Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Fermilab Main Injector and sub-topics are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
4947-v2 Operation of SEY Test Stand Experiment at MI-10 Jeffrey Eldred LabVIEW
Other
Beam Instrumentation
06 Sep 2017
4046-v3 Activation of Steel and Copper Samples in the Main Injector Collimator Region Bruce C. Brown ES&H
Collimation
Energy Deposition
01 Jun 2017
5382-v1 MAIN INJECTOR NOTES Bruce C. Brown Project
Design Properties
11 May 2017
5353-v2 Investigation Into MI52 Septa Wire Failures Michael R Backfish Beam Physics
Main Injector
SY120
23 Mar 2017
4519-v1 Studies of MI Beam Intensity, Loss and Activation Patterns Bruce C. Brown ES&H
DCCTs
Beam Instrumentation
16 Feb 2017
1256-v1 Talk on DC Current Transformer (DCCT) System Aisha Ibrahim et al. Front-end Systems
Instrumentation
Front-end Documentation
Talks
Beam Instrumentation
Front-end Services
Intensity Measurements
Instrumentation
DCCTs
Beam Instrumentation
Instrumentation/beam Physics
16 Feb 2017
899-v2 Operations of the New MI and RR DCCT front-end Tom Meyer Acnet
Beam Instrumentation
Beam Instrumentation
Data Acquisition
03 Mar 2004
1274-v1 Talk on Toroid-based Integrated Beam Intensity Monitor System Aisha Ibrahim Talks
Beam Instrumentation
Intensity Measurements
Beam Instrumentation
Instrumentation/beam Physics
16 Feb 2017
5318-v1 Fermilab Proton Improvement Plans Vladimir Shiltsev Beam Physics
General
Operations
26 Jan 2017
5247-v1 MI8 line Beam emittance measurement Ming-jen Yang Main Injector
Booster
Recycler
06 Oct 2016
5061-v6 Structural Support Design Guidelines Christine R. Ader et al. Magnets
Muon
Magnets
Alignment
Alignment
Alignment
Design Properties
Magnets
Magnets
Magnets
25 Aug 2016
5199-v1 Progress towards 700 kW operations in the Main Injector Rob Ainsworth Beam Physics
Main Injector
Accelerator Seminar
Recycler
26 Jul 2016
4896-v2 Collimation Design using Reduced Courant-Snyder Coordinates Bruce C. Brown Lattice
Collimation
Energy Deposition
27 May 2016
4982-v2 Aperture Implications for Recycler Assuming Full Coupling and Nominal Vertical Apertures Bruce C. Brown Collimation
Collimation
Lattice
12 May 2016
5153-v1 MIBLMS Open Access Client Kyle J Hazelwood Alarms
Controls
Beam Loss Monitors (BLM)
Operations
Controls
Beam Instrumentation
Operations
Beam Instrumentation
06 May 2016
4514-v1 Tomography And Related Diagnostics In Synchrotrons: Users Guide Duncan J Scott Longitudinal Dynamics
Beam Instrumentation
Beam Instrumentation
16 Mar 2016
5042-v1 Tipping Analysis for 3 Point Stands Kris A Anderson Magnets
Other
Other
Civil
Design Properties
Other
Magnets
11 Jan 2016
2433-v11 BLM Upgrade Controller Card Program Design Randy M Thurman-Keup Run II Upgrades
Instrumentation
Beam Loss Monitors (BLM)
Beam Instrumentation
16 Oct 2015
4944-v1 Plan for Establishing 700kW Operations Ioanis Kourbanis Main Injector
Recycler
10 Sep 2015
4945-v1 Introduction -- 700kW Followup Review Mary Convery Main Injector
PIP
Recycler
10 Sep 2015
4867-v1 Calibration of BLM Response to Proton Loss Bruce C. Brown ES&H
Collimation
Beam Loss Monitors (BLM)
Beam Instrumentation
30 Jun 2015
4827-v5 XFR Modification to Resetting Beam Sync (AA) and Offset Beam Sync (OAA) Craig C Drennan Operations
LLRF
RF
RF
LLRF
LLRF
05 Jun 2015
4829-v1 Main Injector/Recycler Magnet Failure Form David P Capista Magnets
Magnets
Main Injector
Recycler
12 May 2015
4828-v1 Main Injector/Recycler Magnet Failure Tag David P Capista Magnets
Magnets
Main Injector
Recycler
12 May 2015
929-v3 ACL An Introduction Brian S. Hendricks Controls Working Group
Controls
Controls
General
Controls
Controls
Console Applications
ACNET
06 May 2015
4775-v1 Performing Vacuum Calculations Using ANSYS Kris A Anderson Vacuum
Vacuum
Vacuum
Vacuum
Vacuum
Vacuum/Water/Utilities
Vacuum
27 Feb 2015
4723-v1 Tunnel Cable Clean-up Memos Paul PCC Czarapata ES&H
ES&H
22 Dec 2014
4692-v1 Loss History in Main Injector: LI619A-LI621 and LI101C-LI107 Bruce C. Brown BPM
Beam Loss Monitors (BLM)
Operations
28 Oct 2014
4645-v1 PIP and PIP-II Status and Plans Sergei Nagaitsev Main Injector
Booster
Recycler
25 Jul 2014
4633-v2 Functional Requirement Specification Performance of the MI EBP Randy M Thurman-Keup Instrumentation
Beam Instrumentation
21 Jul 2014
4617-v1 Main Injector Pond temperatures David P Capista Operations
12 Jun 2014
4606-v1 Doubling the Main Injector Beam Power Ioanis Kourbanis Main Injector
Accelerator Seminar
PIP
Recycler
20 May 2014
4599-v2 Cable Mitigation at MI House 10 Elliott S McCrory et al. BPM
Beam Instrumentation
16 May 2014
4504-v2 Tomography And Related Diagnostics In Synchrotrons: An Introduction Duncan J Scott Longitudinal Dynamics
Beam Instrumentation
Beam Instrumentation
09 Jan 2014
4497-v1 PIP-II: A Plan for Developing Multi-MW Capabilities at Fermilab & Overview of Physics Opportunities with High-intensity Proton Beams Stephen D. Holmes et al. Future Accelerators
Main Injector
Upgrades
Accelerator Seminar
12 Dec 2013
4340-v2 Accuracy and Performance Upgrade of PIC and Hybrid Space-Charge Solvers Leonid Vorobiev Beam Dynamics
Beam Dynamics
Beam Dynamics
Multiparticle
12 Nov 2013
4460-v1 A Collimation Mask at MI308 to Protect RR to MI Injection Kickers Bruce C. Brown Collimation
15 Oct 2013
4457-v1 Replacement Primary Collimator for Main Injector Bruce C. Brown et al. Collimation
02 Oct 2013
4436-v3 Distortion in Resistive Wall Current Monitor Signal Transmission Lines Duncan J Scott Beam Physics
Beam Instrumentation
05 Sep 2013
4381-v2 Status of the New MI and RR Beam Profiling Measurement Devices Randy M Thurman-Keup et al. Beam Instrumentation
Accelerator Seminar
Beam Instrumentation
Beam Instrumentation
11 Jun 2013
1927-v2 Beam Acceleration Capabilities of the Present MI RF System Ioanis Kourbanis RF
10 May 2013
4349-v5 Main Injector and Recycler: Ready for NoVa and Beyond Duncan J Scott Main Injector
Accelerator Seminar
Recycler
24 Apr 2013
4350-v3 Main Injector and Recycler Ready for NOνA and beyond Duncan J Scott Main Injector
24 Apr 2013
4309-v1 Notes on the Main Ring Spill Control Bucker System Bruce C. Brown Extraction
Magnets
07 Mar 2013
4294-v1 The Fermilab Main Injector Technical Design Handbook Management of Main Injector Project Main Injector
Project
Design Properties
15 Feb 2013
4244-v1 Meeting Notes from RR BPM System -- November 1, 2012 Phil Adamson et al. BPM
BPM
Beam Instrumentation
01 Nov 2012
4190-v1 MI injector machine octupole content measurement Denton K Morris et al. Magnets
30 Jul 2012
4185-v1 MI8 line Emittance Monitor upgrade simulation Ming-jen Yang Lattice
NOvA
27 Jul 2012
4184-v1 MI8 line at Recycler Energy Ming-jen Yang Transfer Lines
Beamline
Transfer Lines
27 Jul 2012
4169-v1 Main Injector Slow Extraction Studies Yuri Alexahin et al. Extraction
29 Jun 2012
4131-v1 MI and Recycler Injection in the NOvA Era Ioanis Kourbanis LLRF
LLRF
LLRF
17 May 2012
367-v3 Determining the Radius and Energy of the Recycler Ring Ioanis Kourbanis BPM
RF
Beam Instrumentation
Studies
17 May 2012
3980-v2 Analysis Procedures for Al Activation Studies Bruce C. Brown ES&H
Collimation
Beam Loss Monitors (BLM)
Energy Deposition
Beam Instrumentation
09 Apr 2012
2201-v4 Beam collimation in the transfer line from 8~GeV linac to the Main Injector Alexandr Drozhdin Project
Collimation
Proton Plan
27 Jan 2012
3991-v1 Proposal to Create a Tomoscope Application for the Fermilab Main Injector Jerry Cai et al. Beam Dynamics
Controls
Operations
Beam Instrumentation
09 Nov 2011
3898-v1 BLM Upgrade Project Abort Card Specification Michael J. Utes Instrumentation
Beam Instrumentation
06 Jul 2011
3857-v1 Main Injector Counterwave Properties and MI300 Collimator Motion Limits Bruce C. Brown Lattice
Transfer Lines
Collimation
Console Applications
Transfer Lines
26 Apr 2011
3756-v1 POSINST Simulations and Problems Xiaolong Zhang Beam Dynamics
Beam Physics
16 Dec 2010
3717-v1 Comparison of Short Term Cooldown Data for MI Collimator C307 Near Beam and Beside Marble Shielding Amir Jaehoon Safavi ES&H
17 Nov 2010
3716-v1 MI BEAM POWER FOR DIFFERENT BEAM ENERGIES Ioanis Kourbanis Main Injector
16 Nov 2010
3683-v1 SC Main Injector Henryk Piekarz Magnets
27 Sep 2010
3678-v1 MFC DSP Software Outline Philip Varghese LLRF
LLRF
ILCTA
LLRF
23 Sep 2010
3676-v1 Multi‐cavity Field Control (MFC) Module Description Philip Varghese LLRF
LLRF
NML
LLRF
23 Sep 2010
3669-v1 Bunch coalescing study at low energy Anna Yagodnitsyna RF
10 Sep 2010
3649-v2 8-GeV Pbar Horizontal instability in Main Injector Ming-jen Yang et al. Main Injector
Instabilities
10 Aug 2010
3648-v1 P1 line to Tevatron injection lattice study Ming-jen Yang Optics
Transfer Lines
Beam Transfer
02 Aug 2010
1748-v2 OBSOLETE Duane C Voy Beam Line Tuner (BLT)
Beam Instrumentation
07 Jul 2010
3352-v1 Electron Beam Profiler for Project-X Randy M Thurman-Keup Beam Instrumentation
Project X
24 Jun 2010
1410-v10 BLM Upgrade Users' Guide Alan Baumbaugh et al. TeV ABORT
Instrumentation
Beam Instrumentation
Beam Loss Monitors (BLM)
Beam Instrumentation
21 Jun 2010
3629-v1 Loss and Residual Radiation at MI400 for 2010 Shutdown Preparation Bruce C. Brown Collimation
Beam Loss Monitors (BLM)
Operations
Beam Instrumentation
16 Jun 2010
3613-v1 Systems-Instrumentation-SDA meeting of May 11, 2010 Jerry Annala et al. Main Injector
Instrumentation
Tevatron
18 May 2010
147-v2 Thermal Tests of an Insulated Coil Philip S. Martin et al. Magnets
Studies
23 Apr 2010
3572-v1 Instrumentation-Systems-SDA meeting of February 9, 2010 Andreas Jansson et al. Main Injector
Booster
Tevatron
13 Mar 2010
3571-v1 Instrumentation-Systems-SDA meeting of March 9, 2010 Andreas Jansson et al. Main Injector
Tevatron
13 Mar 2010
3568-v1 Predicting Residual Radiation using Beam Loss Data - Early Results Bruce C. Brown ES&H
Beam Loss Monitors (BLM)
Operations
MI-Dept
Beam Instrumentation
11 Mar 2010
3562-v1 MI -> RR Injection Phase and Energy Mismatch: Measurements using W24 Chandrashekhara M. Bhat et al. Main Injector
RF
Studies
Shot Data Analysis (SDA)
Talks
RF
Beam Instrumentation
Studies
Recycler
Beam Instrumentation
Mountain Range
Data Acquisition
02 Mar 2010
3529-v1 Expected Activation of SmCo5 Beam Line Magnets Bruce C. Brown Magnets
ES&H
NOvA
Transfer Lines
05 Jan 2010
3526-v1 The SEY Test Stand Robert M Zwaska Beam Dynamics
Instabilities
Project X
17 Dec 2009
3523-v1 Residual Radiation Monitoring in the Main Injector with the ROTEM RAM DA3-2000 Radiation Survey Meter Bruce C. Brown Other
16 Dec 2009
3513-v1 Instrumentation-Systems-SDA meeting of December 2, 2009 Denton K Morris et al. Main Injector
Booster
Tevatron
11 Dec 2009
3500-v1 ECLOUD Clearing Electrode and Detector Alex Chen Vacuum
Vacuum
Instabilities
Talks
19 Nov 2009
3458-v1 Some Initial ECloud Measurements Robert M Zwaska Beam Dynamics
Instabilities
25 Sep 2009
1270-v1 Echotek Based Main Injector Beam Line Tuner Front-end Operation Duane C Voy Front-end Systems
BPM
Beam Line Tuner (BLT)
Beam Instrumentation
11 Sep 2009
3418-v1 Instrumentation-Systems-SDA meeting of June 10, 2009 Andreas Jansson et al. Main Injector
Tevatron
29 Jun 2009
3299-v2 Some Console Applications for Displaying Main Injector BLM Measurements Bruce C. Brown et al. Collimation
Beam Loss Monitors (BLM)
Operations
Console Applications
Beam Instrumentation
24 Jun 2009
3385-v1 Instrumentation-Systems-SDA meeting of May 6, 2009 Craig R. McClure et al. Main Injector
Instrumentation
08 May 2009
3350-v1 Instrumentation-Systems-SDA meeting of April 1, 2009 Andreas Jansson et al. Main Injector
Instrumentation
Tevatron
06 Apr 2009
3324-v1 Instrumentation-Systems-SDA meeting of March 4, 2009 Craig R. McClure et al. Main Injector
SDA
Instrumentation
Tevatron
10 Mar 2009
3130-v5 MINU/Gap Clearing Kicker Shutdown Schedule Ken Domann Magnets
Main Injector
MINU GPP
25 Feb 2009
3296-v3 Main Injector proton coalescing efficiency and proton multibatch operation - Some observations Vaia Papadimitriou Main Injector
SDA
16 Feb 2009
3298-v1 Instrumentation-Systems-SDA meeting of February 4, 2009 Craig R. McClure et al. Main Injector
SDA
Instrumentation
Tevatron
09 Feb 2009
3295-v1 Improved Measurement of Main Injector Collimation Efficiency for Uncaptured Beam Bruce C. Brown Collimation
Beam Loss Monitors (BLM)
Proton Plan
02 Feb 2009
3278-v1 Instrumentation-Systems-SDA meeting of January 7, 2009 Andreas Jansson et al. Main Injector
SDA
Instrumentation
Tevatron
Recycler
13 Jan 2009
3281-v1 Microwave Electron Cloud Measurements in the Main Injector James L. Crisp et al. Beam Instrumentation
Project X
13 Jan 2009
2330-v1 Beam collimation in the Main Injector at Slip-Stacking Injection Bruce C. Brown et al. Project
Collimation
09 Jan 2009
2329-v1 Beam Loss Simulation in the Main Injector at Slip-Stacking Injection Bruce C. Brown et al. Project
Collimation
09 Jan 2009
3219-v1 Analysis of Some Crude Main Injector Radiation Cool-down Data Bruce C. Brown ES&H
Operations
03 Oct 2008
3191-v2 Sextupole Feed-down effect due to counter-waves in Main Injector and Recycler Ming-jen Yang Lattice
Lattice
29 Aug 2008
3043-v2 Tevatron and Main Injector Sampled Bunch Displays Randy M Thurman-Keup Sampled Bunch Display (SBD)
Instrumentation
Beam Instrumentation
20 Aug 2008
2825-v4 Correcting the Accumulator Extraction Energy and Phase Steve Werkema LLRF
RF
28 Jul 2008
3124-v1 FNAL Accelerator Complex Status Ron Moore Main Injector
External Beams
Booster
Tevatron
Operations
Recycler
Linac
Antiproton Source
20 Jun 2008
961-v1 Painting injection to the Fermilab Main Injector Alexandr Drozhdin et al. Project
02 Jun 2008
2198-v1 Beam collimation in the Main Injector Bruce C. Brown et al. Project
Collimation
02 Jun 2008
2199-v1 Painting injection at 8~GeV to the Main Injector Alexandr Drozhdin Beam Dynamics
Project
02 Jun 2008
2200-v1 Painting injection at 8~GeV to the Main Injector Alexandr Drozhdin Beam Dynamics
Project
02 Jun 2008
2202-v1 Lifetime of Stark States Hydrogen Atom in Magnetic Field Calculation and Estimation of Losses at Stripping Injection Weiren Chou et al. Project
02 Jun 2008
3090-v1 Tevatron Fixed Target Redux and the NuSOnG Proposal Michael J. Syphers Extraction
Main Injector
External Beams
Tevatron
SY120
06 May 2008
3078-v1 The bunch length measurement with the wall current monitor Ivan Kabardin Main Injector
Instrumentation
Beam Instrumentation
28 Apr 2008
3077-v1 BLM Upgrade - Digitizer Card Operating Guide Randy M Thurman-Keup Instrumentation
Beam Loss Monitors (BLM)
Beam Instrumentation
24 Apr 2008
1930-v1 Un-suppressing MI30 dispersion function for momentum scraping David E. Johnson et al. Lattice
Collimation
Operations
22 Apr 2008
1960-v1 Potential MI Collimation Scheme with MI30 Dynamic Dispersion Insert David E. Johnson Lattice
Collimation
22 Apr 2008
2261-v2 Potential Collimation Scheme using a Dynamic Dispersin Bump In MI30 Straight David E. Johnson Lattice
Collimation
22 Apr 2008
2316-v1 Thoughts on Collimation David E. Johnson Other
Collimation
22 Apr 2008
2315-v3 Dynamic Dispersion for Main Injector Collimation David E. Johnson Lattice
Collimation
22 Apr 2008
1926-v2 Reducing Losses in Main Injector by MI8 Line Scraping Bruce C. Brown et al. Studies
Transfer Lines
Collimation
Electron Cooling
22 Apr 2008
1977-v1 MI8 Beamline Collimation Design Bruce C. Brown Transfer Lines
Collimation
22 Apr 2008
2287-v1 Mechanical Design of MI8 Collimators Bruce C. Brown et al. Transfer Lines
Collimation
22 Apr 2008
2299-v1 Alignment Check for MI8 Collimators Bruce C. Brown Alignment
Transfer Lines
Collimation
22 Apr 2008
2388-v2 Thermal Calculation for MI8 Collimators Bruce C. Brown et al. Transfer Lines
Collimation
22 Apr 2008
2426-v2 MARS15 Calculations for MI8 Collimator Design Bruce C. Brown et al. ES&H
Transfer Lines
Collimation
Proton Plan
22 Apr 2008
2618-v1 First Results from MI8 Collimator Use Phil Adamson et al. ES&H
Studies
Transfer Lines
Collimation
22 Apr 2008
2803-v1 Measurement of Booster Beam Halo using the C836A and C838A Collimators in the MI8 Beamline Bruce C. Brown Other
Transfer Lines
Collimation
Beam Loss Monitors (BLM)
Proton Plan
22 Apr 2008
2881-v2 Main Injector Collimation System Hardware Bruce C. Brown ES&H
Collimation
Proton Plan
Operations
22 Apr 2008
3045-v6 Gap Cleaning in the MI using RF Barrier Weiren Chou et al. Extraction
HLRF
HLRF
Operations
29 Feb 2008
336-v1 Shielding Assessment of the Main Injector Complex Chandrashekhara M. Bhat et al. Studies
19 Nov 2007
2591-v1 Fourier Analysis of MI TBT data Eliana Gianfelice-Wendt Beam Dynamics
10 Oct 2007
2732-v4 Main Injector BPM Project Closeout Report Bakul Banerjee et al. BPM
BPM
31 Aug 2007
2838-v1 A List of Noisy MI BPMS Robert K Kutschke BPM
17 Jul 2007
2834-v1 Main Injector Residual Radiation Data 2004 - 2007 Bruce C. Brown ES&H
11 Jul 2007
2810-v1 On possibility to compensate space charge effects by controlled electron columns Vladimir Shiltsev Beam Dynamics
Beam Dynamics
Transverse Dynamics
Beam Dynamics
SNuMi
13 Jun 2007
2769-v1 Results of pre-WQB installation Lambertson Scans David E. Johnson et al. Lattice
Alignment
Transfer Lines
04 May 2007
2751-v1 Main Injector Average Quadrupole Strengths David J. Harding Magnets
23 Apr 2007
2726-v0 Survey of Data from the Upgraded MIBPM System Robert K Kutschke BPM
05 Apr 2007
2678-v1 Delivering Protons to the Antiproton Source after the Tevatron Collider Era Chuck Ankenbrandt et al. NuMI
Future Accelerators
Main Injector
Recycler
Antiproton Source
06 Mar 2007
2674-v1 Main Injector stray beam clearing options Ming-jen Yang Operations
05 Mar 2007
2360-v3 VME Base Address Switch Settings for the BLM System Kelly L Knickerbocker Beam Loss Monitors (BLM)
Beam Instrumentation
23 Feb 2007
2645-v1 Record Luminosities at the Tevatron & Future Potentiality Steve Werkema BPM
Main Injector
Tevatron
Recycler
Antiproton Source
20 Feb 2007
2579-v1 Electron Cloud Instabilities Robert M Zwaska Beam Dynamics
Proton Driver
Instabilities
SNuMi
06 Dec 2006
2083-v2 MIBPM Electronics Bill Haynes et al. BPM
05 Sep 2006
2578-v1 MI BPM Upgrade Crate Specification Bob Forster BPM
BPM
06 Dec 2006
2563-v1 Application of MI BPM data for beam study Ming-jen Yang BPM
21 Nov 2006
2479-v2 Operational Aspects of the MI Large Aperture Quadrupole (WQB) Weiren Chou Magnets
Proton Plan
14 Nov 2006
1526-v6 MI BPM Meeting Notes and Minutes Steve Wolbers BPM
BPM
08 Nov 2006
2543-v1 The MI Wide Aperture Quadrupole (WQB) Project Weiren Chou et al. Magnets
Accelerator Seminar
Magnets
03 Nov 2006
2536-v1 Resolution Studies for Pbar Position with new MIBPM Robert K Kutschke BPM
24 Oct 2006
2510-v2 MIBPM Users Guide Steve Foulkes et al. BPM
BPM
13 Oct 2006
2513-v1 MIBPM Noise Studies on VP515 Robert K Kutschke BPM
10 Oct 2006
2493-v1 Finding the First and Last turns of an Injection or Extraction Flash Robert K Kutschke BPM
03 Oct 2006
2301-v3 Proposed MI BPM 2.5MHz Transition Board Gains Bob Webber BPM
BPM
Beam Instrumentation
03 Oct 2006
2475-v1 Reminder of Some Beams DocDB Features Bruce C. Brown et al. Other
27 Sep 2006
2469-v1 MI BPM Board-by-Board Gain Values Marv Olson et al. BPM
BPM
Beam Instrumentation
22 Sep 2006
2461-v2 MIBPMs at 60N and 60S before and after addition of caps at 60N Robert K Kutschke BPM
20 Sep 2006
2459-v1 Response of Echotek to low Frequency noise Robert K Kutschke BPM
19 Sep 2006
2453-v2 Proposed MI BPM 53 MHz Channel Transition Board Gain Settings Robert Dysert et al. BPM
BPM
Beam Instrumentation
15 Sep 2006
2317-v4 Main Injector HLRF Anode Limit Program & Cavity Tuner RF Voltage Limit Tim G. Berenc et al. RF
HLRF
Proton Plan
14 Sep 2006
2450-v2 MI BPM Meeting Bob Webber et al. BPM
13 Sep 2006
2451-v1 More MIBPM TxT Noise Studies Robert K Kutschke BPM
12 Sep 2006
1951-v1 Monthly Report of the MI BPM Upgrade Project Bakul Banerjee et al. BPM
BPM
11 Sep 2006
2446-v1 AntiProton Turn by Turn data from MIBPMs Robert K Kutschke BPM
08 Sep 2006
2438-v1 Studies of Timing and Noise on the Upgraded MI BPMs Robert K Kutschke BPM
05 Sep 2006
2437-v1 Flash Measurements in the Main Injector BPM System Steve Foulkes Beam Instrumentation
05 Sep 2006
2435-v1 Specification for a MI BPM diagnostics program Marv Olson et al. BPM
Beam Instrumentation
01 Sep 2006
2428-v1 MI BPM alarms David P Capista BPM
30 Aug 2006
2424-v1 Pbar Turn by Turn data from MIBPMs Robert K Kutschke BPM
29 Aug 2006
2422-v1 Main Injector BPM signoff forms David P Capista BPM
BPM
29 Aug 2006
2421-v1 Study of Low Frequency Noise on MIBPMs operated at 2.5 MHz Robert K Kutschke BPM
29 Aug 2006
2411-v1 Measurements of Crosstalk and High Frequency Signal Suppression for the Main Injector BPM Transition Board Andrea L Saewert BPM
Beam Instrumentation
24 Aug 2006
2404-v1 MIBPM Validation Studies - Part 1 Robert K Kutschke BPM
22 Aug 2006
2391-v1 Timing Comparison of Pbars in Main Injector to Recycler and to Tevatron Steve Foulkes et al. BPM
BPM
Beam Instrumentation
15 Aug 2006
2382-v1 Using MathCad to Generate a Polynomial for Computation of Beam Position from MI Extra-Wide Aperture BPM Milton Smith BPM
BPM
Beam Instrumentation
08 Aug 2006
2379-v1 Growth Rates of Coupled Bunch Modes due to the Fundamental RF Impedance Ioanis Kourbanis RF
04 Aug 2006
2086-v1 Note on Position Sensitivity of the Sum Signal from a Main Injector BPM Bob Webber BPM
BPM
Beam Instrumentation
01 Aug 2006
2371-v1 Note on Position Sensitivity of the Sum Signal from a Main Injector Extra-Wide Aperture BPM Bob Webber BPM
BPM
BPM
Intensity Measurements
Beam Instrumentation
01 Aug 2006
2012-v4 MI-BPM Upgrade Cable Specification Marv Olson et al. BPM
BPM
25 Jul 2006
2348-v1 Model of RF Leakage Effect on MI Beam Position Measurement Bob Webber BPM
BPM
BPM
Beam Instrumentation
14 Jul 2006
2337-v1 Electron Cloud Studies at Tevatron and Main Injector Xiaolong Zhang Beam Dynamics
Vacuum
Instabilities
Talks
SNuMi
10 Jul 2006
2331-v1 Main Injector HLRF Measurements for Proton Plan Tim G. Berenc RF
HLRF
Proton Plan
07 Jul 2006
2324-v1 Induction barrier RF and applications in the Main Injector Weiren Chou Project
Adv. Accelerator R&D
05 Jul 2006
2311-v2 Main Injector RF Power Calculations for the Proton Plan Tim G. Berenc et al. RF
HLRF
Proton Plan
30 Jun 2006
2129-v2 Raw Mode Measurements in the Upgraded MI BPM System Steve Foulkes BPM
20 Jun 2006
2292-v1 MI PBM Commissioning Checklist Robert Dysert BPM
14 Jun 2006
2263-v2 Proposal of Studying Electron Cloud and It's Mitigation for Tevatron and Main Injector Upgrades Xiaolong Zhang Beam Dynamics
Vacuum
Studies
SNuMi
13 Jun 2006
2285-v2 Rapid Transfer BPM List as of 6-9-06 (after upgrades) John Van Bogaert BPM
BPM
BPM
Run II Upgrades
Transfer Lines
Transfer Lines
Beam Transfer
09 Jun 2006
2280-v1 MI Extra Wide Aperture BPM Scaling in Difference-Over-Sum BPM System Bob Webber BPM
BPM
BPM
Beam Instrumentation
05 Jun 2006
2288-v1 MIBPM Cable Measurements Bob Webber BPM
BPM
Beam Instrumentation
05 Jun 2006
2273-v3 MI Extra Wide Aperture BPM Scaling in AM-PM BPM System Bob Webber BPM
BPM
BPM
Beam Instrumentation
26 May 2006
2278-v1 Electron Cloud Measurements in the Fermilab Main Injector Robert M Zwaska Beam Dynamics
Instabilities
25 May 2006
2276-v1 MI BPM Commissioning Phase I Robert Dysert BPM
BPM
23 May 2006
1822-v4 MI Service Building Survey (BPM electronics space) Marv Olson BPM
BPM
23 May 2006
2275-v1 Simulation of longitudinal coupled bunch instability in the Main Injector driven by parasitic high order cavity mode Vincent Wu Beam Dynamics
Studies
22 May 2006
2274-v1 Analog Signal Pre-Processing For The Fermilab Main Injector BPM Upgrade Stefano M Rapisarda et al. BPM
BPM
22 May 2006
2243-v3 MI BPM Upgrade Topics Steve Wolbers BPM
BPM
16 May 2006
2253-v5 Main Injector RF Requirements for a 1.3 Megawatt 120 GeV Proton Source Dave McGinnis HLRF
SNuMi
13 May 2006
2234-v1 Analysis of Bench Test Data for the MI BPM Pickups Robert K Kutschke BPM
09 May 2006
2252-v6 The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli BPM
BPM
08 May 2006
2250-v9 Fermilab Main Injector BPM Upgrade Steve Wolbers BPM
BPM
03 May 2006
2251-v9 Fermilab Main Injector Beam Position Monitor Upgrade (poster) Steve Wolbers BPM
BPM
02 May 2006
2226-v1 Proton Stacking in the Recycler Chandrashekhara M. Bhat Beam Dynamics
Beam Dynamics
SNuMi
17 Apr 2006
1949-v9 Main Injector Beam Position Monitor Upgrade Software Specifications for Data Acquisition Steve Foulkes et al. BPM
BPM
07 Apr 2006
2217-v3 Main Injector Beam Position Monitor Upgrade: Status and Plans Robert K Kutschke BPM
03 Apr 2006
2178-v2 First Report of the Proton Study Group Sergei Nagaitsev et al. Other
Upgrades
Operations
General
SY120
03 Apr 2006
2121-v1 SNS visit David E. Johnson Proton Driver
Transfer Lines
28 Mar 2006
2209-v1 APPLICATIONS OF BARRIER –BUCKET RF SYSTEMS AT FERMILAB Chandrashekhara M. Bhat Beam Dynamics
Beam Dynamics
Electromagnetic Calculations
15 Mar 2006
2208-v1 Bunch compression and stretching using barrier rf system Chandrashekhara M. Bhat Beam Dynamics
Beam Dynamics
Longitudinal Dynamics
15 Mar 2006
2203-v1 Update on Performance of MI BPM Upgrade Robert K Kutschke BPM
14 Mar 2006
2187-v1 Specifications for the Proton Driver Injection Absorber David E. Johnson Other
Proton Driver
07 Mar 2006
2177-v1 Summary of AntiProton Tests for MI BPM UPgrade Robert K Kutschke BPM
27 Feb 2006
2173-v2 Innovative Beam Physics for High Luminosity at Hadron Colliders Chandrashekhara M. Bhat Beam Dynamics
Beam Studies
Beam Dynamics
Longitudinal Dynamics
Accumulator
26 Feb 2006
2172-v1 Recycler and MI Momentum Aperture David E. Johnson Studies
Studies
SNuMi
24 Feb 2006
2163-v1 MI BPM TBT resolution data Peter Prieto BPM
22 Feb 2006
2158-v1 Discussion of MI BPM Data Validation Work List Robert K Kutschke BPM
21 Feb 2006
2157-v1 A Detailed Look at Closed Orbit Data for the Upgraded MI BPMs Robert K Kutschke BPM
20 Feb 2006
2153-v1 Main Injector BPM Test Stand Data Bob Webber BPM
BPM
BPM
Beam Instrumentation
18 Feb 2006
2146-v1 A More Detailed Look at Raw Mode with the Upgraded MI BPM System Robert K Kutschke BPM
10 Feb 2006
2127-v1 A First Look at Raw Mode data Robert K Kutschke BPM
01 Feb 2006
2080-v2 Comparing H and V MI BPMs Using the Upgraded System Robert K Kutschke BPM
01 Feb 2006
2125-v5 MI BPM Offset Table Log Marv Olson BPM
Beam Instrumentation
01 Feb 2006
2122-v1 MIBPM Timing Discussion Robert K Kutschke BPM
31 Jan 2006
2118-v0 Timing for the MIBPM System Robert K Kutschke BPM
27 Jan 2006
2115-v2 More Details of Injection and Extraction Flashes Steve Foulkes et al. BPM
27 Jan 2006
2101-v2 MI BPM EchoTek/GrayChip Bandwidths Bob Webber BPM
BPM
Beam Instrumentation
16 Jan 2006
2102-v1 Anti-proton Transfers with the New MI BPMs Steve Foulkes et al. BPM
12 Jan 2006
2099-v1 MI BPM Installation Requirements David P Capista BPM
11 Jan 2006
2060-v2 A Quick Look at MI BPM Flash Data Robert K Kutschke BPM
22 Dec 2005
2043-v1 Assessment of MI BPM turn-by-turn measurements Bob Webber BPM
BPM
Beam Instrumentation
07 Dec 2005
2034-v2 Recycling pbars in the Main Injector- Issues Chandrashekhara M. Bhat Beam Dynamics
01 Dec 2005
2030-v1 A Quick Look at MI BPM Data Robert K Kutschke Beam Dynamics
BPM
23 Nov 2005
841-v7 Pbar acceleration in MI using 2.5 MHz and 53 MHz rf Systems Chandrashekhara M. Bhat et al. Beam Dynamics
LLRF
HLRF
RF
Studies
HLRF
Controls
Longitudinal Dynamics
07 Nov 2005
1996-v5 MI BPM Configurations for Operational States David P Capista BPM
BPM
31 Oct 2005
2000-v1 BLM System Control Bus Testing Kelly L Knickerbocker Instrumentation
Beam Instrumentation
Beam Loss Monitors (BLM)
Beam Instrumentation
31 Oct 2005
1994-v1 BLM VME J2 Backplane Impedance Kelly L Knickerbocker Instrumentation
Beam Instrumentation
Beam Loss Monitors (BLM)
Beam Instrumentation
31 Oct 2005
1786-v7 Requirements for the Main Injector BPM upgrade David P Capista et al. BPM
24 Oct 2005
2002-v1 MIBPM Electronics review Report Vince Pavlicek et al. BPM
24 Oct 2005
1998-v1 Summary of MI BPM requirements David P Capista et al. BPM
24 Oct 2005
1985-v1 MIBPM front-end software release schedule Luciano Piccoli BPM
11 Oct 2005
1980-v1 Phase Space and Antiproton Production at Fermilab Dave McGinnis Beam Dynamics
Beam Dynamics
Beam Dynamics
Debuncher
Accumulator
04 Oct 2005
1978-v2 Memo on Preliminary Values for MI BPM Polynomial Coefficients Bob Webber BPM
BPM
BPM
Monitoring Instrumentation
Extraction from Main Injector
Beam Instrumentation
03 Oct 2005
1322-v2 Main Injector/NuMI BPM Scaling - Analysis of Main Injector HP602 and HP604 BPM Data from Traditional Main Injector and NuMI BPM Systems Bob Webber Commissioning
BPM
BPM
Monitoring Instrumentation
General
Beam Instrumentation
03 Oct 2005
1958-v2 Antiproton Beam Position Measurements with Prototype Equipment at MI-30 Charles Briegel et al. BPM
BPM
Beam Instrumentation
19 Sep 2005
1956-v1 Qualification of the Haynes 10/7 Digitizer Clock Signal Peter Prieto et al. BPM
BPM
Beam Instrumentation
12 Sep 2005
1955-v1 MIBPM Front-End Software Memory Requirements Review Luciano Piccoli BPM
BPM
09 Sep 2005
1952-v1 Time and Data Distribution Systems at the Fermilab Accelerator David G. Beechy et al. BPM
07 Sep 2005
1940-v3 Mask at MI Q301 David E. Johnson Operations
02 Sep 2005
1938-v1 Impact of beam loss in MI 30 Straight Section on ECOOL David E. Johnson Operations
23 Aug 2005
1937-v2 Main Injector BPM Review Committee Report of July 25, 2005 Alan Baumbaugh et al. BPM
BPM
22 Aug 2005
1910-v1 Main Injector Operations in the Future Ioanis Kourbanis BPM
Operations
29 Jul 2005
1908-v3 MI BPM Upgrade Review -- Overview Talk Bob Webber BPM
BPM
25 Jul 2005
1904-v5 MI BPM requirements talk David P Capista BPM
BPM
24 Jul 2005
1834-v9 BPM Buffers David P Capista et al. BPM
BPM
30 Jun 2005
1874-v1 MI States and BPMs Brian E. Chase BPM
BPM
17 Jun 2005
1865-v1 Combiner Board Slides from MI BPM 6/7/05 Meeting Bob Webber et al. BPM
09 Jun 2005
1851-v1 ISO-ADIABATIC MERGING OF PBAR STACKS IN THE FERMILAB RECYCLER Chandrashekhara M. Bhat Alignment
Beam Dynamics
Longitudinal Dynamics
31 May 2005
1850-v1 A NEW TECHNIQUE FOR MAKING BRIGHT PROTON BUNCHES USING BARRIER RF SYSTEMS Chandrashekhara M. Bhat Beam Dynamics
Longitudinal Dynamics
31 May 2005
1845-v1 Beam Sync Clocks Gregory L. Vogel BPM
BPM
25 May 2005
1810-v1 TeV BPM Timing Generator Fanout (TGF) Features Bill Haynes BPM
BPM
13 May 2005
1807-v1 MI Abort line bpm's Robert Dysert et al. BPM
04 May 2005
1806-v1 MI States and Clock Events David P Capista BPM
03 May 2005
1780-v1 Proton and PBar Beam Measurements in the Main Injector Peter Prieto et al. BPM
BPM
13 Apr 2005
1750-v1 SY120 BPM Electronics Measurements James A. Fitzgerald Extraction
BPM
SY120
23 Mar 2005
1745-v1 Numi Beamline Optics study, March 14, 2005 Ming-jen Yang Optics
Primary Proton Beam
Transfer Lines
22 Mar 2005
1744-v3 A New Scheme for Producing Bright Proton Bunches in MI for Tevatron Shots Chandrashekhara M. Bhat Beam Dynamics
Run II
18 Mar 2005
1378-v2 NUMI MI Batch by Batch Intensity Measurements Alexei Semenov Monitoring Instrumentation
Talks
Intensity Measurements
Beam Instrumentation
Instrumentation/beam Physics
18 Mar 2005
1736-v1 BLM VME J2 Backplane Crosstalk Evaluation Kelly L Knickerbocker Instrumentation
Beam Instrumentation
Beam Loss Monitors (BLM)
Beam Instrumentation
16 Mar 2005
1573-v1 Multipole fields in Booster extraction septum MP02 Ming-jen Yang Transfer Lines
Extraction Lattice
11 Feb 2005
1569-v1 Tevatron BLM VME J2 Backplane Specification Document Kelly L Knickerbocker TeV ABORT
Instrumentation
Beam Instrumentation
Beam Loss Monitors (BLM)
Beam Instrumentation
10 Feb 2005
1550-v1 MI BPM Upgrade (Talk given at CD Accelerator Activities Coord. Mtg 1/25/05) Steve Wolbers BPM
BPM
28 Jan 2005
1542-v1 Summary of Tevatron BPMs for Main Injector Michael A. Martens et al. BPM
BPM
BPM
BPM
25 Jan 2005
1382-v2 Residual Radiation Hints for Aperture and Alignment Issues in the Main Injector Bruce C. Brown ES&H
Alignment
Vacuum
18 Jan 2005
1527-v1 Description of the ACNET devices that control the Main Injector inputs to the NuMI Beam Permit System Andrew Godley Monitoring Instrumentation
Intensity Measurements
Extraction from Main Injector
Beam Instrumentation
14 Jan 2005
1524-v1 MI BPM Upgrade Steve Wolbers BPM
11 Jan 2005
1470-v1 Communicating Machine States via MDAT to the BLM Upgrade Jonathan D Lewis TeV ABORT
Beam Loss Monitors (BLM)
Beam Instrumentation
23 Nov 2004
1442-v1 Novel Beam Manipulation Techniques for Fermilab Run II and Beyond Chandrashekhara M. Bhat Beam Dynamics
Beam Dynamics
11 Nov 2004
1441-v1 The Proton Plan Bruce Baller et al. Project
Upgrades
Projects
RF
11 Nov 2004
1428-v1 Run 2 Operational Status and Plans for FY05 Dave McGinnis Operations
Operations
Operations
Operations
Operations
01 Nov 2004
1425-v3 MI SBD Specifications Chandrashekhara M. Bhat Operations
Beam Instrumentation
29 Oct 2004
1400-v1 Main Injector Bunch Shapes from WCM- pbar production Chandrashekhara M. Bhat Sampled Bunch Display (SBD)
Beam Instrumentation
Instrumentation/beam Physics
29 Oct 2004
1422-v1 Main Injector BLM electronics calibration Alberto Marchionni et al. TeV ABORT
Beam Loss Monitors (BLM)
Beam Instrumentation
25 Oct 2004
1401-v1 Schemes for Producing High Intensity Low- Longitudinal Emittance Proton Bunches for the Tevatron Collider Shots Chandrashekhara M. Bhat Beam Dynamics
MI-Dept
09 Oct 2004
1395-v4 Schemes for Producing High Intensity Low-longitudinal Emittance Proton Bunches for the Tevatron Collider Chandrashekhara M. Bhat Beam Dynamics
09 Oct 2004
1394-v1 MI8 line measurement, March 2004 Ming-jen Yang Optics
Lattice
Studies
Transfer Lines
MI-Dept
05 Oct 2004
1385-v1 Pictures of a Good and a Failed Main Injector Bellows Bruce C. Brown Vacuum
30 Sep 2004
1380-v1 Some MI proton longitudinal pulse shapes Chandrashekhara M. Bhat Sampled Bunch Display (SBD)
Beam Instrumentation
28 Sep 2004
1345-v1 Documents for New MI SBD Chandrashekhara M. Bhat et al. Sampled Bunch Display (SBD)
Beam Instrumentation
22 Sep 2004
476-v2 2.5 MHz acceleration in the Main Injector Vincent Wu Project
15 Sep 2004
1347-v1 Calibration of 2.5 MHz voltage in Main Injector Vincent Wu RF
15 Sep 2004
1344-v1 Main Injector bpm scale factors James L. Crisp BPM
Beam Instrumentation
14 Sep 2004
1338-v1 MI SBD pbar data plots Chandrashekhara M. Bhat Sampled Bunch Display (SBD)
Intensity Measurements
Beam Instrumentation
09 Sep 2004
1323-v3 MI beam orbit verifier specifications for the NuMI Beam Permit System Andrew Godley BPM
Primary Proton Beam
Controls
Monitoring Instrumentation
Extraction from Main Injector
Beam Instrumentation
07 Sep 2004
1316-v1 SY120 Mixed-mode Operation David E. Johnson Transfer Lines
Transfer Lines
SY120
24 Aug 2004
1307-v1 Study of Main Injector BLT Nicole Michelotti Beam Line Tuner (BLT)
Transfer Lines
Beam Instrumentation
17 Aug 2004
1277-v1 Booster Cogging: Synchronization with the Main Injector for NuMI & Slip-Stacking Robert M Zwaska Commissioning
Commissioning
LLRF
LLRF
29 Jul 2004
1222-v1 MI BLT Operating Modes (Struck System) Eugene Lorman et al. Beam Line Tuner (BLT)
Beam Instrumentation
25 Jun 2004
800-v2 OBSOLETE Duane C Voy BPM
BPM
Front-end Documentation
Beam Instrumentation
18 May 2004
1163-v1 Time and Data Distribution Systems at the Fermilab Accelerator David G. Beechy et al. Networks
General
Controls
07 May 2004
1157-v1 Redefining MI 8 GeV Energy, a Proposal David E. Johnson Operations
04 May 2004
1140-v1 Redefining MI 8 GeV Energy to Maximize Pbar Production David E. Johnson Operations
Operations
23 Apr 2004
1102-v2 Operational Status of Resonant Extraction David E. Johnson Extraction
01 Apr 2004
1092-v1 A1 Beamline Pics and March 23rd OTR Meeting Minutes Vic Scarpine OTR
Transfer Lines
29 Mar 2004
875-v3 Notes and associated documents from Instrumentation/beam physics meetings Jean Slaughter Sampled Bunch Display (SBD)
Instrumentation
Beam Instrumentation
09 Jan 2004
762-v8 Simulation of Main Injector 2.5 MHz Pbar Acceleration with Space Charge and Beam Loading Effects Vincent Wu Beam Dynamics
15 Dec 2003
925-v1 Notes on Transferring MI-Notes to the Beams Document Database Bruce C. Brown Other
02 Dec 2003
919-v1 Notes for Secretaries on Using the Beams Document Database Bruce C. Brown Other
20 Nov 2003
918-v1 Talks given at NBI2003 in KEK by Bob Zwaska Robert M Zwaska Commissioning
Commissioning
Primary Proton Beam
Upgrades
Dampers
Monitoring Instrumentation
Extraction from Main Injector
18 Nov 2003
890-v1 Longitudinal Emittance Measurement in MI SBD: How and why? Chandrashekhara M. Bhat Studies
Longitudinal Dynamics
30 Oct 2003
864-v3 Pbar acceleration in the MI using 2.5 MHz and 53 MHz rf Systems Chandrashekhara M. Bhat et al. LLRF
Project
Studies
HLRF
Operations
09 Oct 2003
859-v1 Booster cogging for multiple batch operation of the Main Injector William A Pellico et al. Commissioning
Primary Proton Beam
Project
Projects
Studies
LLRF
02 Oct 2003
853-v1 Status of MI Resonant Extraction David E. Johnson Extraction
30 Sep 2003
107-v1 gamma_t Jump Design Considerations for the Fermilab Main Injector Stephen D. Holmes Beam Dynamics
Design Properties
14 Aug 2003
43-v1 Comments on the Behavior of alpha_1 in Main Injector gamma_t Jump Schemes S. Alex Bogacz et al. Beam Dynamics
14 Aug 2003
33-v1 Dynamic Aperture with gamma_t Jump Rodney E. Gerig Beam Dynamics
14 Aug 2003
20-v2 A Lattice Structure for the MI with an Imaginary gamma_t Dejan Trbojevic Lattice
14 Aug 2003
13-v1 gamma_t Jump Schemes Stephen G. Peggs Beam Dynamics
Lattice
RF
14 Aug 2003
754-v1 NuMI Extraction Comparison for Two and Three Kickers David E. Johnson Extraction
Extraction from Main Injector
13 Aug 2003
755-v1 Guidelines for MI60 Extraction with Three Kickers David E. Johnson Extraction
Extraction from Main Injector
13 Aug 2003
756-v2 NuMI Extraction Geometry with Current Main Injector Orbits, Quad Offsets, and Correctors David E. Johnson Operations
Extraction from Main Injector
13 Aug 2003
775-v0 Recycler and 8 GeV Line Permanent Magnets: Reference Design and Performance Requirements George W. Foster Magnets
Transfer Lines
11 Aug 2003
768-v1 Present Uses of the Fermilab Digital Signal Receiver VXI Module Brian E. Chase LLRF
BPM
BPM
BPM
Tevatron BPM
08 Aug 2003
767-v1 LabVIEW VI Upgrades on the IPM Systems at Fermilab Thomas Spears Beam Instrumentation
Beam Instrumentation
Ion Profile Monitor
Beam Instrumentation
08 Aug 2003
753-v1 NuMI Extraction Lambertson Configuration at MI60 David E. Johnson Extraction
Extraction from Main Injector
31 Jul 2003
751-v1 Main Injector and Recycler Ring Instrumentation Upgrade Brajesh Choudhary Beam Instrumentation
Flying Wires
Beam Instrumentation
30 Jul 2003
749-v3 Installation of the New TRIG 1 and TRIG 2 Pulse Distribution System for the MI-60 Gallery Tom N Kubicki HLRF
29 Jul 2003
742-v1 Proton Deceleration from 150 GeV to 8.9 GeV in the Main Injector: Simulations and Beam Tests Chandrashekhara M. Bhat Beam Dynamics
Studies
LLRF
Beam Instrumentation
25 Jul 2003
740-v1 Instrumentation Breakout for DOE Run II Review July 2003 Keith E Gollwitzer et al. BPM
Instrumentation
Beam Instrumentation
Talks
Beam Instrumentation
Beam Instrumentation
Beam Instrumentation
ACNET
Electron Cooling
23 Jul 2003
322-v1 Recycler Lambertson Magnet Configurations Main Injector -- Recycler Transfer Lines David J. Harding Magnets
Magnets
Magnets
16 Jul 2003
725-v2 Dispersion Matching into the Tevatron David E. Johnson et al. Optics
Transfer Lines
Beam Transfer
12 Jul 2003
728-v1 MI60 Quad Offsets for NuMI David E. Johnson Primary Proton Beam
Alignment
Alignment
Installation
11 Jul 2003
148-v2 AP4 Beam Dump and Allowed Beam Intensity Limit During the Construction Phase of theMI-8 GeV Beam-line Chandrashekhara M. Bhat Beam Dynamics
ES&H
10 Jul 2003
213-v1 Main Injector and Beamline Naming Conventions David E. Johnson et al. Civil
Lattice
Controls
08 Jul 2003
199-v1 Lambertson Final Design Review Responses David E. Johnson Magnets
Design Properties
Magnets
08 Jul 2003
91-v1 Resonant Charging and Pulse Sharpening for the Proton Injection Kicker: Test Results from MKS-90 Main Ring System Chris Jensen et al. Power Supplies
Design Properties
03 Jul 2003
94-v1 Geodesy and Alignment Concepts for the Fermi Main Injector Virgil Bocean Alignment
Alignment
03 Jul 2003
151-v1 Results of Off-Center Harmonic Measurements and Analysis C. Shekhar Mishra Magnets
Studies
02 Jul 2003
142-v1 Vacuum System Design and Performance Calculations for Phase 1 of the 5 MeV Electron Cooling Test Beam Facility Gerald P. Jackson Vacuum
Vacuum
Studies
Design Properties
01 Jul 2003
45-v1 Physical Aperture and Beamline Matching Criteria for the Main Injector Stephen D. Holmes et al. Beam Dynamics
Lattice
30 Jun 2003
10-v1 Transition Crossing Time Shifts Stephen G. Peggs Beam Dynamics
26 Jun 2003
121-v1 Data Analysis & Quality Control of the Fermilab Main Injector Dipoles Using the Flatcoil Measurements C. Shekhar Mishra Magnets
Studies
25 Jun 2003
125-v1 Main Injector Dipole Magnet Acceptance Criteria C. Shekhar Mishra Magnets
25 Jun 2003
119-v1 Main Injector Vacuum System Design Analysis Dennis Stoller Vacuum
Design Properties
25 Jun 2003
105-v1 Radiation Levels in the 8 GeV Beamline Arising from the Tevatron Beam Losses Chandrashekhara M. Bhat et al. ES&H
24 Jun 2003
97-v1 Preliminary Design of the Beam Position Detectors for the Fermilab Main Injector Ed Barsotti, Jr. Design Properties
Beam Instrumentation
24 Jun 2003
93-v1 Beam Loading Effects During Multi-Batch Snap Coalescing David W. Wildman Beam Dynamics
23 Jun 2003
77-v1 Instrumentation Requirements for the Fermilab Main Injector David E. Johnson Beam Dynamics
Beam Instrumentation
23 Jun 2003
70-v1 Glow Discharge Cleaning for the Main Injector Shuxiu Zhang Vacuum
Vacuum
12 Jun 2003
73-v1 Effective Length of the Main Injector Dipole and its Effect on Main Injector Henry D. Glass et al. Magnets
12 Jun 2003
71-v1 Simulation of the Dynamical Performance of the Main Injector at 8.9 GeV Fady A. Harfoush et al. Lattice
Studies
12 Jun 2003
42-v1 Main Injector Quadrupoles: Magnetic Design Issues Jean-Francois Ostiguy Magnets
10 Jun 2003
752-v1 Proposed Main Injector Quad Offsets and Dipole Correctors Currents for the Current NuMI Extraction Geometry David E. Johnson Extraction
Extraction from Main Injector
10 Jun 2003
631-v1 Barrier RF Stacking at Fermilab Weiren Chou et al. Beam Dynamics
HLRF
RF
Longitudinal Dynamics
Adv. Accelerator R&D
LLRF
29 May 2003
633-v1 A New Antiproton Beam Transfer Scheme without Coalescing Weiren Chou et al. Beam Dynamics
Studies
Longitudinal Dynamics
Operations
LLRF
Beam Transfer
Multiparticle
28 May 2003
629-v1 2 MW Upgrade of the Fermilab Main Injector Weiren Chou Future Accelerators
Project
28 May 2003
553-v3 Notes on the Beams Document Database Bruce C. Brown Other
23 May 2003
605-v1 MI/RR Damper George W. Foster et al. Dampers
Run II
Dampers
16 May 2003
495-v2 Calibrating the Booster Ionization Profile Monitor: Preliminary Summary James F. Amundson et al. Beam Instrumentation
09 May 2003
591-v1 BEAM BASED MEASUREMENTS OF HYSTERESIS EFFECTS IN FERMILAB MAIN INJECTOR MAGNETS Bruce C. Brown et al. Magnets
Power Supplies
07 May 2003
573-v1 Beam Loading Compensation - RF Station Feedback Gain Measurement Joseph E. Dey HLRF
29 Apr 2003
564-v1 Mi and TeV FW Analysis Federico Roncarolo Flying Wires
Flying Wires
Flying Wires
25 Apr 2003
748-v1 Emittance measurement and acceleration – Revision of MI-0294 Kiyomi Seiya Beam Dynamics
Studies
LLRF
Beam Instrumentation
10 Apr 2003
544-v1 Tevatron C0 and F0 Lambertson Beam Impedance James L. Crisp et al. Magnets
Magnets
Instabilities
Magnets
04 Apr 2003
531-v1 Notes for MI/RR Group Meeting of 24 March 2003 Daniel R. Broemmelsiek et al. Dampers
MI-RR-Group
Studies
25 Mar 2003
530-v1 Longitudinal Dampers for the Main Injector George W. Foster et al. Dampers
Beam Instrumentation
25 Mar 2003
528-v1 Notes for MI/RR Group Meeting of 10 March 2003 Bruce C. Brown Extraction
Vacuum
RF
MI-RR-Group
Beam Instrumentation
24 Mar 2003
522-v1 Main Injector LeCroy Oscilloscopes James A. Fitzgerald Other
Controls
Beam Instrumentation
21 Mar 2003
521-v1 Main Injector SBD guide Willem Blokland et al. Sampled Bunch Display (SBD)
Beam Instrumentation
20 Mar 2003
518-v1 SBD algorithms Nickolai Kouropatkine Sampled Bunch Display (SBD)
Instrumentation
Beam Instrumentation
20 Mar 2003
509-v1 Main Injector BPM Review Committee Report of the meeting on March 4, 2003 Keith E Gollwitzer et al. BPM
BPM
Beam Instrumentation
18 Mar 2003
379-v2 RECYCLER BPM SYSTEM UPGRADE Ming-jen Yang BPM
13 Jan 2003
468-v4 Notes for MI/RR Group Meeting of 19 Feb 2003 Bruce C. Brown Beam Dynamics
RF
Transfer Lines
MI-RR-Group
Beam Instrumentation
Studies
10 Mar 2003
484-v1 Notes for MI/RR Group Meeting of 26 Feb 2003 Chandrashekhara M. Bhat et al. BPM
RF
MI-RR-Group
RF
Beam Instrumentation
10 Mar 2003
472-v2 REQUIREMENTS FOR THE MAIN INJECTOR & ASSOCIATED TRANSFER LINES BPMs INCLUDING THE NuMI BEAM LINE Brajesh Choudhary BPM
Beam Instrumentation
04 Mar 2003
471-v1 MAIN INJECTOR BPM SYSTEM UPGRADE + NUMI BEAMLINE BPM REQUIREMENTS Brajesh Choudhary BPM
Beam Instrumentation
03 Mar 2003
469-v3 Notes for MI/RR Group Meeting of 24 Feb 2003 Bruce C. Brown Vacuum
Transfer Lines
MI-RR-Group
Studies
25 Feb 2003
462-v1 Focusing Properties of The Booster Extraction Septa Bruce C. Brown et al. Transfer Lines
Magnets
Extraction Lattice
21 Feb 2003
433-v1 Notes for MI/RR Group Meeting of 29 Jan 2003 Bruce C. Brown BPM
Beam Line Tuner (BLT)
MI-RR-Group
Beam Instrumentation
11 Feb 2003
138-v1 Requirements for the Recycler Ring and Associated Transfer Line BPMs Brajesh Choudhary BPM
BPM
Beam Instrumentation
Beam Instrumentation
07 Feb 2003
21-v1 A Stretcher Ring in the MI Tunnel Stanley M. Pruss et al. Other
03 Feb 2003
747-v1 Slip Stacking at Low Intensity – Status of the Beam Studies Kiyomi Seiya Beam Dynamics
RF
Studies
LLRF
Beam Instrumentation
03 Feb 2003
416-v1 Notes for MI/RR Group Meeting of 22 Jan 2003 Bruce C. Brown Other
RR2003Winter
MI-RR-Group
Beam Instrumentation
Beam Instrumentation
MI2003Winter
28 Jan 2003
413-v1 Investigation of Logarithmic Amplifier Output Response Adim Yousif BPM
Beam Instrumentation
Beam Instrumentation
27 Jan 2003
412-v1 FNAL instrumentation: Lessons Learned James L. Crisp BPM
Beam Loss Monitors (BLM)
Beam Instrumentation
Data Acquisition
27 Jan 2003
409-v1 Console Library for the Beam Line Tuners Tom Meyer Beam Line Tuner (BLT)
Acnet
Beam Instrumentation
27 Jan 2003
17-v1 RF Considerations in the Main Injector Philip S. Martin RF
17 Jan 2003
383-v1 Notes for MI/RR Group Meeting of 7 Oct 2002 Bruce C. Brown BPM
Studies
Controls
MI-RR-Group
Beam Instrumentation
14 Jan 2003
384-v1 Notes for MI/RR Group Meeting of 16 Oct 2002 Bruce C. Brown et al. Magnets
Stochastic Cooling
MI-RR-Group
Magnets
Studies
14 Jan 2003
364-v1 Notes for MI/RR Group Meeting of 23 Sep 2002 Bruce C. Brown RF
Studies
Operations
MI-RR-Group
Operations
13 Jan 2003
360-v1 Notes for MI/RR Group Meeting of 16 Sep 2002 Bruce C. Brown Beam Dynamics
RF
MI-RR-Group
13 Jan 2003
299-v1 On the Tevatron Tune Tracker, Status report, December 2002 Paul Lebrun Beam Instrumentation
Tevatron Tune
09 Jan 2003
284-v4 Notes for MI/RR Group Meeting of 23 Dec 2002 Bruce C. Brown et al. Beam Dynamics
Beam Dynamics
MI-RR-Group
RF
Studies
07 Jan 2003
7-v1 Magnetic Design of the Main Injector Dipole Stan C. Snowdon Magnets
Design Properties
Magnets
31 Dec 2002
6-v1 A Magnetic Design for a Dipole with Copper on the Medial Plane Stan C. Snowdon Magnets
Magnets
31 Dec 2002
245-v1 Measurements of Coalesced Proton Bunch Lengths in the Main injector and Tevatron Ron Moore Other
General
13 Dec 2002
375-v1 Vacuum Windows in Recycler Transfer Lines Carol J. Johnstone et al. Vacuum
Transfer Lines
Transfer Lines
27 Sep 2002
744-v1 Simulation of Pbar Stacking and Un-Stacking in the Recycler Ring Chandrashekhara M. Bhat Beam Dynamics
RF
Studies
Beam Instrumentation
01 Sep 2002
698-v1 Proton longitudinal emittance vs proton intensity during MI $2B cycle Ioanis Kourbanis et al. Beam Dynamics
04 Jan 2002
352-v1 Preparing the Proton Bunches in 2.5 MHz Buckets for MI Tune-up Chandrashekhara M. Bhat Beam Dynamics
RF
Beam Instrumentation
01 Jun 2001
743-v1 Pbar Acceleration in the MI using 2.5 MHz Coalescing RF system: Tune-up Study Scheme with proton beams and Operational Implementation Chandrashekhara M. Bhat et al. LLRF
RF
LLRF
Beam Instrumentation
14 Feb 2001
362-v1 Pbar Acceleration in the Main Injector RR/AR - MI - Tevatron - Simulations and Tune up Studies Using Protons Chandrashekhara M. Bhat RF
Studies
Beam Instrumentation
20 Nov 2000
356-v1 Analysis of the Beam Loss Observed During the October 12, 2000 Main Injector Deceleration Studies Gerald P. Jackson Beam Dynamics
Studies
23 Oct 2000
351-v1 Strength Measurements of B3 (ODM) Dipoles Bruce C. Brown Magnets
Transfer Lines
Magnets
07 Sep 2000
354-v1 Pbar Acceleration in the Main Injector for Run II: ESME Simulations Chandrashekhara M. Bhat et al. RF
Studies
Beam Instrumentation
26 Jul 2000
353-v1 Slow Deceleration of Anti-Proton Beam in the MI: RF Specifications Chandrashekhara M. Bhat RF
Beam Instrumentation
12 Jun 2000
788-v1 MI8 Transfer Line Lattice Function Measurement Saeed Assadi et al. BPM
Lattice
01 May 2000
350-v2 GFSDA Tune Measurement in the Main Injector David A. Herrup Tune Measurement
Beam Instrumentation
23 Mar 2000
349-v1 Anti-Proton Beam Acceleration in the MI and RF Specifications Chandrashekhara M. Bhat RF
Beam Instrumentation
26 Jan 2000
347-v1 Single Turn Extraction Design for NuMI David E. Johnson Extraction
Civil
Design Properties
Civil Construction
Extraction from Main Injector
06 Jan 2000
346-v1 Status and Issues for Main Injector Momentum and Tune Control Bruce C. Brown Magnets
Controls
Power Supplies
02 Jun 1999
344-v1 Preliminary Measurement of Airborne Radioactvity in the MI40 Absorber Room and at MI40 Abort Lambertsons Anthony F. Leveling ES&H
Studies
07 Apr 1999
58-v1 Chromaticity Compensation - Main Injector Sextupole Strength S. Alex Bogacz et al. Magnets
Lattice
01 Apr 1999
343-v1 Microbiologically Influenced Corrosion in the Main Injector Magnet Low Conductivity Water Patrick G. Hurh Civil
Studies
Water
04 Mar 1999
341-v3 The Main Injector SBD for Studiers Willem Blokland et al. LabVIEW
Sampled Bunch Display (SBD)
Acnet
Console Applications
Beam Instrumentation
Data Acquisition
15 Feb 1999
342-v1 Radiation Dose Rate Measurement at Tevatron Wave Guide Penetrations at F0 Service Building due to 8 GeV Proton Beam Loss Anthony F. Leveling ES&H
05 Feb 1999
340-v2 SWIC and Multiwire Timing James L. Crisp et al. Transfer Lines
Controls
Beam Instrumentation
08 Dec 1998
339-v2 Stripline Detectors for Fermilab Main Injector James L. Crisp et al. Beam Dynamics
Beam Instrumentation
07 Dec 1998
332-v1 Determination of Interlock Gate Locations at E35, F47, and A25 Anthony F. Leveling ES&H
Civil
Studies
15 Sep 1998
334-v1 Some Additional Information for Dipole and Quadrupole Power Supply Control Bruce C. Brown Magnets
Controls
Power Supplies
04 Sep 1998
333-v2 Main Injector Commissioning Plan C. Shekhar Mishra Commissioning
Operations
Beam Instrumentation
22 Jul 1998
331-v2 Effect of FO Crossover Shielding Field Change Anthony F. Leveling ES&H
Civil
21 Jul 1998
335-v1 Main Injector DCCT Measurements Gregory L. Vogel Beam Instrumentation
14 Jul 1998
330-v1 Committed Effective Dose Equivalent Calculation for Personnel Exposure to Airborne Radioactivity Produced by Main Injector Beam Loss Anthony F. Leveling ES&H
Studies
07 Jul 1998
315-v1 Main Injector and Recycler Ring Shielding Assessment Chandrashekhara M. Bhat et al. ES&H
Studies
01 Jul 1998
317-v1 Addendum to MI-0226 Gregory L. Vogel BPM
RF
Beam Instrumentation
24 Jun 1998
324-v2 Specifications for the TE01 Signal Transmission of the Recycler Stochastic Cooling Systems Gerald P. Jackson Beam Dynamics
Stochastic Cooling
04 May 1998
316-v1 MI BPM RF Module Test Results Gregory L. Vogel BPM
RF
16 Jan 1998
309-v2 Ground Water, Air-Borne and Soil Activation from the Operation of the MI-40 Beam Absorber During the FMI Era Chandrashekhara M. Bhat ES&H
01 Dec 1997
305-v2 A Preliminary Analysis of Ground-Water and Surface-Water Radioactivity Around the Main Injector Extraction and Injection Regions Chandrashekhara M. Bhat et al. ES&H
Studies
01 Nov 1997
308-v1 Main Injector Intensity Limitations at Transition Chandrashekhara M. Bhat Beam Dynamics
Tevatron Group
Meetings
29 Sep 1997
307-v2 Shielding Assessment of F0 to Switchyard Beam Line Enclosure for MI 120 GeV Beam Transport Chandrashekhara M. Bhat Beam Dynamics
ES&H
Transfer Lines
16 Sep 1997
306-v1 Can Magnetic Fields Assist in Radiation Shielding for 8 GeV Proton Beams Bruce C. Brown ES&H
ES&H
Energy Deposition
15 Aug 1997
295-v1 MI Power Supply Control Issues for Magnets with Hysteresis Bruce C. Brown Magnets
Power Supplies
26 Jun 1997
226-v1 Timing Requirements for the 8 GeV Proton Injector Kicker David E. Johnson Controls
02 Jun 1997
294-v1 Magnet Orientations in Beamlines David E. Johnson Magnets
Civil
Alignment
Alignment
Transfer Lines
30 May 1997
1148-v4 FERMILAB COORDINATE SYSTEMS Babatunde Oshinowo Alignment
Alignment
Alignment
Alignment
Alignment
Alignment
Alignment
15 May 1997
292-v1 Beam Line Beam Loss Monitors Marv Olson Transfer Lines
Beam Loss Monitors (BLM)
Design Properties
Beam Instrumentation
12 Mar 1997
289-v1 Main Injector 8 GeV Beam Line Shielding Assessment Chandrashekhara M. Bhat et al. ES&H
Magnets
17 Feb 1997
287-v1 Measurements of the Longitudinal Shape and Center of the Magnetic Field of PDD Dipoles Bruce C. Brown Magnets
Magnets
Transfer Lines
17 Feb 1997
286-v1 The Effect of Quadrupole Magnetic Fields on Main Injector BPM Measurements James L. Crisp et al. BPM
BPM
Beam Instrumentation
31 Jan 1997
235-v1 Groundwater, Air-Borne and Soil Activation from the Operation of the Temporary Beam Absorber in the MI-8 GeV Beam Line Chandrashekhara M. Bhat et al. ES&H
Civil
25 Jan 1997
227-v1 Rogowski Coil Measurements of PQP003 and PQP004 Bruce C. Brown et al. Magnets
Magnets
Transfer Lines
25 Nov 1996
214-v1 MI Device and ACNET Names David E. Johnson et al. Controls
29 Oct 1996
224-v1 8 GeV Line Instrumentation: Locations and Rack Layouts Gregory L. Vogel Civil
Beam Instrumentation
29 Oct 1996
223-v1 MI Instrumentation: Layouts and Rack Layouts Gregory L. Vogel BPM
Controls
Schottky
Beam Instrumentation
21 Oct 1996
231-v1 Accelerator Physics Issues C. Shekhar Mishra Magnets
Lattice
Magnets
17 Sep 1996
212-v2 Short Summary of my Visit to Fermilab Charles Steinbach Extraction
HLRF
Project
10 Sep 1996
211-v2 Ground-water Activation from the Operation of MI40 Beam Absorber Chandrashekhara M. Bhat et al. ES&H
Design Properties
28 Aug 1996
197-v1 8 GeV Beam Absorber for Beam Line Commissioning Chandrashekhara M. Bhat et al. Commissioning
ES&H
Design Properties
31 Jul 1996
194-v1 Permanent Magnet Stability: Addendum Jean-Francois Ostiguy Magnets
Magnets
19 Jul 1996
202-v1 Main Injector Quad Length Ratios and Current vs Tune Parameters David E. Johnson Magnets
Lattice
Magnets
08 Jul 1996
171-v2 MI-10 Injection Layout David E. Johnson Civil
Transfer Lines
17 May 1996
170-v1 Closed Orbit Effects Due to Longitudinal Bend Center Displacement Bruce C. Brown Alignment
Transfer Lines
Transfer Lines
02 Apr 1996
157-v1 RF Power Limitation on Main Injector Beam Current James E. Griffin RF
Beam Instrumentation
03 Feb 1996
118-v1 Main Injector Era Backfeed Recommendations Cezary A. Jach Civil
AC Power
Power Supplies
09 Jan 1996
152-v1 Main Injector Dipole Magnets Placement in MI62 and MI10 C. Shekhar Mishra Magnets
Civil
20 Dec 1995
149-v2 Thoughts on FMI Application Programming, CHEP95 and the Main Injector C. Shekhar Mishra Other
Project
Controls
05 Oct 1995
146-v2 Radiation Level in the Intersection Region of AP2 and 8 GeV Beam-line due to Beam Loss in the AP2 Beam-line Chandrashekhara M. Bhat et al. Beam Dynamics
ES&H
23 Aug 1995
136-v2 µ-Dose Level in the Vicinity of the Intersection of the 8 GeV and the AP2-Beamlines Chandrashekhara M. Bhat Beam Dynamics
ES&H
28 Jun 1995
124-v1 Beam Heating of Vacuum Windows John A. Johnstone Vacuum
05 Jun 1995
135-v1 Influence of Process Parameters on the Magnetic Properties of LTV-Processed Steel Edward W. Collings Magnets
Magnets
03 May 1995
134-v2 List of papers submitted to the 95 PAC, Dallas, TX, May 1-5, 1995. Management of Main Injector Project Other
01 May 1995
128-v2 Electrical Modeling of Main Injector Dipole Magnets Si Fang Magnets
17 Mar 1995
123-v1 Cyclic, High-Power Tests of Main Injector Dipoles at E4-R Philip S. Martin Magnets
Studies
06 Mar 1995
129-v2 Electrical Modeling of Main Injector Quadrupole Magnets Si Fang Magnets
Design Properties
Magnets
03 Mar 1995
132-v2 High Beta Insert for MI-like Ring David E. Johnson Optics
Lattice
22 Feb 1995
113-v1 Dipole Strength Dispersion Rachid Baiod Magnets
10 Feb 1995
130-v2 Electrical Modeling of Main Injector Sextupole Magnets Si Fang Magnets
01 Feb 1995
150-v2 Data Analysis and Quality Control of the Fermilab Main Injector Dipoles Using the Flatcoil Measurements C. Shekhar Mishra Magnets
Studies
Magnets
16 Jan 1995
114-v1 Evaluation of Beam Coupling Due to the Dipole Current Loop Rachid Baiod Beam Dynamics
Magnets
28 Oct 1994
120-v1 X-Y Coupling of Betatron Motion from MI Dipole Bus Current James A. MacLachlan Beam Dynamics
Magnets
Design Properties
Beam Instrumentation
25 Oct 1994
127-v1 FE Thermal Stress Analysis of the Main Injector Dipole Coil Eric Haggard Magnets
Studies
Design Properties
Magnets
22 Sep 1994
115-v1 Eddy Currents in the Main Injector Dipole Magnet Coils Jean-Francois Ostiguy Magnets
22 Jul 1994
111-v1 Study of the Long and Short Quadrupoles Strength Match C. Shekhar Mishra Magnets
Studies
Magnets
30 Jun 1994
126-v2 Summary Report on the MIR 20.0 Ft. Dipole Magnet Performance/Thermal Test Arie Lipski Magnets
24 Jun 1994
112-v1 Measurement of Main Ring Quads for Main Injector BPM Dimensions James A. Fitzgerald Magnets
Design Properties
Beam Instrumentation
15 Jun 1994
110-v1 Study of the Alignment Tolerance and Corrector Strength in the Fermilab Main Injector Lattice C. Shekhar Mishra Lattice
Alignment
Studies
25 May 1994
108-v1 Low-Dispersion gt Jump Scheme for the Main Injector S. Alex Bogacz et al. Beam Dynamics
02 May 1994
109-v1 Study of the Main Injector Quadrupole Measurement Precision C. Shekhar Mishra Magnets
Studies
14 Apr 1994
106-v2 An Air-Cooled FMI Abort Dump? Chandrashekhara M. Bhat et al. Design Properties
Water
04 Apr 1994
104-v1 Impedance and Instability Threshold Estimates in the Main Injector I Michael A. Martens et al. Beam Dynamics
Instabilities
01 Mar 1994
102-v1 MIDB Users and Uses Rachid Baiod et al. Magnets
Project
24 Jan 1994
103-v1 BPM Alignment Tolerance Considerations Philip S. Martin Alignment
Beam Instrumentation
07 Jan 1994
101-v1 Main Injector Sextupole Strength - Reassessment S. Alex Bogacz Magnets
01 Dec 1993
100-v1 Radiation Levels in the MI-60 Enclosure from Tevatron Beam Losses Chandrashekhara M. Bhat Beam Dynamics
ES&H
Civil
08 Nov 1993
99-v1 Beam Loading Effects for a Partially Filled MI Ring S. Alex Bogacz Beam Dynamics
05 Nov 1993
98-v1 FMI PCS Self Assessment Report Management of Main Injector Project Project
29 Oct 1993
96-v1 A Numerical Simulation of Resonant Extraction John A. Johnstone Lattice
Studies
08 Oct 1993
92-v2 A Simplified Analysis of Resonant Extraction at the Main Injector John A. Johnstone Extraction
Beam Dynamics
03 Sep 1993
131-v1 Specifications for the Main Injector Horizontal Correction Elements David E. Johnson Magnets
Design Properties
Magnets
03 Sep 1993
95-v1 Radioactivity of the Closed Loop Cooling Water of the Main Injector Beam Abort Dump Chandrashekhara M. Bhat ES&H
Design Properties
01 Sep 1993
90-v1 How the Tevatron was Aligned (1980-83) C. Thornton Murphy Alignment
Alignment
Alignment
27 Aug 1993
89-v1 Study of the Fermilab Main Injector Lattice Fady A. Harfoush et al. Lattice
Studies
25 Aug 1993
88-v3 Radiation Shieldings for MI Culverts Chandrashekhara M. Bhat ES&H
Civil
Design Properties
01 Aug 1993
87-v2 A Design Study of the MI40 Beam-Abort Dump Chandrashekhara M. Bhat ES&H
Design Properties
29 Jul 1993
86-v1 New Configuration of the MI Skew Quads - Local and Global Decoupling Efficacies S. Alex Bogacz Magnets
23 Jul 1993
85-v1 Transparencies from 150 GeV Line Status Review Management of Main Injector Project Beam Dynamics
Transfer Lines
Beam Instrumentation
21 Jul 1993
83-v1 Location of Tevatron RF in the Main Injector Era and Clarification of the Tevatron F0 Geometry David E. Johnson HLRF
RF
14 May 1993
81-v1 Response to Recommendation from September 1992 DOE Review, Main Injector Ring Vacuum - WBS 1.1.2.1 James A. MacLachlan Beam Dynamics
Vacuum
Vacuum
10 Mar 1993
80-v1 Kicker Operating Margins David E. Johnson Magnets
Magnets
03 Mar 1993
79-v1 Beamline Power Supply Ripple and Regulation Specifications David E. Johnson Transfer Lines
Power Supplies
02 Mar 1993
82-v1 Summary of the Existing MR Beam Diagnostics for Use in Main Injector Chandrashekhara M. Bhat et al. Beam Dynamics
Beam Instrumentation
01 Mar 1993
76-v1 Calculating Orbit Errors in Main Injector Using Two or One BPM/Cell Correction Scheme Fady A. Harfoush Beam Dynamics
Lattice
03 Dec 1992
78-v1 On the Calculation of Sextupole Correctors Strength in Main Injector Using TPOT Fady A. Harfoush Magnets
Lattice
02 Dec 1992
75-v1 Beamline Errors and Corrector Strengths David E. Johnson Beam Dynamics
Magnets
14 Aug 1992
74-v1 How Long is a 'Foot'? Allison D. Russell Civil
Alignment
30 Jun 1992
72-v1 Main Injector Correctors Workshop, Friday, May 8, 1992, Fermilab Management of Main Injector Project Magnets
MI-Dept
08 May 1992
68-v1 Conceptual Design Report of Vacuum Pumping System for Main Injector Shuxiu Zhang Vacuum
Vacuum
30 Dec 1991
67-v1 Systematic and Random Errors for Main Injector Tracking Fady A. Harfoush et al. Magnets
31 Oct 1991
69-v1 Estimation of the Effective Pumping Speed for Two Installation Geometries Shuxiu Zhang Vacuum
Civil
Vacuum
27 Sep 1991
117-v1 Initial Determination of Main Injector Quadrupole Steel Lengths David J. Harding Magnets
Design Properties
Magnets
09 Sep 1991
66-v1 Siberian Snakes in the Main Injector Uli Wienands Lattice
01 Sep 1991
704-v1 Proton Single Coalesced-Bunch Intensities in the Main Injector Gerry Dugan Beam Dynamics
RF
06 Aug 1991
65-v1 Main Injector Sextupole Strength - Supplement S. Alex Bogacz Magnets
01 Aug 1991
64-v1 Proposal for Experimental Test of RF Harmonic Transition Crossing in the Main Ring Chandrashekhara M. Bhat et al. Lattice
28 Jun 1991
62-v1 Minutes from the First Main Injector 'Review' Meeting May 29, 1991 Philip S. Martin Extraction
Lattice
Transfer Lines
29 May 1991
59-v1 A Transitionless Lattice for the Fermilab Main Injector S. Y. Lee et al. Design Properties
06 May 1991
60-v1 Design and Multiparticle Simulation of the Half Integer Slow Extraction System for the Main Injector Michael Harrison et al. Extraction
06 May 1991
61-v1 Examination of the Stability of the Advanced Imaginary gamma_t Lattice S. Y. Lee et al. Beam Dynamics
Lattice
Studies
06 May 1991
56-v1 Change in Nomenclature for the Main Injector Philip S. Martin Civil
Lattice
12 Apr 1991
55-v1 Desirable Tevatron F0 Straight Optics for 150 GeV Injection David E. Johnson et al. Transfer Lines
03 Apr 1991
57-v1 Synchrotron Phase Transition Crossing Using an RF Harmonic James E. Griffin Beam Dynamics
RF
01 Mar 1991
53-v1 2D Magnetostatic Field Representations on a Rectangular Region Jean-Francois Ostiguy Magnets
Magnets
22 Feb 1991
52-v1 Chromaticity Compensation Sextupole Strengths S. Alex Bogacz Beam Dynamics
Magnets
Lattice
20 Feb 1991
50-v2 Estimates of Skew Quad Strengths and Locations for the Main Injector Peter Bagley et al. Beam Dynamics
Magnets
Lattice
Transverse Dynamics
Alignment
15 Feb 1991
49-v2 alpha_1 Dismay James A. MacLachlan Beam Dynamics
12 Feb 1991
48-v1 Location of Main Injector Relative to Tevatron Stephen G. Peggs Civil
Beam Transfer
05 Feb 1991
47-v1 B-H Curves For/From Armco Steel Bruce C. Brown Magnets
Magnets
31 Jan 1991
41-v1 Main Ring Remnant Configuration Steven L. Hays et al. Magnets
Transfer Lines
06 Dec 1990
29-v1 150 GeV and Revised 120 GeV Ramps Philip S. Martin Power Supplies
06 Dec 1990
46-v1 Microwave Instability at Transition - Stability Diagram Approach S. Alex Bogacz Beam Dynamics
01 Dec 1990
37-v2 Main Injector Dipole Magnet: 2d Field Computations Jean-Francois Ostiguy Magnets
Magnets
24 Oct 1990
40-v1 Main Injector Dipole Magnet: Lorentz Forces Jean-Francois Ostiguy Magnets
09 Oct 1990
38-v1 Eddy Current Induced Multipoles in the Main Injector Jean-Francois Ostiguy Magnets
04 Oct 1990
39-v2 The Definition of alpha_1: Circumference, Johnsen, or ESME? James A. MacLachlan et al. Lattice
Longitudinal Dynamics
01 Oct 1990
44-v1 MI Beam Tube Analysis James Kerby Magnets
Vacuum
Design Properties
11 Sep 1990
30-v1 Main Injector Corrector Strength Analysis Rodney E. Gerig Magnets
Power Supplies
14 Aug 1990
34-v1 Transition Crossing in the Main Injector-ESME Simulation S. Alex Bogacz Beam Dynamics
01 Aug 1990
27-v2 Main Injector Sextupole Requirements Rodney E. Gerig Magnets
Lattice
Magnets
25 Jul 1990
700-v1 Sloping the Main Injector Philip S. Martin Civil
Design Properties
22 Jun 1990
28-v1 Standard Ramps Philip S. Martin RF
Power Supplies
14 Jun 1990
36-v1 Burning up the Beampipe John A. Johnstone Magnets
Design Properties
10 Jun 1990
35-v1 Proposal for MI Injection and Extraction Kickers John A. Dinkel Magnets
10 Jun 1990
31-v1 Main Injector RF Cycle and Z/N Limit Kingyuen B. Ng Beam Dynamics
RF
10 Jun 1990
32-v1 Some Estimation Concerning Crossing Transition of the Main Injector Kingyuen B. Ng Beam Dynamics
01 Jun 1990
26-v2 MI_15 Kicker Specifications David E. Johnson Extraction
Magnets
Transfer Lines
17 Apr 1990
14-v2 Eddy Current Effects in the Main Injector Beam Tube Stephen D. Holmes Beam Dynamics
Magnets
10 Apr 1990
16-v1 The Effect of Various Steels on B0/D0 Dipoles Stanley M. Pruss Magnets
Magnets
04 Apr 1990
12-v1 MI-Transition Crossing ESME Simulation S. Alex Bogacz Beam Dynamics
RF
22 Mar 1990
11-v1 MI-14 Beamlines Solutions for TeV Injection, Slow Extraction, Pbar Production, and Pbar Injection David E. Johnson Extraction
Transfer Lines
Beam Transfer
21 Mar 1990
9-v1 Main Injector Transition Jump Stephen D. Holmes Lattice
01 Jan 1990
8-v1 A 150 GeV MI_11 to Tevatron Beamline Solution David E. Johnson Transfer Lines
16 Nov 1989
4-v1 A New Lattice for the Main Injector Rodney E. Gerig Lattice
Design Properties
31 Oct 1989
3-v1 A Dynamic Lattice Insertion for Main Injector Extraction Rodney E. Gerig Extraction
Beam Dynamics
Lattice
31 Oct 1989
1-v2 A Dispersion Mismatch Criterion for the Main Injector to Tevatron Transfer Line Rodney E. Gerig Transfer Lines
24 Oct 1989
5-v1 Main Injector Dipole: Conductor Optimization Stephen D. Holmes Magnets
Design Properties
11 Oct 1989
18-v2 Magnets Thomas L. Collins Magnets
Design Properties
Magnets
10 Oct 1989
24-v1 Extraction Losses from the Main Injector Samuel R. Childress et al. Extraction
27 Sep 1989
15-v2 Longitudinal Emittance Growth at Transition in the Main Injector Stanley M. Pruss et al. Beam Dynamics
11 Sep 1989
19-v2 RF Intensity Limitations in the Main Injector James E. Griffin RF
HLRF
18 Aug 1989
25-v1 Fermilab Fixed Target Beams from the Main Injector Samuel R. Childress Extraction
Transfer Lines
01 May 1989

Number of documents found: 556

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 6 wallclock secs ( 1.20 usr + 0.35 sys = 1.55 CPU)