Beams-doc-# Title Author(s) Topic(s) Last Updated
5804-v1 LLRF Controls Settings Craig C Drennan LLRF
01 Sep 2017
5780-v1 Longitudinal Beam Tomography for the Booster Beam Chandrashekhara M. Bhat Studies
Beam Physics
09 Aug 2017
5762-v1 Beam based RF voltage measurements and Longitudinal beam tomography at the Fermilab Booster for Intensity Upgrade Chandrashekhara M. Bhat Studies
04 Aug 2017
5675-v1 Beam Emittance using MW in MI8 for two different LINAC beam Currents Chandrashekhara M. Bhat et al. Studies
Beam Physics
23 Jul 2017
5717-v1 2nd Harmonic RF for the Bunch Rotation in the Fermilab Booster Chandrashekhara M. Bhat Beam Physics
HLRF
24 Jul 2017
5366-v1 Intensity Dependence of Transition Crossing in the Booster Chandrashekhara M. Bhat Studies
Beam Physics
12 Apr 2017
5362-v2 Booster RF Voltage by Synchrotron Frequency Measurements at Extraction Chandrashekhara M. Bhat et al. Booster
Studies
Beam Physics
HLRF
12 Apr 2017
5344-v6 Booster Vrf by fsy Measurements at Injection Energy (400 MeV on a DC-Mode) Chandrashekhara M. Bhat HLRF
Beam Physics
LLRF
22 Mar 2017
5350-v4 Y567b Power Amplifier Tests at 76 and 106 MHz Robyn L Madrak et al. Upgrades
PIP
HLRF
22 Mar 2017
5334-v1 Collection of Booster Synchronization Documents Craig C Drennan LLRF
03 Mar 2017
5307-v4 New Booster LLRF DDS -- ACNET Parameters and Curve Application Notes Craig C Drennan et al. LLRF
28 Feb 2017
5295-v1 Proton Beam Intensity Upgrades for the Neutrino Program at Fermilab Chandrashekhara M. Bhat Booster
Other
Longitudinal Dynamics
Beam Physics
15 Dec 2016
5294-v1 PIP New Tuners Summary Report Patrick G. Sheahan et al. PIP
HLRF
14 Dec 2016
5288-v1 Criteria for proceeding with replacement Booster cavity (PIP) William A Pellico Booster
PIP
05 Dec 2016
5273-v1 Booster Acceleration Phase Lock Controller Craig C Drennan Operations
LLRF
15 Nov 2016
4411-v7 Booster LLRF System Block Diagram Craig C Drennan LLRF
14 Nov 2016
5247-v1 MI8 line Beam emittance measurement Ming-jen Yang Booster
Main Injector
Recycler
06 Oct 2016
5208-v1 Proton Beam Intensity Upgrades for the Neutrino Program at Fermilab Chandrashekhara M. Bhat Booster
Beam Physics
11 Aug 2016
5205-v1 R&D on Beam Injection and Bunching Scheme in the Fermilab Booster Chandrashekhara M. Bhat Booster
09 Aug 2016
4964-v2 Cogging Test Switch Craig C Drennan LLRF
23 Jun 2016
5166-v1 VME DDS Frequency Curves Craig C Drennan LLRF
25 May 2016
5146-v2 Acceleration and transition crossing in Booster Valeri A Lebedev Studies
Beam Physics
17 May 2016
5150-v1 Phase Changes to A RF and B RF at Transition Craig C Drennan LLRF
04 May 2016
5101-v1 A historical comparison of Booster radiation activations surveys William A Pellico Booster
16 Mar 2016
5097-v2 Laser Notcher Status David E. Johnson Projects
Projects
PIP
02 Mar 2016
4459-v2 Booster Paraphase Curve Generator VXI Module Craig C Drennan LLRF
17 Feb 2016
5058-v3 An Update on Early Injection Capture in the Booster Chandrashekhara M. Bhat Operations
PIP
01 Feb 2016
5042-v1 Tipping Analysis for 3 Point Stands Kris A Anderson Magnets
Design Properties
Other
Other
Civil
Other
Magnets
11 Jan 2016
4610-v18 PIP RF Cavity and Tuners Refurbishement Progress & Projections Keith E Gollwitzer Upgrades
PIP
11 Jan 2016
5028-v3 Injection Studies in the Booster Chandrashekhara M. Bhat Studies
16 Dec 2015
5014-v1 Beam Injection and Capture Chandrashekhara M. Bhat Booster
Beam Dynamics
Upgrades
25 Nov 2015
4864-v2 Simplified Modeling of Space Charge Losses in Booster at Injection Alexander A. Valishev Beam Dynamics
PIP
23 Nov 2015
3891-v3 VME-DDS Frequency and Phase Control Module Craig C Drennan LLRF
17 Nov 2015
4781-v2 Booster to Main Injector Phase-Lock Controller Craig C Drennan LLRF
16 Nov 2015
4960-v1 PIP Status Report Meeting Ken Domann et al. Booster
PIP
26 Sep 2015
4932-v3 An ACNET Application Program to Measure the Energy Spread of Multi-turn Beam in the Booster at Injection Chandrashekhara M. Bhat et al. Studies
16 Sep 2015
4943-v1 Proton Improvement Plan / Proton Source Ready for 700kW William A Pellico Booster
PIP
10 Sep 2015
4938-v1 New VXI board for GMPS Kiyomi Seiya Power Supplies
01 Sep 2015
4936-v1 Early Injection studies -- Frequency Trigger OR'ing Module Craig C Drennan LLRF
28 Aug 2015
4935-v1 Acceleration Gate Module Craig C Drennan LLRF
28 Aug 2015
4928-v1 Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandrashekhara M. Bhat Upgrades
18 Aug 2015
4920-v1 PIP Status Report Meeting Ryan Crawford et al. Booster
PIP
Linac
12 Aug 2015
4884-v1 Data Transfer Protocol for the USB to FIFO Interface Craig C Drennan et al. LLRF
13 Jul 2015
4872-v2 The LHC in Context and the Current Status Chandrashekhara M. Bhat Other
Other
News
27 Jun 2015
4827-v5 XFR Modification to Resetting Beam Sync (AA) and Offset Beam Sync (OAA) Craig C Drennan Operations
LLRF
RF
LLRF
RF
LLRF
05 Jun 2015
4790-v1 Early Beam Injection in the Fermilab Booster & its Implementation Plan Chandrashekhara M. Bhat Beam Dynamics
Operations
Studies
Upgrades
HLRF
LLRF
12 May 2015
929-v3 ACL An Introduction Brian S. Hendricks General
Controls
Controls
Controls Working Group
Controls
Console Applications
ACNET
Controls
06 May 2015
4779-v1 PIP Status Report Meeting Ryan Crawford et al. Booster
PIP
09 Mar 2015
4777-v1 Booster 20 Hz tests George E. Krafczyk Booster
02 Mar 2015
4775-v1 Performing Vacuum Calculations Using ANSYS Kris A Anderson Vacuum
Vacuum
Vacuum
Vacuum
Vacuum
Vacuum/Water/Utilities
Vacuum
27 Feb 2015
4763-v1 PIP Status Report Meeting Tom N Kubicki et al. Booster
PIP
HLRF
13 Feb 2015
4753-v1 PIP Status Report Meeting Ken Domann et al. Booster
PIP
02 Feb 2015
4719-v1 Enhancements of the Fermilab Booster to Reduce Losses and Extend Lifetime: The Proton Improvement Plan Robert M Zwaska Booster
PIP
Linac
30 Nov 2014
4718-v1 PIP Status Report Meeting Ken Domann et al. PIP
HLRF
25 Nov 2014
4712-v1 PIP Status Report Meeting Ryan Crawford et al. Booster
PIP
Linac
19 Nov 2014
4700-v2 Preparing for PIP II - What are the issues and plans for Booster William A Pellico Accelerator Seminar
Booster
PIP
18 Nov 2014
4701-v1 A 1-shot sequence for Booster studies Chandrashekhara M. Bhat et al. Studies
Controls
12 Nov 2014
4684-v1 PIP General Meeting Status Update Keith E Gollwitzer Booster
PIP
Linac
Regular Meetings
16 Oct 2014
4683-v3 Booster Injection in PIP-II Era An Update David E. Johnson Upgrades
14 Oct 2014
4679-v1 Total Loss Monitor Radiation Safety System Anthony F. Leveling Accelerator Seminar
Booster
Muon
08 Oct 2014
4676-v1 Head-Tail Modes for FNAL Booster Timofey Zolkin Accelerator Seminar
Booster
Beam Dynamics
30 Sep 2014
4664-v4 Numerical Studies for Proton Improvement Plan at Fermilab Leonid Vorobiev Instabilities
Beam Dynamics
Longitudinal Dynamics
Beam Dynamics
Transverse Dynamics
PIP
Energy Deposition
19 Sep 2014
4661-v2 PIP Shutdown Meeting - Laser Notcher Status David E. Johnson Booster
Upgrades
20 Aug 2014
4647-v1 A Proposal for Booster Lattice Modification Milorad B. Popovic Booster
Upgrades
03 Aug 2014
4645-v1 PIP and PIP-II Status and Plans Sergei Nagaitsev Booster
Main Injector
Recycler
25 Jul 2014
4628-v1 PIP Status Report Meeting Ryan Crawford et al. Booster
PIP
26 Jun 2014
4620-v1 PIP Status Report Meeting William A Pellico et al. Booster
PIP
HLRF
20 Jun 2014
4598-v4 Approximate Current Changes Needed In Booster Quadrupoles For A Given Tune Change Cheng-Yang Tan Other
16 May 2014
4587-v1 PIP Status Report Meeting Nathan Eddy et al. Booster
PIP
30 Apr 2014
3696-v2 Installation, Timing and Gating Details for BPM’s In the Booster and 400 MeV Line Craig C Drennan Beam Instrumentation
22 Apr 2014
4568-v1 A Look at The Longitudinal Beam Dynamics of the Booster Beam: Experiment and Simulations Chandrashekhara M. Bhat et al. Booster
Beam Dynamics
Operations
Upgrades
09 Apr 2014
4565-v1 Booster Bias Supply Upgrade Patrick G. Sheahan Booster
PIP
02 Apr 2014
4537-v2 Linac Laser Notcher Project in the Proton Improvement Plan Kevin Duel et al. Pre-Accelerator
Accelerator Seminar
Booster
Linac
01 Apr 2014
4554-v1 PIP General Info Salah Chaurize et al. Booster
PIP
13 Mar 2014
4550-v2 Booster RF System Upgrades for 15 Hz Operation John S Reid et al. Accelerator Seminar
Upgrades
04 Mar 2014
4414-v5 Booster Longitudinal Damper System Block Diagram -- Draft for Review Craig C Drennan Beam Dynamics
LLRF
03 Mar 2014
4546-v2 Beam Energy Spread in the Booster at Injection Chandrashekhara M. Bhat et al. Beam Dynamics
Operations
Upgrades
Projects
19 Feb 2014
3781-v2 Proton Source Improvement Plan 2011 Valeri A Lebedev et al. Booster
Linac
03 Feb 2014
4497-v1 PIP-II: A Plan for Developing Multi-MW Capabilities at Fermilab & Overview of Physics Opportunities with High-intensity Proton Beams Stephen D. Holmes et al. Accelerator Seminar
Future Accelerators
Main Injector
Upgrades
12 Dec 2013
4492-v1 PIP General Info Ken Domann et al. Beam Dynamics
PIP
LLRF
04 Dec 2013
4490-v1 Status of Pulser for Short Magnets Chris Jensen Power Supplies
PIP
04 Dec 2013
4481-v2 Parameter table for Fermilab Megawatt Power Upgrade Sergei Nagaitsev Upgrades
Upgrades
18 Nov 2013
4340-v2 Accuracy and Performance Upgrade of PIC and Hybrid Space-Charge Solvers Leonid Vorobiev Beam Dynamics
Beam Dynamics
Beam Dynamics
Multiparticle
12 Nov 2013
4479-v1 Preliminary consideration of perpendicularly biased Booster cavity Gennady Romanov PIP
HLRF
07 Nov 2013
4443-v1 Booster Cavity: Parametric Study Mohamed H Hassan et al. Booster
PIP
HLRF
16 Sep 2013
4431-v1 Booster Aperture and Alignment Kiyomi Seiya Booster
PIP
22 Aug 2013
4419-v1 Booster New Cavities - PIP Mohamed H Hassan Booster
PIP
24 Jul 2013
4413-v1 Booster LLRF VXI DSP Module 2013 Craig C Drennan LLRF
15 Jul 2013
4153-v5 Booster Main Injector Phase Lock Divide-By-32 Phase Error Trajectory Method Craig C Drennan LLRF
18 Jun 2013
4381-v2 Status of the New MI and RR Beam Profiling Measurement Devices Randy M Thurman-Keup et al. Accelerator Seminar
Beam Instrumentation
Beam Instrumentation
Beam Instrumentation
11 Jun 2013
4367-v1 Booster Cogging Teststand Notes Craig C Drennan et al. Operations
10 May 2013
4363-v2 Plans for Booster & Linac Transformer Installation Ryan Crawford Booster
Upgrades
PIP
Linac
Upgrades
08 May 2013
4365-v1 PIP Vacuum Upgrades and Future Plans David Augustine Booster
PIP
08 May 2013
3723-v13 Booster Beam Loss Monitor Integrator and Data Acquisition Upgrade Craig C Drennan Operations
Front-end Services
Beam Instrumentation
17 Apr 2013
4337-v1 Booster ORM status Eliana Gianfelice-Wendt Beam Dynamics
PIP
10 Apr 2013
4335-v1 Booster Transition Crossing Yuri Alexahin Booster
Beam Dynamics
PIP
03 Apr 2013
4331-v1 Development of alternative method for Booster TBT data Analysis Alexey Boldyrev Beam Dynamics
02 Apr 2013
2757-v3 Updating Calibration Values in the Booster BPM System Craig C Drennan BPM
Upgrades
02 Apr 2013
4126-v2 A 1-GeV Accumulator Ring in the Booster Tunnel Chuck Ankenbrandt et al. Booster
Project X
Linac
13 Mar 2013
4313-v1 Plans for Booster Optics Correction Eliana Gianfelice-Wendt Booster
Beam Dynamics
13 Mar 2013
4312-v1 Booster Ferrite Bias Supply Upgrade Patrick G. Sheahan Booster
Upgrades
PIP
HLRF
13 Mar 2013
4308-v1 Linac BPM Status Update Elliott S McCrory BPM
Beam Instrumentation
Console Applications
PIP
Beam Instrumentation
06 Mar 2013
4304-v1 Update of Booster Alignment & Magnet Moves Kiyomi Seiya Booster
Beam Dynamics
PIP
25 Feb 2013
4301-v1 Booster Beam Notching Installation Update Salah Chaurize Booster
Beam Dynamics
Upgrades
PIP
25 Feb 2013
4283-v1 Linac BPM Commissioning Notes Elliott S McCrory BPM
Beam Instrumentation
Front-end Systems
Beam Instrumentation
31 Jan 2013
4282-v1 Design of Booster Transverse Damper Timofey Zolkin Booster
Beam Dynamics
Upgrades
PIP
30 Jan 2013
4281-v1 Design of the Booster transverse damper. Timofey Zolkin Beam Dynamics
PIP
30 Jan 2013
4276-v1 Applications for Linac BPMs Elliott S McCrory BPM
Beam Instrumentation
Java Appl Framework
Beam Instrumentation
29 Jan 2013
4274-v1 Simulation of Booster Transverse Instabilities Alexandru Macridin Booster
Beam Dynamics
PIP
16 Jan 2013
4267-v2 BOOSTER NOTCH ABSORBER ASSEMBLY Vladimir Sidorov Booster
PIP
10 Jan 2013
4268-v1 Final Update - 2012 Booster LCW Improvement Plan David Hixson Upgrades
PIP
09 Jan 2013
4266-v1 Refurbished Booster RF John S Reid Booster
Upgrades
PIP
HLRF
21 Dec 2012
4258-v4 Longitudinal Dynamics Studies for Proton Improvement Plan (PIP) at Fermilab Leonid Vorobiev Beam Dynamics
Longitudinal Dynamics
PIP
06 Dec 2012
4246-v1 Project Status Update Ken Domann et al. Projects
Projects
PIP
09 Nov 2012
4243-v2 Compensating for injection slewing with Booster corrector magnets in the Project X era Eric J Prebys Upgrades
25 Oct 2012
4242-v1 PIP Update Talk Booster Notched Beam Kicker Pulser General Talk Salah Chaurize Booster
PIP
24 Oct 2012
4241-v1 Refurbished Booster RF John S Reid PIP
HLRF
24 Oct 2012
4240-v1 PIP - General Info William A Pellico et al. Booster
PIP
Linac
24 Oct 2012
4236-v1 Proton Improvement Plan - S&T Review William A Pellico Booster
PIP
Linac
04 Oct 2012
4235-v1 Booster 150 KW Power Amplifier - Status Update Steve Kotz HLRF
03 Oct 2012
4229-v2 Progress Update - 2012 Booster LCW Improvement Plan David Hixson Operations
Upgrades
PIP
26 Sep 2012
4228-v1 Linac MCC/Transformer, Hatch, Booster Transformers, Anode Supply Ryan Crawford Booster
Upgrades
PIP
Linac
Upgrades
25 Sep 2012
4221-v1 Booster Notch Absorber Update Vladimir Sidorov Booster
PIP
19 Sep 2012
4209-v1 Booster L12/Noker-L13/Absorber Update Salah Chaurize Booster
Upgrades
PIP
30 Aug 2012
4203-v1 PIP Booster RF Mudulators Status Update Rene Padilla HLRF
22 Aug 2012
4199-v1 Booster Turbo Manifold Design Analysis David Augustine Booster
Upgrades
PIP
Vacuum
21 Aug 2012
4198-v1 Booster Cogging Teststand Progress -- PIP Presentation Craig C Drennan et al. Upgrades
PIP
LLRF
20 Aug 2012
4197-v1 New Ferrite Testing for Booster Tuners Dennis Barak et al. PIP
HLRF
15 Aug 2012
4195-v1 Linac Substation L1 & Booster Substation Y-BE2 --- Update #3 Ryan Crawford Booster
Upgrades
PIP
Linac
Upgrades
15 Aug 2012
3367-v1 Characterization of the Fast Phase Detector in the Booster LLRF System Craig C Drennan Operations
Controls
LLRF
24 Jul 2012
3889-v3 Linac Beam Velocity Measurement Craig C Drennan Operations
Controls
Beam Instrumentation
Front-end Systems
Operations
Beam Instrumentation
24 Jul 2012
4182-v1 PIP - General Info William A Pellico et al. Upgrades
PIP
19 Jul 2012
4180-v1 Second Refurbished Booster RF Cavity for 15Hz John S Reid PIP
HLRF
18 Jul 2012
4179-v1 Booster Bias Supply & Test Stand Patrick G. Sheahan Power Supplies
PIP
HLRF
18 Jul 2012
3922-v2 Booster Dual Phase Detector Module for MI Phase Lock Control Craig C Drennan LLRF
17 Jul 2012
4168-v1 PIP - General Info Robert M Zwaska Booster
PIP
Linac
27 Jun 2012
4166-v1 Laser Notcher Status David E. Johnson Projects
PIP
27 Jun 2012
4165-v1 If You Build It, They Will Come , 8GeV CW Linac: A Staged Approach Milorad B. Popovic Accelerator Seminar
Booster
Project X
Linac
27 Jun 2012
4164-v1 PIP - General Info Salah Chaurize et al. Booster
Upgrades
PIP
20 Jun 2012
4131-v1 MI and Recycler Injection in the NOvA Era Ioanis Kourbanis LLRF
LLRF
LLRF
17 May 2012
4124-v1 Spectrum Measurements of GPMS Reference Magnet System Xiaolong Zhang et al. Studies
09 May 2012
4114-v1 Proton source shutdown schedule Mary Convery Booster
Linac
18 Apr 2012
4108-v1 A Concept: 8 GeV CW Linac, Staged Approach Milorad B. Popovic Booster
Project X
Linac
10 Apr 2012
4106-v1 L13 Notched Beam Absorber Update Salah Chaurize Booster
Operations
Upgrades
PIP
05 Apr 2012
4099-v2 GMPS Transductor Upgrades Xiaolong Zhang et al. Upgrades
Data Acquisition
04 Apr 2012
4103-v1 PIP Presentation on Booster Main Injector Phase Lock Craig C Drennan PIP
LLRF
28 Mar 2012
4098-v1 Synoptic Overview Alex Waller Controls
Controls
21 Mar 2012
4081-v4 Booster Nocthing and Absorber Review Salah Chaurize et al. Booster
PIP
21 Mar 2012
4089-v1 Calibration of Booster BPMs using IPM, and measurement of quad center relative to BPMs Meghan J McAteer Booster
PIP
Alignment
14 Mar 2012
4084-v1 First Refurbished Booster RF Cavity for 15Hz John S Reid Booster
PIP
HLRF
07 Mar 2012
4083-v1 PIP - General Info William A Pellico et al. Booster
PIP
Linac
07 Mar 2012
4082-v1 PIP - Booster RF Tuner and cavity Refurbishment Matt Slabaugh Booster
PIP
HLRF
07 Mar 2012
4079-v1 Update of Booster Alignment & Magnet Moves Kiyomi Seiya PIP
Alignment
29 Feb 2012
4068-v1 Booster SS Driver Upgrade Update Tom N Kubicki Booster
Upgrades
PIP
09 Feb 2012
4062-v1 Beam to Muon g-2 and Mu2e Experiments from Recycler Milorad B. Popovic Booster
PIP
Recycler
Linac
03 Feb 2012
4060-v2 Booster 150 KW Power Amplifier Steve Kotz Booster
PIP
HLRF
01 Feb 2012
4050-v1 Progress in the RF/Thermal Modeling Effort of the Booster Cavity Mohamed H Hassan PIP
HLRF
18 Jan 2012
4049-v1 Booster Bias Supply Upgrade Patrick G. Sheahan PIP
HLRF
18 Jan 2012
4040-v1 Booster Notching Absorber Design Vladimir Sidorov Booster
PIP
10 Jan 2012
4038-v1 Fermilab Booster Model Calibration Alexey Petrenko Booster
PIP
10 Jan 2012
4028-v2 Booster Digital Damper Status & Plans Nathan Eddy PIP
Beam Instrumentation
21 Dec 2011
4023-v1 Booster BPM, Daughter Trigger Generator Adjustments Craig C Drennan Beam Instrumentation
14 Dec 2011
4022-v1 Proton source 2012 shutdown schedule Mary Convery Booster
Linac
14 Dec 2011
4015-v1 Booster Beam Notching Overview for 2012 Salah Chaurize Booster
07 Dec 2011
4006-v1 Orbit response matrix measurements and model calibration for the Fermilab Booster Alexey Petrenko Booster
PIP
23 Nov 2011
3997-v1 Booster Cogging Upgrades Kiyomi Seiya Upgrades
16 Nov 2011
3993-v1 Booster Alignment & Magnet Moves Kiyomi Seiya PIP
Alignment
09 Nov 2011
3992-v1 Optice Measurements in the Booster Meghan J McAteer Beam Dynamics
PIP
09 Nov 2011
3989-v2 Booster Linear Coupling Measurement and comparison with MAD8 Yuri Alexahin et al. Studies
PIP
09 Nov 2011
3950-v4 Booster BLM Upgrade -- Presentation Slides Craig C Drennan Front-end Systems
ACNET
Beam Instrumentation
07 Nov 2011
3900-v3 A Muon Storage/Decay Ring at Fermilab, A Concept Milorad B. Popovic Booster
Recycler
Project X
Antiproton Source
01 Nov 2011
3974-v2 Concept: mu2e with Slow Spill from the Recycler Milorad Popovic Milorad B. Popovic Booster
Recycler
Upgrades
Project X
27 Oct 2011
3967-v1 PIP and the Booster Notch Robert M Zwaska Upgrades
12 Oct 2011
3952-v1 Spare cavity status and tuner update Matt Slabaugh Booster
PIP
28 Sep 2011
3947-v1 Booster Laser Notcher Options David E. Johnson Upgrades
PIP
20 Sep 2011
3935-v2 Proton Source Vacuum Plan David Augustine Booster
PIP
Vacuum
Linac
Vacuum
02 Sep 2011
3931-v1 Status Report on the Installation of Solid State Conversions for Booster Stations 1 & 2 Steve Kotz Booster
PIP
HLRF
31 Aug 2011
3930-v1 2012 Booster LCW Improvement Plan Overview David Hixson Booster
Operations
Upgrades
Projects
PIP
29 Aug 2011
3926-v1 Proton Improvement Plan -- Preliminary Overview of FY12 Bob Webber Booster
PIP
Linac
24 Aug 2011
3921-v1 Initial Simulations of Performance Limitations of the Booster RF Cavity Mohamed H Hassan Booster
HLRF
PIP
Electromagnetic Calculations
LLRF
10 Aug 2011
3920-v1 PIP- Booster RF -- Spare Cavity Status Matt Slabaugh Booster
PIP
HLRF
10 Aug 2011
3911-v1 TD Cost Estimate for Booster Tuners Thomas J Gardner Booster
PIP
HLRF
02 Aug 2011
3912-v1 Booster Modulator Upgrades Rene Padilla Booster
PIP
HLRF
02 Aug 2011
3913-v1 Booster Solid State Driver Upgrade Tom N Kubicki Booster
PIP
HLRF
02 Aug 2011
3903-v1 Proton Source Improvement Plan Overview Bob Webber Booster
Linac
13 Jul 2011
3899-v1 Booster Laser Profile Monitor David E. Johnson Beam Instrumentation
07 Jul 2011
3890-v1 Booster BLM and BPM upgrade Meeting Minutes, Fall 2010 Craig C Drennan Front-end Systems
Beam Instrumentation
29 Jun 2011
3878-v1 Proton Source Improvement Plan to DOE in March 2011 Stuart Henderson Booster
Linac
03 Jun 2011
3798-v1 Mountain Range Card Manual Elmie Peoples Other
Other
22 Mar 2011
3795-v1 Booster BLM Tests on BLMS06 Craig C Drennan Beam Instrumentation
17 Mar 2011
3785-v1 Measurement and Correction of Beta Functions in the Booster (Budker Seminar) Meghan J McAteer Studies
23 Feb 2011
3780-v1 Interfacing to the Booster BLM Upgrade Integrator/Digitizer VME Module Craig C Drennan Beam Instrumentation
17 Feb 2011
3768-v1 Booster RF Uptime and Performance Eric J Prebys HLRF
07 Jan 2011
3766-v1 A Statistical Study of Proton Source Down Time Dave McGinnis Booster
Spares and Maintenance
Operations
Spares and Maintenance
Operations
Projects
Projects
Linac
29 Dec 2010
3762-v2 Proton Source Workshop Wednesday 12/8/2010 Afternoon Session Robert M Zwaska Booster
Linac
28 Dec 2010
3720-v1 Proton Source December 2010 Workshop Opening Bob Webber Booster
Linac
22 Dec 2010
3751-v1 Summary of the Tuesday Afternoon Session of the Proton Source Workshop Elliott S McCrory Beam Dynamics
22 Dec 2010
3740-v2 Booster Cogging - Proton Source Improvement Workshop William A Pellico Booster
22 Dec 2010
3761-v1 Wednesday Morning Session Summary Ron Moore Booster
Linac
20 Dec 2010
3760-v1 Proton Source Workshop Tuesday 12/7/2010 Morning Session Summary Elmie Peoples Booster
Linac
20 Dec 2010
3750-v1 proton source water systems Maurice Ball Operations
08 Dec 2010
3749-v2 Proton Source Workshop RF Presentation John S Reid HLRF
08 Dec 2010
3746-v2 Booster Downtime Todd Sullivan Booster
08 Dec 2010
3736-v1 Transverse Instabilities Valeri A Lebedev Beam Dynamics
08 Dec 2010
3732-v1 Linac and Booster Radiation Shielding Status, Plans and Constraints John E Anderson Booster
ES&H
ES&H
Linac
08 Dec 2010
3737-v1 Booster Operations Todd Sullivan Operations
08 Dec 2010
3744-v1 Proton Source December 2010 Workshop Registrants Bob Webber Booster
Linac
07 Dec 2010
3734-v2 BOOSTER COLLIMATION AND SHIELDING Nikolai Mokhov Upgrades
Energy Deposition
07 Dec 2010
3743-v1 Booster Optics Measurements & Correction Yuri Alexahin Beam Dynamics
Proton Plan
07 Dec 2010
3730-v3 Linac and Booster Beam Diagnostics Craig C Drennan Beam Instrumentation
Beam Instrumentation
07 Dec 2010
3742-v1 Summary of Booster Dampers Dave McGinnis Booster
07 Dec 2010
3739-v1 Objectives of the Proton Improvement Plan Stuart Henderson Booster
Linac
07 Dec 2010
3719-v6 Proton Source December 2010 Workshop Agenda Bob Webber Booster
Linac
06 Dec 2010
3735-v1 Opening of 2010 Proton Source Workshop Bob Webber Booster
Linac
06 Dec 2010
3733-v1 Linac-Booster Beam Interface Valeri A Lebedev Beam Dynamics
Beam Dynamics
06 Dec 2010
3731-v1 Proton Source Workshop - task force report William A Pellico Booster
Linac
06 Dec 2010
3727-v2 Booster Acceptance, Apertures, and Alignment Kiyomi Seiya Alignment
06 Dec 2010
3725-v2 Booster Magnet Status James Lackey Booster
06 Dec 2010
3708-v1 Proton Source Task Force Talk - APT_Seminar William A Pellico Booster
Linac
04 Nov 2010
3693-v1 Talk at all exp. meeting on Booster correctors William A Pellico Operations
12 Oct 2010
3689-v1 Task Force Report - Directorate Meeting William A Pellico Upgrades
Upgrades
05 Oct 2010
3660-v4 Proton Source Task Force Report William A Pellico Booster
Linac
26 Aug 2010
3644-v1 Microsoft Project for Booster LLRF Upgrade Schedule and Effort Craig C Drennan LLRF
21 Jul 2010
3643-v1 Examination of BGA and LGA Connections on the Booster LLRF DDS Module Prototype Craig C Drennan LLRF
21 Jul 2010
3642-v1 Booster Wire Scanner Integrator Craig C Drennan Beam Instrumentation
20 Jul 2010
1410-v10 BLM Upgrade Users' Guide Alan Baumbaugh et al. Beam Loss Monitors (BLM)
TeV ABORT
Instrumentation
Beam Instrumentation
Beam Instrumentation
21 Jun 2010
3604-v1 Configuring the Booster LLRF System for Testing New Frequency and Phase Control Components Craig C Drennan LLRF
04 May 2010
3576-v2 Radiation Shielding Tests for Laser Power Supply David E. Johnson Project X
Beam Instrumentation
18 Mar 2010
3572-v1 Instrumentation-Systems-SDA meeting of February 9, 2010 Andreas Jansson et al. Booster
Main Injector
Tevatron
13 Mar 2010
3486-v6 Installation Planning for BPM-HRM Booster DAQ Extension Craig C Drennan Beam Instrumentation
14 Dec 2009
3513-v1 Instrumentation-Systems-SDA meeting of December 2, 2009 Denton K Morris et al. Booster
Main Injector
Tevatron
11 Dec 2009
3013-v2 Booster BPM Documentation Sharon L. Lackey Controls
BPM
Front-end Systems
Hardware
Front-end Documentation
Beam Instrumentation
26 Oct 2009
3214-v2 Booster Bunch Length Monitor Craig C Drennan Beam Instrumentation
26 Oct 2009
3368-v7 Booster Corrector Installation Data -- Shutdown 2009 Craig C Drennan Controls
Power Supplies
10 Sep 2009
3435-v1 Project X and a Muon Facility at Fermilab Milorad B. Popovic Booster
Beam Physics
Upgrades
Antiproton Source
08 Aug 2009
3425-v1 Booster LLRF Electronics Upgrade -- Electronic Design Efforts, April 2009 Craig C Drennan LLRF
21 Jul 2009
3416-v1 Alignment Tolerances for Booster Correctors Eric J Prebys Alignment
24 Jun 2009
3382-v1 TUNABLE RF CAVITIES USING ORTHOGONALLY BIASED FERRITE Chuck Ankenbrandt et al. Booster
HLRF
HLRF
06 May 2009
2762-v5 Penetrations for Corrector Cables Craig C Drennan Power Supplies
29 Apr 2009
3376-v1 Booster BPM Info and Measurement Summary James A. Fitzgerald Beam Instrumentation
27 Apr 2009
2974-v2 Mathematical Description of the Booster LLRF Controls Craig C Drennan Controls
LLRF
15 Apr 2009
2828-v4 Requirements for the Booster LLRF DDS Module Craig C Drennan et al. Hardware
LLRF
15 Apr 2009
3366-v1 Collection of Published Papers for the Booster Corrector Upgrade Craig C Drennan Booster
13 Apr 2009
3347-v1 Booster Collimation Revisited: A Beam Whacker as Primary Collimator Chuck Ankenbrandt et al. Booster
30 Mar 2009
3316-v1 The Booster Beam-Whacker Milorad B. Popovic Booster
Instrumentation
25 Feb 2009
3315-v2 Choices for Instrumenting Booster Corrector RTD's Craig C Drennan Operations
Controls
24 Feb 2009
3230-v1 Examination of the Booster Short Straight Corrector Prototype Installation Craig C Drennan Upgrades
20 Oct 2008
3205-v4 Pulse Stretcher Application For Measuring BDot Coils on Booster MP02 Current Craig C Drennan Booster
Beam Instrumentation
29 Sep 2008
3168-v1 g-2 at Fermilab Chuck Ankenbrandt et al. Booster
Recycler
Upgrades
Linac
EXP Notes
Antiproton Source
28 Jul 2008
3155-v1 Evolutionary Optimization Methods for Accelerator Design Alexei Poklonskiy Accelerator Seminar
Beam Dynamics
Beam Dynamics
Future Accelerators
09 Jul 2008
3124-v1 FNAL Accelerator Complex Status Ron Moore External Beams
Booster
Main Injector
Tevatron
Operations
Recycler
Linac
Antiproton Source
20 Jun 2008
3108-v1 Study of Possibility of Space Charge Compensation in the Fermilab Booster with Multiple Electron Columns Yuri Alexahin et al. Beam Dynamics
03 Jun 2008
622-v1 FERMILAB BOOSTER BEAM COLLIMATION AND SHIELDING Alexandr Drozhdin et al. Upgrades
Energy Deposition
02 Jun 2008
1223-v1 Commissioning of the Beam Collimation System at the Fermilab Booster. Alexandr Drozhdin et al. Beam Dynamics
02 Jun 2008
1944-v1 Fermilab Booster Dynamic Aperture Simulation with New Injection/Extraction Systems Alexandr Drozhdin Beam Dynamics
02 Jun 2008
3089-v1 Fourier Analysis of Booster February TBT data Eliana Gianfelice-Wendt Studies
06 May 2008
2803-v1 Measurement of Booster Beam Halo using the C836A and C838A Collimators in the MI8 Beamline Bruce C. Brown Beam Loss Monitors (BLM)
Proton Plan
Other
Transfer Lines
Collimation
22 Apr 2008
3063-v1 Test of New Stripping Foils in the Booster Weiren Chou et al. Operations
Project X
31 Mar 2008
3033-v1 Fourier Analysis of Booster January 2008 TBT data Eliana Gianfelice-Wendt Studies
15 Feb 2008
3024-v1 Fourier Analysis of Booster TBT data Eliana Gianfelice-Wendt Studies
06 Feb 2008
2988-v1 Impact of Electric Current Fluctuations Arising from Power Supplies on Charged-Particle Beams Phil S. Yoon Instabilities
Beam Dynamics
Power Supplies
Multiparticle
24 Jan 2008
2863-v2 Conversion Between New Booster Correctors and Old Craig C Drennan Operations
Power Supplies
02 Oct 2007
2883-v1 Booster RF Repetition Rate Limit Robert J. Ducar et al. Proton Plan
Upgrades
Projects
HLRF
26 Sep 2007
2859-v11 Booster Corrector Installation Data -- Shutdown 2007 Craig C Drennan Controls
Power Supplies
Upgrades
19 Sep 2007
1881-v5 SPECIFICATION FOR THE BOOSTER CORRECTOR MAGNETS AND POWER SUPPLIES Craig C Drennan Controls
19 Jul 2007
2792-v7 Minutes of the Booster Corrector Prototype Test Planning Meeting Craig C Drennan Upgrades
05 Jul 2007
2810-v1 On possibility to compensate space charge effects by controlled electron columns Vladimir Shiltsev Beam Dynamics
Beam Dynamics
Transverse Dynamics
SNuMi
Beam Dynamics
13 Jun 2007
2804-v1 Proton Plan Booster Corrector Upgrade -- Directors Review Aug. 2006 Craig C Drennan Upgrades
11 Jun 2007
2632-v3 Coordinate System for New Booster Corrector Magnet System Craig C Drennan et al. Beam Dynamics
Operations
Controls
Upgrades
30 May 2007
2791-v1 System Overview for the Multi-element Corrector Magnets and Controls for the Fermilab Booster. Craig C Drennan Upgrades
29 May 2007
1883-v2 Booster Floor Plan Markup for New Corrector System Craig C Drennan Power Supplies
14 May 2007
2773-v3 Booster Corrector Power Cable Installation Details Craig C Drennan Power Supplies
14 May 2007
2734-v2 Booster Long Straight Corrector Package Installation Craig C Drennan Upgrades
24 Apr 2007
2718-v1 March 27, 2007 Booster Corrector Status for DOE Review Craig C Drennan Upgrades
27 Mar 2007
2716-v1 Delivering Muons to the MuCool Test Area Chuck Ankenbrandt et al. Booster
Muon Collider
Linac
Muon Collider R&D
23 Mar 2007
2714-v1 Link to AC Measurement Slew Rate and Field Strength Data and Results Phil Schlabach Upgrades
22 Mar 2007
2713-v1 Web Link to Tech Division for Booster Corrector Thermal Studies David J. Harding Upgrades
22 Mar 2007
2712-v1 BMA000 Magnetic Measurements -- Excerpts from Oct. 2006 Tech. Review Phil Schlabach Upgrades
22 Mar 2007
2711-v1 Booster Corrector Prototype BMA000 -- Field Strength Test Results Phil Schlabach Upgrades
22 Mar 2007
2707-v1 Some Understandings on Radial Motion at Transition in the Fermilab Booster Xi Yang Booster
Longitudinal Dynamics
20 Mar 2007
2700-v1 Transformer Test Results BMA001 Craig C Drennan Operations
19 Mar 2007
2686-v1 Proposal of RF manipulation in Booster William A Pellico et al. Booster
Longitudinal Dynamics
Beam Physics
Upgrades
12 Mar 2007
2612-v1 EO introduction and plan in A0 Jinhao Ruan Beam Instrumentation
Instrumentation
08 Feb 2007
2609-v1 N.Kazarinov on Booster SC simulations Yuri Alexahin et al. Beam Dynamics
10 Jan 2007
2590-v1 Booster 3-D simulations Alexandr Drozhdin et al. Booster
Beam Dynamics
Beam Physics
16 Dec 2006
2584-v1 The Measurements and Analysis of Electromagnetic Interference arising from the Booster GMPS Weiren Chou et al. Power Supplies
Beam Instrumentation
11 Dec 2006
2548-v1 Report from Booster Corrector Review Thomas H Nicol et al. Proton Plan
Upgrades
08 Nov 2006
2520-v3 Booster Corrector Magnet -- Measurement of Mutual Inductance Craig C Drennan Beam Dynamics
20 Oct 2006
2529-v1 Reducing the momentum spread of 8-GeV Booster beams via the excitation of the bunch length oscillation (simulation results) Alexandr Drozhdin et al. Booster
Longitudinal Dynamics
Technology
18 Oct 2006
2297-v2 COHERENT INSTABILITIES AT THE FNAL BOOSTER Valeri A Lebedev Beam Dynamics
16 Oct 2006
2523-v1 Booster Beam Loss Monitor Upgrade Specification Craig C Drennan Front-end Systems
Beam Instrumentation
16 Oct 2006
2444-v3 Simulation of transition crossing in the Fermilab Booster Alexandr Drozhdin et al. Accelerator Seminar
Beam Dynamics
Longitudinal Dynamics
12 Oct 2006
2491-v1 The Understanding and Analysis of the Booster Magnet Survey Data Peter Kasper et al. Alignment
02 Oct 2006
1882-v4 New Booster Corrector Magnet Power Amplifier Controls Specification Craig C Drennan Power Supplies
16 Aug 2006
2339-v1 Prospective Gains from Gamma-t Jump and 2nd Harmonic Magnet Ramp in Fermilab Booster James A. MacLachlan Beam Dynamics
Studies
Proton Plan
Upgrades
Projects
11 Jul 2006
1783-v3 Proton Source Scaling Laws Dave McGinnis Proton Plan
Projects
SNuMi
13 May 2006
2240-v1 Rep. Rate and Beam Quality Issues for the Booster in the SNuMI Era Eric J Prebys Upgrades
SNuMi
17 Apr 2006
2178-v2 First Report of the Proton Study Group Sergei Nagaitsev et al. Operations
Other
General
Upgrades
SY120
03 Apr 2006
2221-v1 Proposed Booster bpm geometry James L. Crisp BPM
Upgrades
Beam Instrumentation
03 Apr 2006
2112-v2 Optimum Booster ORBUMP Magnet Configuration Eric J Prebys Upgrades
01 Feb 2006
2085-v1 Calibration of the Booster BPM System Bob Webber BPM
BPM
Beam Instrumentation
28 Dec 2005
2045-v1 Booster Cogging Robert M Zwaska Extraction Lattice
LLRF
08 Dec 2005
2030-v1 A Quick Look at MI BPM Data Robert K Kutschke Beam Dynamics
BPM
23 Nov 2005
2000-v1 BLM System Control Bus Testing Kelly L Knickerbocker Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
Beam Instrumentation
31 Oct 2005
1994-v1 BLM VME J2 Backplane Impedance Kelly L Knickerbocker Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
Beam Instrumentation
31 Oct 2005
1992-v1 Proton Intensity Improvements for MINOS Dave McGinnis Upgrades
Accumulator
Stochastic Cooling
Alignment
14 Oct 2005
1980-v1 Phase Space and Antiproton Production at Fermilab Dave McGinnis Beam Dynamics
Beam Dynamics
Debuncher
Accumulator
Beam Dynamics
04 Oct 2005
1900-v1 Report to the Fermilab Director by the Proton Committee Chuck Ankenbrandt et al. Operations
General
Upgrades
MiniBooNE
18 Jul 2005
1868-v1 A Proposed Extraction System for the Fermilab Booster Chuck Ankenbrandt et al. Extraction Lattice
10 Jun 2005
1847-v2 Booster Cogging at PAC 05 Sacha E. Kopp et al. LLRF
27 May 2005
1817-v1 Status of the Proton Plan Eric J Prebys Operations
Upgrades
11 May 2005
1784-v1 A Proposed H- Injection System for the Fermilab Booster Milorad B. Popovic Other
20 Apr 2005
1736-v1 BLM VME J2 Backplane Crosstalk Evaluation Kelly L Knickerbocker Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
Beam Instrumentation
16 Mar 2005
1564-v1 Longitudinal Effects in the Fermilab Booster Chuck Ankenbrandt et al. Studies
18 Feb 2005
1573-v1 Multipole fields in Booster extraction septum MP02 Ming-jen Yang Extraction Lattice
Transfer Lines
11 Feb 2005
1569-v1 Tevatron BLM VME J2 Backplane Specification Document Kelly L Knickerbocker Beam Loss Monitors (BLM)
TeV ABORT
Instrumentation
Beam Instrumentation
Beam Instrumentation
10 Feb 2005
1455-v1 GMPS Current Regulator ACNET Parameters Alex Waller et al. Power Supplies
Front-end Systems
Power Supplies
15 Nov 2004
1441-v1 The Proton Plan Bruce Baller et al. Project
Upgrades
Projects
RF
11 Nov 2004
1430-v2 Booster Corrector System Specification David J. Harding et al. Controls
Upgrades
Projects
05 Nov 2004
1428-v1 Run 2 Operational Status and Plans for FY05 Dave McGinnis Operations
Operations
Operations
Operations
Operations
01 Nov 2004
1295-v1 Combined ESME-ORBIT Space-Charge Simulation for the Booster Phil S. Yoon Beam Dynamics
Beam Dynamics
Longitudinal Dynamics
Transverse Dynamics
06 Aug 2004
1277-v1 Booster Cogging: Synchronization with the Main Injector for NuMI & Slip-Stacking Robert M Zwaska Commissioning
Commissioning
LLRF
LLRF
29 Jul 2004
1266-v1 GMPS VXI Regulator Documentation Bob Webber Power Supplies
Power Supplies
20 Jul 2004
1241-v1 Synchronization of the Fermilab Booster and Main Injector for Multiple Sacha E. Kopp et al. LLRF
Projects
LLRF
01 Jul 2004
1220-v1 Booster Collimator System Dean A. Still et al. Other
29 Jun 2004
930-v1 The Booster Monitor Program at Fermilab: Data Retrieval and Analysis Chandra CLJ Jacobs Controls
Java Data Acquisition
Beam Instrumentation
04 Dec 2003
918-v1 Talks given at NBI2003 in KEK by Bob Zwaska Robert M Zwaska Commissioning
Monitoring Instrumentation
Commissioning
Primary Proton Beam
Upgrades
Extraction from Main Injector
Dampers
18 Nov 2003
909-v1 Booster LLRF VCO DSP Program Info Bob Webber LLRF
LLRF
12 Nov 2003
879-v1 Measurement of the Electron Loss Cross Sections for Negative Hydrogen Ions on Carbon at 200 MeV Carlos F Hojvat et al. Beam Dynamics
Operations
Other
20 Oct 2003
859-v1 Booster cogging for multiple batch operation of the Main Injector William A Pellico et al. Commissioning
Studies
Primary Proton Beam
Project
Projects
LLRF
02 Oct 2003
767-v1 LabVIEW VI Upgrades on the IPM Systems at Fermilab Thomas Spears Beam Instrumentation
Ion Profile Monitor
Beam Instrumentation
Beam Instrumentation
08 Aug 2003
740-v1 Instrumentation Breakout for DOE Run II Review July 2003 Keith E Gollwitzer et al. Talks
Beam Instrumentation
BPM
Beam Instrumentation
Instrumentation
Beam Instrumentation
ACNET
Electron Cooling
Beam Instrumentation
23 Jul 2003
695-v1 Controls Java Tutorial - Overview Jim Patrick Controls
Console Applications
Java Appl Framework
Java Data Acquisition
03 Jul 2003
651-v1 Booster Monitor User Instructions and Design Gerald M Guglielmo Operations
04 Jun 2003
634-v1 A New Kind of Beam Pipe for Rapid Cycling Proton Synchrotrons Alex Chen et al. Future Accelerators
Vacuum
Upgrades
Vacuum
28 May 2003
632-v1 Fermilab Booster Modeling and Space Charge Study Weiren Chou et al. Beam Dynamics
Studies
Ion Profile Monitor
Upgrades
Multiparticle
28 May 2003
630-v1 An 8-GeV Synchrotron-Based Proton Driver Weiren Chou Future Accelerators
Upgrades
Upgrades
28 May 2003
619-v1 Synergia project review talk part III: FNAL Booster Modeling and Data Comparisons James F. Amundson et al. Beam Dynamics
27 May 2003
617-v1 Committee Charge and Project Abstract for Booster Simulations Review Pushpalatha C. Bhat Other
27 May 2003
581-v1 Booster beam profiles (IPM) and losses before and after dogleg and ORBUMP changes James F. Amundson et al. Beam Dynamics
30 Apr 2003
516-v1 Proton Source Department Meeting, March 12, 2003 Elliott S McCrory Operations
Operations
20 Mar 2003
515-v1 Proton Economics Elliott S McCrory Operations
Operations
20 Mar 2003
506-v2 Booster Dogleg Studies (Run II Meeting) Eric J Prebys Studies
Run II
13 Mar 2003
499-v1 Synergia: a hybrid, parallel 3D space charge code with circular machine modeling capabilities James F. Amundson et al. Other
11 Mar 2003
498-v1 Space charge studies and comparison with simulations using the FNAL Booster James F. Amundson et al. Studies
11 Mar 2003
497-v1 Synergia Update 03/06/03 James F. Amundson et al. Beam Dynamics
11 Mar 2003
496-v1 Booster tune shift study due to space charge effects, using resonance scans. James F. Amundson et al. Studies
11 Mar 2003
432-v1 Proton Source Talk to AAC, February 2003 Elliott S McCrory Operations
25 Feb 2003
470-v1 Proton Source Dept Meeting: Using the BD Docs Database Elliott S McCrory Other
25 Feb 2003
462-v1 Focusing Properties of The Booster Extraction Septa Bruce C. Brown et al. Magnets
Extraction Lattice
Transfer Lines
21 Feb 2003
307-v2 Shielding Assessment of F0 to Switchyard Beam Line Enclosure for MI 120 GeV Beam Transport Chandrashekhara M. Bhat Beam Dynamics
ES&H
Transfer Lines
16 Sep 1997
306-v1 Can Magnetic Fields Assist in Radiation Shielding for 8 GeV Proton Beams Bruce C. Brown ES&H
ES&H
Energy Deposition
15 Aug 1997
1148-v4 FERMILAB COORDINATE SYSTEMS Babatunde Oshinowo Alignment
Alignment
Alignment
Alignment
Alignment
Alignment
Alignment
15 May 1997

Number of documents found: 353

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 3 wallclock secs ( 0.81 usr + 0.21 sys = 1.02 CPU)