Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Fermilab Linac and sub-topics are available:
(List events on Fermilab Linac)

Beams-doc-# Title Author(s) Topic(s) Last Updated
5364-v2 Prospects for a Muon Spin Resonance Facility in the MuCool Test Area John A. Johnstone External Beams
Muon
Linac
17 Apr 2017
5322-v6 Sequenced Chassis Control Card, Linac Marx Modulator System Craig C Drennan et al. Upgrades
01 Mar 2017
5254-v1 Laser Nothcher Status 10-19-2016 David E. Johnson et al. Projects
PIP
19 Oct 2016
5184-v8 Design Notes Of The Regulated Current Arc Modulator For The FNAL H- Source Dan Bollinger et al. Pre-Accelerator
03 Oct 2016
5206-v1 PIP Status Report Meeting David E. Johnson et al. PIP
Linac
11 Aug 2016
5097-v2 Laser Notcher Status David E. Johnson Projects
Projects
PIP
02 Mar 2016
5042-v1 Tipping Analysis for 3 Point Stands Kris A Anderson Magnets
Design Properties
Other
Other
Civil
Other
Magnets
11 Jan 2016
4941-v1 RFQ magnet study James T. Volk Pre-Accelerator
03 Sep 2015
4920-v1 PIP Status Report Meeting Ryan Crawford et al. Booster
PIP
Linac
12 Aug 2015
4893-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
Upgrades
22 Jul 2015
929-v3 ACL An Introduction Brian S. Hendricks General
Controls
Controls
Controls Working Group
Controls
Console Applications
ACNET
Controls
06 May 2015
4775-v1 Performing Vacuum Calculations Using ANSYS Kris A Anderson Vacuum
Vacuum
Vacuum
Vacuum
Vacuum
Vacuum/Water/Utilities
Vacuum
27 Feb 2015
4774-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
Linac
Upgrades
25 Feb 2015
4733-v1 Impact of Laser Notcher on Radiation in MEBT David E. Johnson Projects
ES&H
22 Dec 2014
4724-v1 PIP Status Report Meeting David E. Johnson PIP
Linac
10 Dec 2014
4719-v1 Enhancements of the Fermilab Booster to Reduce Losses and Extend Lifetime: The Proton Improvement Plan Robert M Zwaska Booster
PIP
Linac
30 Nov 2014
4712-v1 PIP Status Report Meeting Ryan Crawford et al. Booster
PIP
Linac
19 Nov 2014
4711-v1 Laser Notcher Pulse Energy Requirements & Demonstration Experiment David E. Johnson et al. PIP
Upgrades
19 Nov 2014
4693-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
Linac
Upgrades
29 Oct 2014
4684-v1 PIP General Meeting Status Update Keith E Gollwitzer Booster
PIP
Linac
Regular Meetings
16 Oct 2014
4021-v2 PIP – Linac Modulator Specification Data Trevor A Butler et al. PIP
Linac
22 Sep 2014
4667-v1 FNAL H- ion source and LEBT Dan Bollinger et al. Pre-Accelerator
10 Sep 2014
4662-v1 Superconducting Linac in Fermilab Paul Derwent et al. Accelerator Seminar
Linac
Upgrades
26 Aug 2014
4661-v2 PIP Shutdown Meeting - Laser Notcher Status David E. Johnson Booster
Upgrades
20 Aug 2014
4649-v5 PIP Linac Notcher - September Readiness Review Jean-Paul Carneiro et al. PIP
Upgrades
13 Aug 2014
4646-v1 PIP Status Report Meeting Ken Domann et al. Beam Dynamics
PIP
Linac
02 Aug 2014
4632-v2 Recommissioning Linac Bunche Length Detector BLD-03 Elliott S McCrory et al. Beam Instrumentation
Instrumentation
11 Jul 2014
4537-v2 Linac Laser Notcher Project in the Proton Improvement Plan Kevin Duel et al. Pre-Accelerator
Accelerator Seminar
Booster
Linac
01 Apr 2014
4534-v1 35 Years of H- Ions at Fermilab Dan Bollinger Pre-Accelerator
Accelerator Seminar
PIP
06 Feb 2014
3781-v2 Proton Source Improvement Plan 2011 Valeri A Lebedev et al. Booster
Linac
03 Feb 2014
4499-v1 3-CELL TEST RESULTS & 9-CELL PLAN Howard Pfeffer HLRF
PIP
18 Dec 2013
3646-v16 A 750keV LINAC INJECTOR UPGRADE PLAN William A Pellico et al. Upgrades
11 Dec 2013
4340-v2 Accuracy and Performance Upgrade of PIC and Hybrid Space-Charge Solvers Leonid Vorobiev Beam Dynamics
Beam Dynamics
Beam Dynamics
Multiparticle
12 Nov 2013
4454-v1 Source Development Dan Bollinger Pre-Accelerator
PIP
24 Sep 2013
4441-v1 Laser Notcher Status 9_11_2013 David E. Johnson et al. Upgrades
11 Sep 2013
4420-v1 Linac Bunch Length Detector Pictures Elliott S McCrory Beam Instrumentation
01 Aug 2013
4306-v1 Linac Laser Notcher Status David E. Johnson Projects
PIP
28 Jun 2013
4380-v2 The FNAL 400 MeV Linac in TRACEWIN Jean-Paul Carneiro PIP
Linac
11 Jun 2013
4363-v2 Plans for Booster & Linac Transformer Installation Ryan Crawford Booster
Upgrades
PIP
Linac
Upgrades
08 May 2013
4334-v1 Linac Modulator Upgrade Trevor A Butler PIP
Linac
Upgrades
03 Apr 2013
4324-v1 A High-Power Magnetron Transmitter for Superconducting Intensity Frontier Linacs Grigory Kazakevich Future Accelerators
Adv. Accelerator R&D
Linac
26 Mar 2013
4126-v2 A 1-GeV Accumulator Ring in the Booster Tunnel Chuck Ankenbrandt et al. Booster
Project X
Linac
13 Mar 2013
4308-v1 Linac BPM Status Update Elliott S McCrory BPM
Beam Instrumentation
Console Applications
PIP
Beam Instrumentation
06 Mar 2013
4293-v1 Status of Low-Energy Linac Lattice Update Valery Kapin Beam Dynamics
PIP
13 Feb 2013
4283-v1 Linac BPM Commissioning Notes Elliott S McCrory BPM
Beam Instrumentation
Front-end Systems
Beam Instrumentation
31 Jan 2013
4276-v1 Applications for Linac BPMs Elliott S McCrory BPM
Beam Instrumentation
Java Appl Framework
Beam Instrumentation
29 Jan 2013
4264-v3 Scaling factors for the Linac BPMs Matthew H Gardner et al. Data Loggers
BPM
Beam Instrumentation
Upgrades
23 Jan 2013
4262-v1 Linac Low Energy Modulators Status Update Howard Pfeffer HLRF
PIP
19 Dec 2012
4232-v2 Linac BPM upgrade 805MHz phase signal system Elliott S McCrory BPM
Beam Instrumentation
PIP
06 Dec 2012
4256-v3 PIP - Linac Startup Plan Fernanda G Garcia Operations
PIP
Linac
05 Dec 2012
4251-v2 RFQ Linac Matching. Numerical optimization. Leonid Vorobiev Beam Dynamics
Transverse Dynamics
PIP
27 Nov 2012
4246-v1 Project Status Update Ken Domann et al. Projects
Projects
PIP
09 Nov 2012
4240-v1 PIP - General Info William A Pellico et al. Booster
PIP
Linac
24 Oct 2012
4236-v1 Proton Improvement Plan - S&T Review William A Pellico Booster
PIP
Linac
04 Oct 2012
4228-v1 Linac MCC/Transformer, Hatch, Booster Transformers, Anode Supply Ryan Crawford Booster
Upgrades
PIP
Linac
Upgrades
25 Sep 2012
4220-v1 9/19/2012 PIP meeting Source talk Dan Bollinger Pre-Accelerator
PIP
19 Sep 2012
4213-v1 RFQ Injector Installation Updates: Point of no return!!!!! (05 Sep – 12 Sep 2012) Cheng-Yang Tan Pre-Accelerator
12 Sep 2012
4211-v2 RFQ Injector Installation Updates (29 Aug – 05 Sep 2012) Cheng-Yang Tan Pre-Accelerator
05 Sep 2012
4210-v1 RFQ PA Systems Brian Schupbach Pre-Accelerator
PIP
Upgrades
30 Aug 2012
4206-v2 RFQ Injector Installation Updates (22 Aug – 29 Aug 2012) Cheng-Yang Tan Pre-Accelerator
29 Aug 2012
4196-v2 RFQ Injector fixes and Performance/Reliability testing Cheng-Yang Tan Pre-Accelerator
15 Aug 2012
4195-v1 Linac Substation L1 & Booster Substation Y-BE2 --- Update #3 Ryan Crawford Booster
Upgrades
PIP
Linac
Upgrades
15 Aug 2012
4194-v2 The RFQ Injector Upgrade Cheng-Yang Tan Pre-Accelerator
10 Aug 2012
4192-v1 Linac 400 MeV BPM Status Nathan Eddy Beam Instrumentation
PIP
08 Aug 2012
4191-v4 RF Measurement results of buncher cavity for linac pre-injector upgrade Ding Sun et al. Pre-Accelerator
02 Aug 2012
4186-v1 RFQ tests of new rods Cheng-Yang Tan Pre-Accelerator
27 Jul 2012
3889-v3 Linac Beam Velocity Measurement Craig C Drennan Operations
Controls
Beam Instrumentation
Front-end Systems
Operations
Beam Instrumentation
24 Jul 2012
3940-v1 Linac Toroid Upgrade Meeting Summaries -- Sept, 2, 2011 -- Oct. 27, 2011 Craig C Drennan Beam Instrumentation
Front-end Systems
Intensity Measurements
16 Jul 2012
4174-v1 Pre-injector Upgrade Update (09 May 2012 – 05 Jul 2012) Cheng-Yang Tan Pre-Accelerator
05 Jul 2012
4168-v1 PIP - General Info Robert M Zwaska Booster
PIP
Linac
27 Jun 2012
4167-v2 PIP - Linac: Substation L1 & MCC Upgrade Ryan Crawford PIP
Linac
27 Jun 2012
4165-v1 If You Build It, They Will Come , 8GeV CW Linac: A Staged Approach Milorad B. Popovic Accelerator Seminar
Booster
Project X
Linac
27 Jun 2012
4155-v1 PIP - Linac: BPM Readout Upgrade - Status Report Nathan Eddy Beam Instrumentation
Linac
Upgrades
12 Jun 2012
4130-v3 Results of RFQ "fixes" Cheng-Yang Tan Pre-Accelerator
17 May 2012
4120-v2 Pre-injector Upgrade Update (11 Apr 2012 – 25 Apr 2012) Cheng-Yang Tan Pre-Accelerator
26 Apr 2012
4114-v1 Proton source shutdown schedule Mary Convery Booster
Linac
18 Apr 2012
4110-v1 Pre-injector Upgrade Updates (28 Mar 2012 – 11 Apr 2012) Cheng-Yang Tan Pre-Accelerator
11 Apr 2012
4108-v1 A Concept: 8 GeV CW Linac, Staged Approach Milorad B. Popovic Booster
Project X
Linac
10 Apr 2012
4102-v2 Pre-injector Upgrade Updates (14 Mar 2012 – 28 Mar 2012) Cheng-Yang Tan Pre-Accelerator
28 Mar 2012
4101-v1 Linac 400MeV Steer program Kyle J Hazelwood Beam Instrumentation
Controls
Operations
Console Applications
Operations
27 Mar 2012
4098-v1 Synoptic Overview Alex Waller Controls
Controls
21 Mar 2012
4097-v1 PIP - Linac: 200MHz Modulator Upgrade - Status Report Trevor A Butler PIP
Linac
Upgrades
21 Mar 2012
4096-v1 PIP - Linac: Substation L1 & MCC Upgrade Ryan Crawford PIP
Linac
Upgrades
20 Mar 2012
4087-v3 Pre-injector Upgrade Updates (29 Feb 2012 – 14 Mar 2012) Cheng-Yang Tan Pre-Accelerator
14 Mar 2012
4083-v1 PIP - General Info William A Pellico et al. Booster
PIP
Linac
07 Mar 2012
4077-v1 Pre-injector Upgrade Updates (15 Feb 2012 – 29 Feb 2012) Cheng-Yang Tan Pre-Accelerator
29 Feb 2012
4071-v2 Pre-injector Upgrade Updates (01 Feb 2012 – 15 Feb 2012) Cheng-Yang Tan Pre-Accelerator
15 Feb 2012
4062-v1 Beam to Muon g-2 and Mu2e Experiments from Recycler Milorad B. Popovic Booster
PIP
Recycler
Linac
03 Feb 2012
4059-v2 Pre-injector Upgrade Updates (18 Jan 2012 – 01 Feb 2012) Cheng-Yang Tan Pre-Accelerator
01 Feb 2012
4045-v3 Pre-injector Upgrade Updates (04 Jan 2012 – 18 Jan 2012) Cheng-Yang Tan Pre-Accelerator
18 Jan 2012
4042-v3 Status of Linac Lattice Study H.J Kim Beam Physics
PIP
Linac
11 Jan 2012
4033-v2 Pre-injector Upgrade Updates (21 Dec 2011 – 04 Jan 2012) Cheng-Yang Tan Pre-Accelerator
04 Jan 2012
4027-v2 Pre-injector Upgrade Updates (07 Dec 2011 – 21 Dec 2011) Cheng-Yang Tan Pre-Accelerator
21 Dec 2011
4022-v1 Proton source 2012 shutdown schedule Mary Convery Booster
Linac
14 Dec 2011
4014-v1 Pre-injector Upgrade Updates (23 Nov 2011 – 07 Dec 2011) Cheng-Yang Tan Pre-Accelerator
07 Dec 2011
4005-v2 Pre-injector Upgrade Updates (09 Nov 2011 – 26 Nov 2011) Cheng-Yang Tan Pre-Accelerator
23 Nov 2011
4007-v3 Linac L1 Substation Upgrade Steven L. Hays PIP
Upgrades
23 Nov 2011
3770-v2 Meeting Minutes: Linac and 400 MeV Beam Position Monitor Upgrade Craig C Drennan et al. Beam Instrumentation
23 Nov 2011
3990-v2 Pre-injector Upgrade Updates (26 Oct 2011 – 09 Nov 2011) Cheng-Yang Tan Pre-Accelerator
09 Nov 2011
3985-v1 PIP - Linac:7835 Procurement Strategy Fernanda G Garcia Operations
Projects
PIP
Linac
Upgrades
02 Nov 2011
3979-v1 Linac RF Modulators New Specifications Trevor A Butler PIP
Linac
01 Nov 2011
3978-v1 Pre-injector Upgrade Updates (12 Oct 2011 – 26 Oct 2011) Cheng-Yang Tan Pre-Accelerator
26 Oct 2011
3966-v1 Pre-injector Upgrade Updates (28 Sep 2011 – 12 Oct 2011) Cheng-Yang Tan Pre-Accelerator
12 Oct 2011
3789-v2 NTF BPM: Note on the New BPM Installation In the NTF Beam Line Craig C Drennan NTF
06 Oct 2011
3953-v1 Pre-injector Upgrade Updates (14 Sep 2011 – 28 Sep 2011) Cheng-Yang Tan Pre-Accelerator
28 Sep 2011
3948-v2 Toroid Requirements in the Linac Craig C Drennan et al. Beam Instrumentation
20 Sep 2011
3943-v3 Pre-injector Upgrade Updates (17 Aug 2011 – 14 Sep 2011) Cheng-Yang Tan Pre-Accelerator
14 Sep 2011
3941-v1 A Review of the RFQ Based Pre-injector for the Fermilab Linac George E. Krafczyk et al. Linac
13 Sep 2011
3801-v4 Beam Position Monitor Requirements in the Linac and 400 MeV Line Craig C Drennan Beam Instrumentation
Upgrades
12 Sep 2011
3936-v1 Linac/400 MeV BPM System Plans and Status Nathan Eddy BPM
BPM
PIP
Upgrades
07 Sep 2011
3935-v2 Proton Source Vacuum Plan David Augustine Booster
PIP
Vacuum
Linac
Vacuum
02 Sep 2011
3932-v1 Linac Momentum Dump Vacuum Repair - Final Design 2011 Robert E Reilly PIP
Other
Vacuum
Linac
31 Aug 2011
3926-v1 Proton Improvement Plan -- Preliminary Overview of FY12 Bob Webber Booster
PIP
Linac
24 Aug 2011
3923-v2 Pre-injector Upgrade Updates (03 Aug 2011 – 17 Aug 2011) Cheng-Yang Tan Pre-Accelerator
17 Aug 2011
3914-v2 Pre-injector Upgrade Updates (20 Jul 2011 – 03 Aug 2011) Cheng-Yang Tan Pre-Accelerator
03 Aug 2011
3907-v2 Pre-injector Upgrade Updates (06 Jul 2011 – 20 Jul 2011) Cheng-Yang Tan Pre-Accelerator
20 Jul 2011
3904-v2 Linac 200 MHz Power Systems Meeting Minutes Bob Webber HLRF
Linac
15 Jul 2011
3903-v1 Proton Source Improvement Plan Overview Bob Webber Booster
Linac
13 Jul 2011
3897-v2 Pre-injector Upgrade Updates (22 Jun 2011 – 06 Jul 2011) Cheng-Yang Tan Pre-Accelerator
06 Jul 2011
3886-v1 Linac Lattice Studies Dave McGinnis Linac
23 Jun 2011
3885-v2 Pre-injector Upgrade Updates (01 Jun 2011 – 22 Jun 2011) Cheng-Yang Tan Pre-Accelerator
22 Jun 2011
3878-v1 Proton Source Improvement Plan to DOE in March 2011 Stuart Henderson Booster
Linac
03 Jun 2011
3877-v5 Pre-injector Upgrade Updates (11 May 2011 – 01 Jun 2011) Cheng-Yang Tan Pre-Accelerator
01 Jun 2011
3868-v1 Back of the Envelope Calculation of the RF coupling beta for the FNAL H- Injector RFQ Cheng-Yang Tan Pre-Accelerator
13 May 2011
3865-v3 Pre-injector Upgrade Updates (27 Apr 2011 – 11 May 2011) Cheng-Yang Tan Pre-Accelerator
11 May 2011
3858-v3 Pre-injector Upgrade Updates (13 Apr 2011 – 27 Apr 2011) Cheng-Yang Tan Pre-Accelerator
27 Apr 2011
3810-v1 RFQ Testing Timeline Cheng-Yang Tan Pre-Accelerator
13 Apr 2011
3809-v1 Pre-injector Upgrade Updates (30 Mar 2011 – 13 Apr 2011) Cheng-Yang Tan Pre-Accelerator
13 Apr 2011
3804-v1 Pre-injector Upgrade Updates (16 Mar 2011 – 30 Mar 2011) Cheng-Yang Tan Pre-Accelerator
30 Mar 2011
3796-v1 Note on solving QL for flat gradients at FLASH ACC6 and ACC7 Julien Branlard LLRF
ILCTA
17 Mar 2011
3793-v1 Pre-injector Upgrade Updates (02 Mar 2011 – 16 Mar 2011) Cheng-Yang Tan Pre-Accelerator
16 Mar 2011
3792-v1 Einzel Lens Chopper – Transmission Line Mismatches Cheng-Yang Tan Pre-Accelerator
15 Mar 2011
3787-v2 Pre-injector Upgrade Updates (09 Feb 2011 – 02 Mar 2011) Cheng-Yang Tan Pre-Accelerator
02 Mar 2011
3777-v1 Pre-injector Upgrade Updates (19 Jan 2011 – 09 Feb 2011) Cheng-Yang Tan Pre-Accelerator
09 Feb 2011
3769-v1 Pre-injector Upgrade Updates (22 Dec 2010 – 19 Jan 2011) Cheng-Yang Tan Pre-Accelerator
19 Jan 2011
3767-v1 Meeting Minutes: Linac Multi-Wires in the Momentum Dump Line Craig C Drennan Beam Instrumentation
Operations
Studies
Linac
Upgrades
05 Jan 2011
3766-v1 A Statistical Study of Proton Source Down Time Dave McGinnis Booster
Spares and Maintenance
Operations
Spares and Maintenance
Operations
Projects
Projects
Linac
29 Dec 2010
3762-v2 Proton Source Workshop Wednesday 12/8/2010 Afternoon Session Robert M Zwaska Booster
Linac
28 Dec 2010
3720-v1 Proton Source December 2010 Workshop Opening Bob Webber Booster
Linac
22 Dec 2010
3764-v1 Pre-injector Upgrade Updates (01 Dec 2010 – 22 Dec 2010) Cheng-Yang Tan Pre-Accelerator
22 Dec 2010
3761-v1 Wednesday Morning Session Summary Ron Moore Booster
Linac
20 Dec 2010
3760-v1 Proton Source Workshop Tuesday 12/7/2010 Morning Session Summary Elmie Peoples Booster
Linac
20 Dec 2010
3745-v1 Linac RF Modulators and Related RF Power Systems Trevor A Butler HLRF
Linac
08 Dec 2010
3724-v1 Linac Momentum Dump Robert E Reilly Other
08 Dec 2010
3747-v1 PreAcc/Linac Downtime Statistics Fernanda G Garcia Pre-Accelerator
Operations
Linac
08 Dec 2010
3732-v1 Linac and Booster Radiation Shielding Status, Plans and Constraints John E Anderson Booster
ES&H
ES&H
Linac
08 Dec 2010
3729-v2 Machine Operating Description - Linac Fernanda G Garcia Operations
08 Dec 2010
3738-v1 Machine Operating Description - PreAcc Dan Bollinger Pre-Accelerator
Operations
08 Dec 2010
3726-v2 Linac Frontend Upgrade Report Cheng-Yang Tan Pre-Accelerator
07 Dec 2010
3744-v1 Proton Source December 2010 Workshop Registrants Bob Webber Booster
Linac
07 Dec 2010
3730-v3 Linac and Booster Beam Diagnostics Craig C Drennan Beam Instrumentation
Beam Instrumentation
07 Dec 2010
3739-v1 Objectives of the Proton Improvement Plan Stuart Henderson Booster
Linac
07 Dec 2010
3719-v6 Proton Source December 2010 Workshop Agenda Bob Webber Booster
Linac
06 Dec 2010
3735-v1 Opening of 2010 Proton Source Workshop Bob Webber Booster
Linac
06 Dec 2010
3733-v1 Linac-Booster Beam Interface Valeri A Lebedev Beam Dynamics
Beam Dynamics
06 Dec 2010
3731-v1 Proton Source Workshop - task force report William A Pellico Booster
Linac
06 Dec 2010
3722-v2 Pre-injector Upgrade Updates (10 Nov – 01 Dec 2010) Cheng-Yang Tan Pre-Accelerator
02 Dec 2010
3711-v1 Pre-injector Upgrade Updates (27 Oct – 10 Nov 2010) Cheng-Yang Tan Pre-Accelerator
10 Nov 2010
3708-v1 Proton Source Task Force Talk - APT_Seminar William A Pellico Booster
Linac
04 Nov 2010
3701-v1 Pre-injector Upgrade Updates (13 Oct – 27 Oct 2010) Cheng-Yang Tan Pre-Accelerator
27 Oct 2010
3695-v1 Pre-injector Upgrade Updates (29 Sep – 13 Oct 2010) Cheng-Yang Tan Pre-Accelerator
13 Oct 2010
3689-v1 Task Force Report - Directorate Meeting William A Pellico Upgrades
Upgrades
05 Oct 2010
3684-v1 Pre-injector Upgrade Updates (15 Sep – 29 Sep 2010) Cheng-Yang Tan Pre-Accelerator
29 Sep 2010
3678-v1 MFC DSP Software Outline Philip Varghese LLRF
LLRF
ILCTA
LLRF
23 Sep 2010
3676-v1 Multi‐cavity Field Control (MFC) Module Description Philip Varghese LLRF
LLRF
LLRF
NML
23 Sep 2010
3672-v1 Pre-injector Upgrade Updates (01 Sep – 15 Sep 2010) Cheng-Yang Tan Pre-Accelerator
15 Sep 2010
3667-v1 Continued Monitoring of the Conditioning of the Fermilab Linac 805 MHz Cavities Fernanda G Garcia et al. Operations
09 Sep 2010
3663-v1 Pre-injector Upgrade Updates (18 Aug – 01 Sep 2010) Cheng-Yang Tan Pre-Accelerator
01 Sep 2010
3660-v4 Proton Source Task Force Report William A Pellico Booster
Linac
26 Aug 2010
3658-v1 Pre-injector Upgrade Updates (13 Jul – 18 Aug 2010) Cheng-Yang Tan Pre-Accelerator
18 Aug 2010
3633-v1 Pre-injector Upgrade Updates (09 Jun – 30 Jun 2010) Cheng-Yang Tan Pre-Accelerator
30 Jun 2010
3625-v1 Pre-injector Upgrade Updates (26 May – 09 Jun 2010) Cheng-Yang Tan Pre-Accelerator
09 Jun 2010
3616-v2 Pre-injector Upgrade Updates (12 May - 26 May 2010) Cheng-Yang Tan Pre-Accelerator
26 May 2010
3608-v1 Pre-injector Upgrade Updates (29 Apr – 12 May 2010) Cheng-Yang Tan Pre-Accelerator
12 May 2010
3601-v1 Pre-injector Upgrade Updates (14 Apr – 28 Apr 2010) Cheng-Yang Tan Pre-Accelerator
28 Apr 2010
3599-v1 Chopping in the H- Source Robyn L Madrak et al. Studies
22 Apr 2010
3595-v2 Pre-injector Upgrade Updates (31 Mar – 14 Apr 2010) Cheng-Yang Tan Pre-Accelerator
14 Apr 2010
3581-v1 Pre-injector Upgrade Updates (31 Mar 2010) Cheng-Yang Tan Pre-Accelerator
31 Mar 2010
3575-v1 Pre-Injector Overview & Goals Cheng-Yang Tan Pre-Accelerator
17 Mar 2010
3549-v1 Linac Briefing to the Directorate - August 2002 Bob Webber Pre-Accelerator
Spares and Maintenance
Operations
Linac
Upgrades
11 Feb 2010
3545-v1 CW SRF H- LINAC AS A PROTON DRIVER FOR MUON COLLIDERS AND NEUTRINO FACTORIES Chuck Ankenbrandt et al. Project X
Linac
03 Feb 2010
3506-v1 Linac and A0 water temperature regulation James L. Crisp HLRF
Controls
Operations
Water
Linac
24 Nov 2009
3505-v1 HINS MDB Ion Source Safety Documents Roger Dixon et al. Project X
Linac
23 Nov 2009
2616-v13 HINS R&D Activities at Meson Detector Building Jim Steimel et al. Future Accelerators
Adv. Accelerator R&D
Linac
Proton Driver
22 Oct 2009
3456-v1 HINS - LLRF Julien Branlard LLRF
Project X
23 Sep 2009
3444-v1 9mA beam current study at FLASH - DESY Julien Branlard et al. LLRF
01 Sep 2009
3443-v1 Operational Solution to Obtaining a Flat Vector Sum from Multiple Cavities with Gradient Disparities Julien Branlard et al. LLRF
01 Sep 2009
3442-v1 Coupling Adjustments for Cavities with Gradient Disparities Julien Branlard et al. LLRF
01 Sep 2009
3428-v1 Fermilab Low Energy Linac Low Level RF Upgrade Engineering Notes and Operational Guide Edward W. Cullerton et al. LLRF
LLRF
13 Aug 2009
3400-v1 A Hybrid Design of Project-X Weiren Chou Project X
Linac
21 May 2009
3396-v1 Report: Temporal jitter studies at the A0 photoinjector Timothy J Maxwell et al. Beam Instrumentation
18 May 2009
3384-v1 PHASE AND FREQUENCY LOCKED MAGNETRONS FOR SRF SOURCES Rol Johnson et al. HLRF
Linac
06 May 2009
3343-v1 HINS Beam Dynamics & Diagnostics Mini-Workshop Jean-Paul Carneiro et al. Beam Dynamics
Future Accelerators
Beam Instrumentation
Adv. Accelerator R&D
Linac
Instrumentation
20 Mar 2009
3331-v1 Simulation of a LINAC RF station Julien Branlard LLRF
11 Mar 2009
3310-v1 Nuclear Applications of Accelerators; Experience in the 'A' Programs (APT, ATW, AAA, AFCI) Laurie Waters Accelerator Seminar
Linac
18 Feb 2009
3301-v2 Analysis of RFQ Vacuum System for HINS Tests at MDB Henryk Piekarz Vacuum
Linac
Proton Driver
18 Feb 2009
3269-v1 A 750 keV RFQ for the Fermilab Linac Milorad B. Popovic Pre-Accelerator
Linac
Upgrades
17 Dec 2008
3265-v1 Visit to BNL 17-19 Nov 2008 Dan Bollinger et al. Pre-Accelerator
08 Dec 2008
3224-v1 AN 8 GEV CW LINAC WITH HIGH POTENTIAL BEAM POWER Chuck Ankenbrandt et al. Project X
Linac
07 Oct 2008
3168-v1 g-2 at Fermilab Chuck Ankenbrandt et al. Booster
Recycler
Upgrades
Linac
EXP Notes
Antiproton Source
28 Jul 2008
3155-v1 Evolutionary Optimization Methods for Accelerator Design Alexei Poklonskiy Accelerator Seminar
Beam Dynamics
Beam Dynamics
Future Accelerators
09 Jul 2008
3124-v1 FNAL Accelerator Complex Status Ron Moore External Beams
Booster
Main Injector
Tevatron
Operations
Recycler
Linac
Antiproton Source
20 Jun 2008
3081-v1 HINS Talk to AD Controls Dept - April 2008 Bob Webber Project X
Linac
Proton Driver
Controls
29 Apr 2008
3056-v1 H- Ion Source Spec for HINS and Considerations for Project X H- Ion Source Charles W. Schmidt et al. Pre-Accelerator
Other
Project X
Linac
Proton Driver
19 Mar 2008
3042-v1 Linac 805 MHz LLRF manual Ralph Pasquinelli LLRF
22 Feb 2008
2986-v2 HINS R&D Program Goals Statement Bob Webber Project X
Linac
Proton Driver
23 Jan 2008
2918-v1 Overview of HINS Operations and Radiation Shielding Considerations in MDB Bob Webber Linac
Proton Driver
05 Nov 2007
2745-v2 Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber Linac
Proton Driver
16 Apr 2007
2716-v1 Delivering Muons to the MuCool Test Area Chuck Ankenbrandt et al. Booster
Muon Collider
Linac
Muon Collider R&D
23 Mar 2007
2693-v1 HINS Presentation to AD Department Heads Bob Webber Linac
Proton Driver
16 Mar 2007
2634-v0 Effect of Possible Furlough on the Fermilab Neutron Therapy Facility Eric J Prebys Pre-Accelerator
Operations
NTF
06 Feb 2007
2589-v3 Studies of the stability of the Dispersion Free Steering method Paul Lebrun Beam Dynamics
Adv. Accelerator R&D
24 Jan 2007
2605-v1 survey of H- ion sources for accelerators Jens Peters Pre-Accelerator
Accelerator Seminar
Proton Driver
09 Jan 2007
2595-v2 Proceedings of the miniworkshop on Possible Advanced Accelerator R&D Directions at the ILC Test Accelerator (NML) at Fermilab Philippe R.-G. Piot Beam Dynamics
Optics
Adv. Accelerator R&D
28 Dec 2006
2514-v1 Dynamical Alignment in presence of ground motion & technical noise Valentin Ivanov Other
10 Oct 2006
2326-v1 Cavity and Beam Excitation for the Linac--7835 Tube Lifetimes Elliott S McCrory HLRF
Spares and Maintenance
Operations
06 Jul 2006
2256-v4 The Linac 7835 Online Database Elliott S McCrory Spares and Maintenance
Controls
Operations
07 Jun 2006
2212-v2 Tank 1 Emittance Probes configuration and angular resolution Doug Moehs Beam Instrumentation
03 Apr 2006
2213-v2 H Minus Pre-accelerator Emittance Probes_angular resolution Doug Moehs Pre-Accelerator
Beam Instrumentation
03 Apr 2006
2193-v1 Brief Report from the BNL Trip on Feb 14-15, 2006 Henryk Piekarz Pre-Accelerator
Proton Driver
14 Mar 2006
2192-v1 Site visit to Brookhaven National Laboratory Doug Moehs Pre-Accelerator
Proton Driver
14 Mar 2006
2191-v2 RF Ion Source Topics Discussed at DESY Doug Moehs Pre-Accelerator
Proton Driver
14 Mar 2006
2171-v4 MTBF for the Tevatron, 2004-06 Elliott S McCrory General
Operations
Status
03 Mar 2006
2092-v1 A Low Energy Beam Transport System for the Superconducting Proton Linac Milorad B. Popovic Pre-Accelerator
10 Jan 2006
1929-v1 Definition and Approximate Schedule of Phases of Proton Driver Related Activity at the Meson Detector Building Bob Webber Projects
Other
12 Aug 2005
1862-v1 Effects on the Linac Beam from Random Noise in Quads Doug Moehs et al. Beam Dynamics
Multiparticle
08 Jun 2005
1814-v1 Status of the Fermilab Drift Tube Linac Milorad B. Popovic Beam Dynamics
Multiparticle
06 May 2005
1785-v1 Replacing the 35 year old components in the Linac Elliott S McCrory HLRF
21 Apr 2005
1587-v1 The 7835 Power Tubes in the Fermilab Linac Elliott S McCrory HLRF
18 Feb 2005
1554-v1 4616 Tube Lifetime Data Elliott S McCrory HLRF
01 Feb 2005
1525-v2 Linac Filament and 7835 Life issues Elliott S McCrory HLRF
14 Jan 2005
1510-v3 Linac 7835 Power Tube Lifetime Analysis: An Update Elliott S McCrory HLRF
29 Dec 2004
1471-v2 The Fermilab Linac Upgrade Project Elliott S McCrory Upgrades
29 Nov 2004
1428-v1 Run 2 Operational Status and Plans for FY05 Dave McGinnis Operations
Operations
Operations
Operations
Operations
01 Nov 2004
1295-v1 Combined ESME-ORBIT Space-Charge Simulation for the Booster Phil S. Yoon Beam Dynamics
Beam Dynamics
Longitudinal Dynamics
Transverse Dynamics
06 Aug 2004
1138-v1 A Simple Beam Line for the MuCool Test Area Chuck Ankenbrandt Future Accelerators
Adv. Accelerator R&D
Upgrades
22 Apr 2004
1137-v1 A Simple Beam Line for the MuCool Test Area Chuck Ankenbrandt Upgrades
22 Apr 2004
1112-v1 Fermilab Drift Tube Linac Revisited Milorad B. Popovic Beam Dynamics
08 Apr 2004
962-v1 Linac Klystron Activity and Status May 1998 to October 2000 Bob Webber HLRF
HLRF
07 Jan 2004
921-v1 Linac Upgrade Scenarios 2003 Elliott S McCrory Upgrades
21 Nov 2003
740-v1 Instrumentation Breakout for DOE Run II Review July 2003 Keith E Gollwitzer et al. Talks
Beam Instrumentation
BPM
Beam Instrumentation
Instrumentation
Beam Instrumentation
ACNET
Electron Cooling
Beam Instrumentation
23 Jul 2003
198-v2 A Phase Trombone for the Recycler Ring Alper A Garren et al. Lattice
08 Jul 2003
630-v1 An 8-GeV Synchrotron-Based Proton Driver Weiren Chou Future Accelerators
Upgrades
Upgrades
28 May 2003
516-v1 Proton Source Department Meeting, March 12, 2003 Elliott S McCrory Operations
Operations
20 Mar 2003
515-v1 Proton Economics Elliott S McCrory Operations
Operations
20 Mar 2003
514-v1 BD Seminar on Linac Performance, Winter 2003 Elliott S McCrory HLRF
Spares and Maintenance
Operations
20 Mar 2003
212-v2 Short Summary of my Visit to Fermilab Charles Steinbach Extraction
HLRF
Project
10 Sep 1996

Number of documents found: 247

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 3 wallclock secs ( 0.60 usr + 0.14 sys = 0.74 CPU)