Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Schottky (subtopic of Instrumentation) are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
4132-v1 Microwave Schottky diagnostic systems for the Fermilab Tevatron, Recycler, and CERN LHC Ralph Pasquinelli Schottky
17 May 2012
3709-v2 LARP LHC 4.8 GHz Schottky system Ralph Pasquinelli Schottky
05 Nov 2010
1993-v1 Tevatron Schottky Progress & LARP Schottky Task Status Andreas Jansson Instrumentation
Schottky
17 Oct 2005
1896-v1 Beam-beam tune spread measurement with 1.7 GHz Schottky Andreas Jansson Tevatron Tune
Beam-beam Effects
Instrumentation
Schottky
08 Jul 2005
1238-v1 EXPERIENCE WITH THE 1.7 GHZ SCHOTTKY PICK-UPS IN THE TEVATRON Andreas Jansson et al. Tevatron Tune
Schottky
12 May 2005
1815-v2 A BETATRON TUNE FITTING PACKAGE FOR THE TEVATRON 21.4 MHZ SCHOTTKY Paul Lebrun et al. Instrumentation
Schottky
09 May 2005
1764-v2 Proposal for a LARP Schottky task Andreas Jansson Schottky
12 Apr 2005
1763-v2 Recent results from Tevatron Microwave Schottky Andreas Jansson Tevatron Tune
Instrumentation
Schottky
12 Apr 2005
1576-v2 Effect of coupling on 1.7 GHz Schottky tunes Andreas Jansson Tevatron Tune
Tune Measurement
Instrumentation
Schottky
30 Mar 2005
1337-v2 notes from Instrumentation/Beam Physics Meetings Nathan Eddy et al. Intensity Measurements
SyncLite (SL)
Tune Measurement
Sampled Bunch Display (SBD)
FBI
DCCTs
Ion Profile Monitor
Instrumentation/beam Physics
Schottky
Dampers
Abort Gap Measurements
Flying Wires
29 Mar 2005
1749-v4 Tevatron Microwave Shottky Andreas Jansson Tevatron Tune
Schottky
28 Mar 2005
1616-v1 Proposal for Microwave Schottky Pick-ups Ralph Pasquinelli Schottky
15 Mar 2005
1596-v2 Microwave Schottky for the LHC Andreas Jansson Tevatron Tune
Instrumentation
Schottky
03 Mar 2005
1409-v1 GHz Schottky monitors for the LHC Andreas Jansson Schottky
14 Oct 2004
1399-v0 GHz range Shottky monitor for the LHC Andreas Jansson Schottky
07 Oct 2004
931-v6 Implementation of the Tevatron OAC 1.7 Shottky monitor. Paul Lebrun Java Data Acquisition
Schottky
26 Jul 2004
1239-v1 EXPERIENCE WITH THE 1.7 GHZ SCHOTTKY PICK-UPS IN THE TEVATRON - CONFERENCE POSTER Andreas Jansson et al. Tevatron Tune
chromaticity
Emittance
Instrumentation
Schottky
05 Jul 2004
372-v2 Calibration of the Recycler Transverse Schottky Detectors Martin J. Hu Beam Instrumentation
ACNET
Schottky
28 Jun 2004
856-v1 Proposal to Upgrade the Tevatron Tune Fitters, 21.4 MHz and 1.7GHz Paul Lebrun Tevatron Tune
Schottky
30 Sep 2003
369-v1 Longitudinal Schottky Pickup for the Recycler Edward W. Cullerton et al. Beam Instrumentation
Schottky
29 Jul 2003
570-v1 Design and RF Measurement Results of Schottky Pickup for Recycler and Tevatron Ding Sun Beam Instrumentation
Instrumentation
Schottky
29 Apr 2003
569-v1 Design and Measurement Results of Microwave Absorbers in Schottky Ding Sun Beam Instrumentation
Instrumentation
Schottky
29 Apr 2003
568-v1 Dimensions and Measurements of Waveguide-Coax Launchers in Schottky Pickup for Recycler and Tevatron Ding Sun Beam Instrumentation
Instrumentation
Schottky
29 Apr 2003
529-v1 Notes for MI/RR Group Meeting of 19 March 2003 Bruce C. Brown MI-RR-Group
Beam Instrumentation
Magnets
Vacuum
Schottky
24 Mar 2003
210-v1 StATUS OF THE tEVATRON tUNE tRACKER Paul Lebrun Beam Studies
Schottky
19 Mar 2003
420-v1 On Tevatron TuneTracker/Meter, Status & Plan Paul Lebrun Tevatron Tune
Schottky
30 Jan 2003
223-v1 MI Instrumentation: Layouts and Rack Layouts Gregory L. Vogel Controls
Beam Instrumentation
Schottky
BPM
21 Oct 1996

Number of documents found: 27

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.25 usr + 0.04 sys = 0.29 CPU)