Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Upgrades (subtopic of Linac) are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
5322-v6 Sequenced Chassis Control Card, Linac Marx Modulator System Craig C Drennan et al. Upgrades
01 Mar 2017
4893-v1 PIP Status Report Meeting Trevor A Butler et al. Upgrades
PIP
22 Jul 2015
4774-v1 PIP Status Report Meeting Trevor A Butler et al. Linac
Upgrades
PIP
25 Feb 2015
4711-v1 Laser Notcher Pulse Energy Requirements & Demonstration Experiment David E. Johnson et al. Upgrades
PIP
19 Nov 2014
4693-v1 PIP Status Report Meeting Trevor A Butler et al. Linac
Upgrades
PIP
29 Oct 2014
4662-v1 Superconducting Linac in Fermilab Paul Derwent et al. Accelerator Seminar
Linac
Upgrades
26 Aug 2014
4661-v2 PIP Shutdown Meeting - Laser Notcher Status David E. Johnson Booster
Upgrades
20 Aug 2014
4649-v5 PIP Linac Notcher - September Readiness Review Jean-Paul Carneiro et al. Upgrades
PIP
13 Aug 2014
3646-v16 A 750keV LINAC INJECTOR UPGRADE PLAN William A Pellico et al. Upgrades
11 Dec 2013
4441-v1 Laser Notcher Status 9_11_2013 David E. Johnson et al. Upgrades
11 Sep 2013
4363-v2 Plans for Booster & Linac Transformer Installation Ryan Crawford Linac
Booster
Upgrades
Upgrades
PIP
08 May 2013
4334-v1 Linac Modulator Upgrade Trevor A Butler Linac
Upgrades
PIP
03 Apr 2013
4264-v3 Scaling factors for the Linac BPMs Matthew H Gardner et al. Beam Instrumentation
Data Loggers
Upgrades
BPM
23 Jan 2013
4228-v1 Linac MCC/Transformer, Hatch, Booster Transformers, Anode Supply Ryan Crawford Linac
Booster
Upgrades
Upgrades
PIP
25 Sep 2012
4210-v1 RFQ PA Systems Brian Schupbach Pre-Accelerator
Upgrades
PIP
30 Aug 2012
4195-v1 Linac Substation L1 & Booster Substation Y-BE2 --- Update #3 Ryan Crawford Linac
Booster
Upgrades
Upgrades
PIP
15 Aug 2012
4155-v1 PIP - Linac: BPM Readout Upgrade - Status Report Nathan Eddy Beam Instrumentation
Linac
Upgrades
12 Jun 2012
4097-v1 PIP - Linac: 200MHz Modulator Upgrade - Status Report Trevor A Butler Linac
Upgrades
PIP
21 Mar 2012
4096-v1 PIP - Linac: Substation L1 & MCC Upgrade Ryan Crawford Linac
Upgrades
PIP
20 Mar 2012
4007-v3 Linac L1 Substation Upgrade Steven L. Hays Upgrades
PIP
23 Nov 2011
3985-v1 PIP - Linac:7835 Procurement Strategy Fernanda G Garcia Operations
Linac
Projects
Upgrades
PIP
02 Nov 2011
3801-v4 Beam Position Monitor Requirements in the Linac and 400 MeV Line Craig C Drennan Beam Instrumentation
Upgrades
12 Sep 2011
3936-v1 Linac/400 MeV BPM System Plans and Status Nathan Eddy Upgrades
BPM
BPM
PIP
07 Sep 2011
3767-v1 Meeting Minutes: Linac Multi-Wires in the Momentum Dump Line Craig C Drennan Studies
Operations
Beam Instrumentation
Linac
Upgrades
05 Jan 2011
3689-v1 Task Force Report - Directorate Meeting William A Pellico Upgrades
Upgrades
05 Oct 2010
3549-v1 Linac Briefing to the Directorate - August 2002 Bob Webber Pre-Accelerator
Operations
Linac
Spares and Maintenance
Upgrades
11 Feb 2010
3269-v1 A 750 keV RFQ for the Fermilab Linac Milorad B. Popovic Pre-Accelerator
Linac
Upgrades
17 Dec 2008
1471-v2 The Fermilab Linac Upgrade Project Elliott S McCrory Upgrades
29 Nov 2004
1138-v1 A Simple Beam Line for the MuCool Test Area Chuck Ankenbrandt Future Accelerators
Upgrades
Adv. Accelerator R&D
22 Apr 2004
1137-v1 A Simple Beam Line for the MuCool Test Area Chuck Ankenbrandt Upgrades
22 Apr 2004
921-v1 Linac Upgrade Scenarios 2003 Elliott S McCrory Upgrades
21 Nov 2003
630-v1 An 8-GeV Synchrotron-Based Proton Driver Weiren Chou Future Accelerators
Upgrades
Upgrades
28 May 2003

Number of documents found: 32

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.31 usr + 0.05 sys = 0.36 CPU)