Booster for Intensity Upgrade Chandrashekhara M. Bhat Studies
04 Aug 2017
5675-v1 Beam Emittance using MW in MI8 for two different LINAC beam Currents Chandrashekhara M. Bhat et al. Studies
Beam Physics
23 Jul 2017
5717-v1 2nd Harmonic RF for the Bunch Rotation in the Fermilab Booster Chandrashekhara M. Bhat HLRF
Beam Physics
24 Jul 2017
5366-v1 Intensity Dependence of Transition Crossing in the Booster Chandrashekhara M. Bhat Studies
Beam Physics
12 Apr 2017
5362-v2 Booster RF Voltage by Synchrotron Frequency Measurements at Extraction Chandrashekhara M. Bhat et al. Booster
Studies
HLRF
Beam Physics
12 Apr 2017
5344-v6 Booster Vrf by fsy Measurements at Injection Energy (400 MeV on a DC-Mode) Chandrashekhara M. Bhat LLRF
HLRF
Beam Physics
22 Mar 2017
5295-v1 Proton Beam Intensity Upgrades for the Neutrino Program at Fermilab Chandrashekhara M. Bhat Booster
Longitudinal Dynamics
Other
Beam Physics
15 Dec 2016
5290-v1 Particle Accelerators at the Intensity and Energy Frontiers for High Energy Physics Research Chandrashekhara M. Bhat Technology
10 Dec 2016
5208-v1 Proton Beam Intensity Upgrades for the Neutrino Program at Fermilab Chandrashekhara M. Bhat Booster
Beam Physics
11 Aug 2016
5205-v1 R&D on Beam Injection and Bunching Scheme in the Fermilab Booster Chandrashekhara M. Bhat Booster
09 Aug 2016
5174-v1 PIP: Measurements and simulations of beam crossing transition Chandrashekhara M. Bhat et al. PIP
15 Jun 2016
5060-v1 PIP Status Report Meeting Chandrashekhara M. Bhat et al. PIP
01 Feb 2016
5058-v3 An Update on Early Injection Capture in the Booster Chandrashekhara M. Bhat PIP
Operations
01 Feb 2016
5028-v3 Injection Studies in the Booster Chandrashekhara M. Bhat Studies
16 Dec 2015
5013-v2 Workshop on Booster Performance and Enhancements 23 Nov - 24 Nov Chandrashekhara M. Bhat et al. PIP
09 Dec 2015
5014-v1 Beam Injection and Capture Chandrashekhara M. Bhat Booster
Upgrades
Beam Dynamics
25 Nov 2015
4932-v3 An ACNET Application Program to Measure the Energy Spread of Multi-turn Beam in the Booster at Injection Chandrashekhara M. Bhat et al. Studies
16 Sep 2015
4928-v1 Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandrashekhara M. Bhat Upgrades
18 Aug 2015
4872-v2 The LHC in Context and the Current Status Chandrashekhara M. Bhat Other
News
Other
27 Jun 2015
4790-v1 Early Beam Injection in the Fermilab Booster & its Implementation Plan Chandrashekhara M. Bhat LLRF
Upgrades
Beam Dynamics
Studies
HLRF
Operations
12 May 2015
4701-v1 A 1-shot sequence for Booster studies Chandrashekhara M. Bhat et al. Controls
Studies
12 Nov 2014
4568-v1 A Look at The Longitudinal Beam Dynamics of the Booster Beam: Experiment and Simulations Chandrashekhara M. Bhat et al. Booster
Upgrades
Beam Dynamics
Operations
09 Apr 2014
4546-v2 Beam Energy Spread in the Booster at Injection Chandrashekhara M. Bhat et al. Projects
Upgrades
Beam Dynamics
Operations
19 Feb 2014
4417-v1 Longitudinal phase space coating of beam in a storage ring Chandrashekhara M. Bhat Operations
LLRF
HLRF
RF
Recycler
Beam Physics
Longitudinal Dynamics
Multiparticle
21 Jul 2013
3614-v1 Instability Study in the Recycler Chandrashekhara M. Bhat et al. MI-RR-Group
Studies
Beam Dynamics
RF
Electron Cooling
21 May 2010
3562-v1 MI -> RR Injection Phase and Energy Mismatch: Measurements using W24 Chandrashekhara M. Bhat et al. Talks
RF
Beam Instrumentation
Studies
Beam Instrumentation
Studies
Data Acquisition
RF
Recycler
Mountain Range
Main Injector
Shot Data Analysis (SDA)
02 Mar 2010
3552-v1 A 15-Hz spill cycle scenario for Mu2e Chandrashekhara M. Bhat et al. RF
Accumulator
Debuncher
Beam Dynamics
16 Feb 2010
3293-v1 Reports on the development of the BETACOOL code for simulating cooling processes in the Recycler ring Alexander Smirnov et al. Beam Dynamics
Beam Physics
Stochastic Cooling
Electron Cooling
30 Jan 2009
3268-v2 Creating and Accelerating Flat Bunches in the LHC Chandrashekhara M. Bhat Upgrades
15 Dec 2008
3220-v2 Preparation of Accelerator Complex for Muon Physics Experiments at Fermilab Chuck Ankenbrandt et al. Antiproton Source
28 Oct 2008
3192-v1 RF Requirements for Bunching in the Recycler for Injection Into the g-2 Ring Chandrashekhara M. Bhat et al. Beam Dynamics
Recycler
28 Aug 2008
3167-v1 Cooling the Hot Momentum Beam after the Tev Shots Chandrashekhara M. Bhat et al. Studies
Beam Dynamics
RF
Recycler
27 Jul 2008
3082-v1 Can we combine the High Energy mu+ and mu- Coalescing Rings into One? Chandrashekhara M. Bhat Muon Collider
29 Apr 2008
336-v1 Shielding Assessment of the Main Injector Complex Chandrashekhara M. Bhat et al. Studies
19 Nov 2007
2884-v2 Reconstruction of Longitudinal Phase-space by Monte Carlo Method Chandrashekhara M. Bhat Beam Dynamics
RF
Recycler
05 Oct 2007
2831-v1 ENVELOPE AND MULTI-SLIT EMITTANCE MEASUREMENTS AT FERMILAB A0-PHOTOINJECTOR AND COMPARISON WITH SIMULATIONS Chandrashekhara M. Bhat et al. Experiments
06 Jul 2007
2811-v1 RR RF Calibration by Measuring the Synchrotron Frequency in Linear Bucket Chandrashekhara M. Bhat et al. Studies
Beam Dynamics
13 Jun 2007
2768-v1 Compound bucket study Chandrashekhara M. Bhat et al. Studies
Beam Dynamics
Electron Cooling
03 May 2007
2558-v1 Improvements in Momentum Mining for Tevatron Shots Chandrashekhara M. Bhat Beam Dynamics
15 Nov 2006
2355-v1 Preventing onset of beam instabilities in the e-cooled Chandrashekhara M. Bhat Beam Dynamics
20 Jul 2006
2313-v2 Strip-Mining Chandrashekhara M. Bhat et al. Beam Dynamics
29 Jun 2006
2226-v1 Proton Stacking in the Recycler Chandrashekhara M. Bhat Beam Dynamics
SNuMi
Beam Dynamics
17 Apr 2006
2209-v1 APPLICATIONS OF BARRIER –BUCKET RF SYSTEMS AT FERMILAB Chandrashekhara M. Bhat Beam Dynamics
Electromagnetic Calculations
Beam Dynamics
15 Mar 2006
2208-v1 Bunch compression and stretching using barrier rf system Chandrashekhara M. Bhat Beam Dynamics
Longitudinal Dynamics
Beam Dynamics
15 Mar 2006
2174-v1 A 20 GeV Coalescing Ring for a Muon Collider Chandrashekhara M. Bhat Future Accelerators
26 Feb 2006
2173-v2 Innovative Beam Physics for High Luminosity at Hadron Colliders Chandrashekhara M. Bhat Accumulator
Beam Dynamics
Longitudinal Dynamics
Beam Dynamics
Beam Studies
26 Feb 2006
2057-v1 Pbar Stacking in the Recycler:Longitudinal Phase-space Coating Chandrashekhara M. Bhat Beam Dynamics
Longitudinal Dynamics
17 Dec 2005
745-v1 Gated Current Integrator for the Beam in the RR Barrier Bucket Chandrashekhara M. Bhat et al. LLRF
Beam Dynamics
Beam Instrumentation
RF
LLRF
13 Dec 2005
2034-v2 Recycling pbars in the Main Injector- Issues Chandrashekhara M. Bhat Beam Dynamics
01 Dec 2005
841-v7 Pbar acceleration in MI using 2.5 MHz and 53 MHz rf Systems Chandrashekhara M. Bhat et al. RF
Controls
HLRF
Studies
LLRF
Longitudinal Dynamics
HLRF
Beam Dynamics
07 Nov 2005
1851-v1 ISO-ADIABATIC MERGING OF PBAR STACKS IN THE FERMILAB RECYCLER Chandrashekhara M. Bhat Beam Dynamics
Longitudinal Dynamics
Alignment
31 May 2005
1850-v1 A NEW TECHNIQUE FOR MAKING BRIGHT PROTON BUNCHES USING BARRIER RF SYSTEMS Chandrashekhara M. Bhat Longitudinal Dynamics
Beam Dynamics
31 May 2005
1744-v3 A New Scheme for Producing Bright Proton Bunches in MI for Tevatron Shots Chandrashekhara M. Bhat Run II
Beam Dynamics
18 Mar 2005
1468-v1 Momentum Mining in the Recycler Chandrashekhara M. Bhat Beam Dynamics
Longitudinal Dynamics
22 Nov 2004
1442-v1 Novel Beam Manipulation Techniques for Fermilab Run II and Beyond Chandrashekhara M. Bhat Beam Dynamics
Beam Dynamics
11 Nov 2004
1425-v3 MI SBD Specifications Chandrashekhara M. Bhat Operations
Beam Instrumentation
29 Oct 2004
1400-v1 Main Injector Bunch Shapes from WCM- pbar production Chandrashekhara M. Bhat Beam Instrumentation
Instrumentation/beam Physics
Sampled Bunch Display (SBD)
29 Oct 2004
1401-v1 Schemes for Producing High Intensity Low- Longitudinal Emittance Proton Bunches for the Tevatron Collider Shots Chandrashekhara M. Bhat MI-Dept
Beam Dynamics
09 Oct 2004
1395-v4 Schemes for Producing High Intensity Low-longitudinal Emittance Proton Bunches for the Tevatron Collider Chandrashekhara M. Bhat Beam Dynamics
09 Oct 2004
1380-v1 Some MI proton longitudinal pulse shapes Chandrashekhara M. Bhat Beam Instrumentation
Sampled Bunch Display (SBD)
28 Sep 2004
1345-v1 Documents for New MI SBD Chandrashekhara M. Bhat et al. Beam Instrumentation
Sampled Bunch Display (SBD)
22 Sep 2004
1338-v1 MI SBD pbar data plots Chandrashekhara M. Bhat Beam Instrumentation
Intensity Measurements
Sampled Bunch Display (SBD)
09 Sep 2004
933-v2 Pbar Momentum Mining in the Recycler :simulations and beam studies Chandrashekhara M. Bhat Operations
Studies
Beam Dynamics
RF
28 Jan 2004
890-v1 Longitudinal Emittance Measurement in MI SBD: How and why? Chandrashekhara M. Bhat Studies
Longitudinal Dynamics
30 Oct 2003
864-v3 Pbar acceleration in the MI using 2.5 MHz and 53 MHz rf Systems Chandrashekhara M. Bhat et al. Operations
HLRF
Studies
Project
LLRF
09 Oct 2003
742-v1 Proton Deceleration from 150 GeV to 8.9 GeV in the Main Injector: Simulations and Beam Tests Chandrashekhara M. Bhat Beam Instrumentation
Studies
LLRF
Beam Dynamics
25 Jul 2003
148-v2 AP4 Beam Dump and Allowed Beam Intensity Limit During the Construction Phase of theMI-8 GeV Beam-line Chandrashekhara M. Bhat ES&H
Beam Dynamics
10 Jul 2003
105-v1 Radiation Levels in the 8 GeV Beamline Arising from the Tevatron Beam Losses Chandrashekhara M. Bhat et al. ES&H
24 Jun 2003
368-v1 The Effects of Antiproton Beam Ionization: First Glance Chandrashekhara M. Bhat et al. Beam Dynamics
20 Jun 2003
484-v1 Notes for MI/RR Group Meeting of 26 Feb 2003 Chandrashekhara M. Bhat et al. MI-RR-Group
RF
Beam Instrumentation
RF
BPM
10 Mar 2003
483-v1 RR RF Issues Revisited Chandrashekhara M. Bhat Beam Dynamics
10 Mar 2003
435-v1 RR pbar Longitudinal Emittance during Beam stacking and Unstacking Chandrashekhara M. Bhat Beam Dynamics
13 Feb 2003
744-v1 Simulation of Pbar Stacking and Un-Stacking in the Recycler Ring Chandrashekhara M. Bhat RF
Beam Instrumentation
Studies
Beam Dynamics
01 Sep 2002
376-v1 A First Look at the Longitudinal Emittance in the Fermilab Recycler Ring Chandrashekhara M. Bhat Beam Dynamics
Beam Instrumentation
RF
02 Aug 2002
352-v1 Preparing the Proton Bunches in 2.5 MHz Buckets for MI Tune-up Chandrashekhara M. Bhat RF
Beam Instrumentation
Beam Dynamics
01 Jun 2001
743-v1 Pbar Acceleration in the MI using 2.5 MHz Coalescing RF system: Tune-up Study Scheme with proton beams and Operational Implementation Chandrashekhara M. Bhat et al. RF
Beam Instrumentation
LLRF
LLRF
14 Feb 2001
362-v1 Pbar Acceleration in the Main Injector RR/AR - MI - Tevatron - Simulations and Tune up Studies Using Protons Chandrashekhara M. Bhat RF
Beam Instrumentation
Studies
20 Nov 2000
354-v1 Pbar Acceleration in the Main Injector for Run II: ESME Simulations Chandrashekhara M. Bhat et al. RF
Beam Instrumentation
Studies
26 Jul 2000
353-v1 Slow Deceleration of Anti-Proton Beam in the MI: RF Specifications Chandrashekhara M. Bhat RF
Beam Instrumentation
12 Jun 2000
349-v1 Anti-Proton Beam Acceleration in the MI and RF Specifications Chandrashekhara M. Bhat RF
Beam Instrumentation
26 Jan 2000
315-v1 Main Injector and Recycler Ring Shielding Assessment Chandrashekhara M. Bhat et al. ES&H
Studies
01 Jul 1998
309-v2 Ground Water, Air-Borne and Soil Activation from the Operation of the MI-40 Beam Absorber During the FMI Era Chandrashekhara M. Bhat ES&H
01 Dec 1997
305-v2 A Preliminary Analysis of Ground-Water and Surface-Water Radioactivity Around the Main Injector Extraction and Injection Regions Chandrashekhara M. Bhat et al. ES&H
Studies
01 Nov 1997
308-v1 Main Injector Intensity Limitations at Transition Chandrashekhara M. Bhat Meetings
Tevatron Group
Beam Dynamics
29 Sep 1997
307-v2 Shielding Assessment of F0 to Switchyard Beam Line Enclosure for MI 120 GeV Beam Transport Chandrashekhara M. Bhat Transfer Lines
ES&H
Beam Dynamics
16 Sep 1997
289-v1 Main Injector 8 GeV Beam Line Shielding Assessment Chandrashekhara M. Bhat et al. ES&H
Magnets
17 Feb 1997
235-v1 Groundwater, Air-Borne and Soil Activation from the Operation of the Temporary Beam Absorber in the MI-8 GeV Beam Line Chandrashekhara M. Bhat et al. ES&H
Civil
25 Jan 1997
211-v2 Ground-water Activation from the Operation of MI40 Beam Absorber Chandrashekhara M. Bhat et al. ES&H
Design Properties
28 Aug 1996
197-v1 8 GeV Beam Absorber for Beam Line Commissioning Chandrashekhara M. Bhat et al. ES&H
Design Properties
Commissioning
31 Jul 1996
146-v2 Radiation Level in the Intersection Region of AP2 and 8 GeV Beam-line due to Beam Loss in the AP2 Beam-line Chandrashekhara M. Bhat et al. ES&H
Beam Dynamics
23 Aug 1995
136-v2 µ-Dose Level in the Vicinity of the Intersection of the 8 GeV and the AP2-Beamlines Chandrashekhara M. Bhat ES&H
Beam Dynamics
28 Jun 1995
106-v2 An Air-Cooled FMI Abort Dump? Chandrashekhara M. Bhat et al. Water
Design Properties
04 Apr 1994
100-v1 Radiation Levels in the MI-60 Enclosure from Tevatron Beam Losses Chandrashekhara M. Bhat ES&H
Civil
Beam Dynamics
08 Nov 1993
95-v1 Radioactivity of the Closed Loop Cooling Water of the Main Injector Beam Abort Dump Chandrashekhara M. Bhat ES&H
Design Properties
01 Sep 1993
88-v3 Radiation Shieldings for MI Culverts Chandrashekhara M. Bhat ES&H
Civil
Design Properties
01 Aug 1993
87-v2 A Design Study of the MI40 Beam-Abort Dump Chandrashekhara M. Bhat ES&H
Design Properties
29 Jul 1993
82-v1 Summary of the Existing MR Beam Diagnostics for Use in Main Injector Chandrashekhara M. Bhat et al. Beam Instrumentation
Beam Dynamics
01 Mar 1993
64-v1 Proposal for Experimental Test of RF Harmonic Transition Crossing in the Main Ring Chandrashekhara M. Bhat et al. Lattice
28 Jun 1991

Number of documents found: 99

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.28 usr + 0.07 sys = 0.35 CPU)