6811-v4 |
AD/Instrumentation Status Meeting Minutes and Slides |
Craig C Drennan |
PXIE
Beam Instrumentation
Beam Instrumentation
FAST
Beamline
Beam Instrumentation
Beam Instrumentation
Monitoring Instrumentation
IOTA
Instrumentation
|
10 Jul 2019 |
4632-v2 |
Recommissioning Linac Bunche Length Detector BLD-03 |
Elliott S McCrory et al. |
Beam Instrumentation
Instrumentation
|
11 Jul 2014 |
4420-v1 |
Linac Bunch Length Detector Pictures |
Elliott S McCrory |
Beam Instrumentation
|
01 Aug 2013 |
4308-v1 |
Linac BPM Status Update |
Elliott S McCrory |
Beam Instrumentation
Beam Instrumentation
Console Applications
BPM
PIP
|
06 Mar 2013 |
4283-v1 |
Linac BPM Commissioning Notes |
Elliott S McCrory |
Beam Instrumentation
Front-end Systems
Beam Instrumentation
BPM
|
31 Jan 2013 |
4276-v1 |
Applications for Linac BPMs |
Elliott S McCrory |
Beam Instrumentation
Java Appl Framework
Beam Instrumentation
BPM
|
29 Jan 2013 |
4264-v3 |
Scaling factors for the Linac BPMs |
Matthew H Gardner et al. |
Beam Instrumentation
Data Loggers
Upgrades
BPM
|
23 Jan 2013 |
4232-v2 |
Linac BPM upgrade 805MHz phase signal system |
Elliott S McCrory |
Beam Instrumentation
BPM
PIP
|
06 Dec 2012 |
4192-v1 |
Linac 400 MeV BPM Status |
Nathan Eddy |
Beam Instrumentation
PIP
|
08 Aug 2012 |
3889-v3 |
Linac Beam Velocity Measurement |
Craig C Drennan |
Operations
Beam Instrumentation
Operations
Front-end Systems
Controls
Beam Instrumentation
|
24 Jul 2012 |
3940-v1 |
Linac Toroid Upgrade Meeting Summaries -- Sept, 2, 2011 -- Oct. 27, 2011 |
Craig C Drennan |
Beam Instrumentation
Front-end Systems
Intensity Measurements
|
16 Jul 2012 |
4155-v1 |
PIP - Linac: BPM Readout Upgrade - Status Report |
Nathan Eddy |
Beam Instrumentation
Linac
Upgrades
|
12 Jun 2012 |
4101-v1 |
Linac 400MeV Steer program |
Kyle J Hazelwood |
Operations
Controls
Operations
Beam Instrumentation
Console Applications
|
27 Mar 2012 |
3770-v2 |
Meeting Minutes: Linac and 400 MeV Beam Position Monitor Upgrade |
Craig C Drennan et al. |
Beam Instrumentation
|
23 Nov 2011 |
3948-v2 |
Toroid Requirements in the Linac |
Craig C Drennan et al. |
Beam Instrumentation
|
20 Sep 2011 |
3801-v4 |
Beam Position Monitor Requirements in the Linac and 400 MeV Line |
Craig C Drennan |
Beam Instrumentation
Upgrades
|
12 Sep 2011 |
3767-v1 |
Meeting Minutes: Linac Multi-Wires in the Momentum Dump Line |
Craig C Drennan |
Studies
Operations
Beam Instrumentation
Linac
Upgrades
|
05 Jan 2011 |
3730-v3 |
Linac and Booster Beam Diagnostics |
Craig C Drennan |
Beam Instrumentation
Beam Instrumentation
|
07 Dec 2010 |
3396-v1 |
Report: Temporal jitter studies at the A0 photoinjector |
Timothy J Maxwell et al. |
Beam Instrumentation
|
18 May 2009 |
3343-v1 |
HINS Beam Dynamics & Diagnostics Mini-Workshop |
Jean-Paul Carneiro et al. |
Beam Instrumentation
Future Accelerators
Linac
Beam Dynamics
Instrumentation
Adv. Accelerator R&D
|
20 Mar 2009 |
2212-v2 |
Tank 1 Emittance Probes configuration and angular resolution |
Doug Moehs |
Beam Instrumentation
|
03 Apr 2006 |
2213-v2 |
H Minus Pre-accelerator Emittance Probes_angular resolution |
Doug Moehs |
Pre-Accelerator
Beam Instrumentation
|
03 Apr 2006 |
740-v1 |
Instrumentation Breakout for DOE Run II Review July 2003 |
Keith E Gollwitzer et al. |
Beam Instrumentation
Beam Instrumentation
ACNET
Beam Instrumentation
Instrumentation
Beam Instrumentation
Talks
Electron Cooling
BPM
|
23 Jul 2003 |