These documents on HLRF (subtopic of Booster) are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
5717-v1 2nd Harmonic RF for the Bunch Rotation in the Fermilab Booster Chandrashekhara M. Bhat HLRF
Beam Physics
24 Jul 2017
5362-v2 Booster RF Voltage by Synchrotron Frequency Measurements at Extraction Chandrashekhara M. Bhat et al. Studies
Booster
HLRF
Beam Physics
12 Apr 2017
5350-v4 Y567b Power Amplifier Tests at 76 and 106 MHz Robyn L Madrak et al. HLRF
Upgrades
PIP
22 Mar 2017
5294-v1 PIP New Tuners Summary Report Patrick G. Sheahan et al. HLRF
PIP
14 Dec 2016
4790-v1 Early Beam Injection in the Fermilab Booster & its Implementation Plan Chandrashekhara M. Bhat Beam Dynamics
LLRF
Operations
Studies
HLRF
Upgrades
12 May 2015
4763-v1 PIP Status Report Meeting Tom N Kubicki et al. Booster
HLRF
PIP
13 Feb 2015
4718-v1 PIP Status Report Meeting Ken Domann et al. HLRF
PIP
25 Nov 2014
4620-v1 PIP Status Report Meeting William A Pellico et al. Booster
HLRF
PIP
20 Jun 2014
4479-v1 Preliminary consideration of perpendicularly biased Booster cavity Gennady Romanov HLRF
PIP
07 Nov 2013
4443-v1 Booster Cavity: Parametric Study Mohamed H Hassan et al. Booster
HLRF
PIP
16 Sep 2013
4312-v1 Booster Ferrite Bias Supply Upgrade Patrick G. Sheahan Booster
HLRF
Upgrades
PIP
13 Mar 2013
4266-v1 Refurbished Booster RF John S Reid Booster
HLRF
Upgrades
PIP
21 Dec 2012
4241-v1 Refurbished Booster RF John S Reid HLRF
PIP
24 Oct 2012
4235-v1 Booster 150 KW Power Amplifier - Status Update Steve Kotz HLRF
03 Oct 2012
4203-v1 PIP Booster RF Mudulators Status Update Rene Padilla HLRF
22 Aug 2012
4197-v1 New Ferrite Testing for Booster Tuners Dennis Barak et al. HLRF
PIP
15 Aug 2012
4180-v1 Second Refurbished Booster RF Cavity for 15Hz John S Reid HLRF
PIP
18 Jul 2012
4179-v1 Booster Bias Supply & Test Stand Patrick G. Sheahan Power Supplies
HLRF
PIP
18 Jul 2012
4084-v1 First Refurbished Booster RF Cavity for 15Hz John S Reid Booster
HLRF
PIP
07 Mar 2012
4082-v1 PIP - Booster RF Tuner and cavity Refurbishment Matt Slabaugh Booster
HLRF
PIP
07 Mar 2012
4060-v2 Booster 150 KW Power Amplifier Steve Kotz Booster
HLRF
PIP
01 Feb 2012
4050-v1 Progress in the RF/Thermal Modeling Effort of the Booster Cavity Mohamed H Hassan HLRF
PIP
18 Jan 2012
4049-v1 Booster Bias Supply Upgrade Patrick G. Sheahan HLRF
PIP
18 Jan 2012
3931-v1 Status Report on the Installation of Solid State Conversions for Booster Stations 1 & 2 Steve Kotz Booster
HLRF
PIP
31 Aug 2011
3920-v1 PIP- Booster RF -- Spare Cavity Status Matt Slabaugh Booster
HLRF
PIP
10 Aug 2011
3911-v1 TD Cost Estimate for Booster Tuners Thomas J Gardner Booster
HLRF
PIP
02 Aug 2011
3912-v1 Booster Modulator Upgrades Rene Padilla Booster
HLRF
PIP
02 Aug 2011
3913-v1 Booster Solid State Driver Upgrade Tom N Kubicki Booster
HLRF
PIP
02 Aug 2011
3768-v1 Booster RF Uptime and Performance Eric J Prebys HLRF
07 Jan 2011
3749-v2 Proton Source Workshop RF Presentation John S Reid HLRF
08 Dec 2010
3382-v1 TUNABLE RF CAVITIES USING ORTHOGONALLY BIASED FERRITE Chuck Ankenbrandt et al. Booster
HLRF
HLRF
06 May 2009
2883-v1 Booster RF Repetition Rate Limit Robert J. Ducar et al. Proton Plan
HLRF
Upgrades
Projects
26 Sep 2007

Number of documents found: 32

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.19 usr + 0.03 sys = 0.22 CPU)