Beams-doc-# Title Author(s) Topic(s) Last Updated
3891-v13 VME-DDS Frequency and Phase Control Module Craig C Drennan LLRF
03 Oct 2017
5804-v1 LLRF Controls Settings Craig C Drennan LLRF
01 Sep 2017
5344-v6 Booster Vrf by fsy Measurements at Injection Energy (400 MeV on a DC-Mode) Chandrashekhara M. Bhat LLRF
Beam Physics
HLRF
22 Mar 2017
5334-v1 Collection of Booster Synchronization Documents Craig C Drennan LLRF
03 Mar 2017
5307-v4 New Booster LLRF DDS -- ACNET Parameters and Curve Application Notes Craig C Drennan et al. LLRF
28 Feb 2017
5273-v1 Booster Acceleration Phase Lock Controller Craig C Drennan LLRF
Operations
15 Nov 2016
4411-v7 Booster LLRF System Block Diagram Craig C Drennan LLRF
14 Nov 2016
4964-v2 Cogging Test Switch Craig C Drennan LLRF
23 Jun 2016
5166-v1 VME DDS Frequency Curves Craig C Drennan LLRF
25 May 2016
5150-v1 Phase Changes to A RF and B RF at Transition Craig C Drennan LLRF
04 May 2016
4459-v2 Booster Paraphase Curve Generator VXI Module Craig C Drennan LLRF
17 Feb 2016
4781-v2 Booster to Main Injector Phase-Lock Controller Craig C Drennan LLRF
16 Nov 2015
4936-v1 Early Injection studies -- Frequency Trigger OR'ing Module Craig C Drennan LLRF
28 Aug 2015
4935-v1 Acceleration Gate Module Craig C Drennan LLRF
28 Aug 2015
4884-v1 Data Transfer Protocol for the USB to FIFO Interface Craig C Drennan et al. LLRF
13 Jul 2015
4827-v5 XFR Modification to Resetting Beam Sync (AA) and Offset Beam Sync (OAA) Craig C Drennan RF
LLRF
LLRF
Operations
LLRF
RF
05 Jun 2015
4790-v1 Early Beam Injection in the Fermilab Booster & its Implementation Plan Chandrashekhara M. Bhat Beam Dynamics
LLRF
Operations
Studies
HLRF
Upgrades
12 May 2015
4414-v5 Booster Longitudinal Damper System Block Diagram -- Draft for Review Craig C Drennan Beam Dynamics
LLRF
03 Mar 2014
4492-v1 PIP General Info Ken Domann et al. Beam Dynamics
LLRF
PIP
04 Dec 2013
4413-v1 Booster LLRF VXI DSP Module 2013 Craig C Drennan LLRF
15 Jul 2013
4153-v5 Booster Main Injector Phase Lock Divide-By-32 Phase Error Trajectory Method Craig C Drennan LLRF
18 Jun 2013
4198-v1 Booster Cogging Teststand Progress -- PIP Presentation Craig C Drennan et al. LLRF
Upgrades
PIP
20 Aug 2012
3367-v1 Characterization of the Fast Phase Detector in the Booster LLRF System Craig C Drennan LLRF
Operations
Controls
24 Jul 2012
3922-v2 Booster Dual Phase Detector Module for MI Phase Lock Control Craig C Drennan LLRF
17 Jul 2012
4131-v1 MI and Recycler Injection in the NOvA Era Ioanis Kourbanis LLRF
LLRF
LLRF
17 May 2012
4103-v1 PIP Presentation on Booster Main Injector Phase Lock Craig C Drennan LLRF
PIP
28 Mar 2012
3921-v1 Initial Simulations of Performance Limitations of the Booster RF Cavity Mohamed H Hassan Electromagnetic Calculations
LLRF
Booster
HLRF
PIP
10 Aug 2011
3644-v1 Microsoft Project for Booster LLRF Upgrade Schedule and Effort Craig C Drennan LLRF
21 Jul 2010
3643-v1 Examination of BGA and LGA Connections on the Booster LLRF DDS Module Prototype Craig C Drennan LLRF
21 Jul 2010
3604-v1 Configuring the Booster LLRF System for Testing New Frequency and Phase Control Components Craig C Drennan LLRF
04 May 2010
3425-v1 Booster LLRF Electronics Upgrade -- Electronic Design Efforts, April 2009 Craig C Drennan LLRF
21 Jul 2009
2974-v2 Mathematical Description of the Booster LLRF Controls Craig C Drennan LLRF
Controls
15 Apr 2009
2828-v4 Requirements for the Booster LLRF DDS Module Craig C Drennan et al. Hardware
LLRF
15 Apr 2009
2045-v1 Booster Cogging Robert M Zwaska LLRF
Extraction Lattice
08 Dec 2005
1847-v2 Booster Cogging at PAC 05 Sacha E. Kopp et al. LLRF
27 May 2005
1277-v1 Booster Cogging: Synchronization with the Main Injector for NuMI & Slip-Stacking Robert M Zwaska LLRF
LLRF
Commissioning
Commissioning
29 Jul 2004
1241-v1 Synchronization of the Fermilab Booster and Main Injector for Multiple Sacha E. Kopp et al. LLRF
LLRF
Projects
01 Jul 2004
909-v1 Booster LLRF VCO DSP Program Info Bob Webber LLRF
LLRF
12 Nov 2003
859-v1 Booster cogging for multiple batch operation of the Main Injector William A Pellico et al. LLRF
Commissioning
Project
Studies
Primary Proton Beam
Projects
02 Oct 2003

Number of documents found: 39

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.19 usr + 0.05 sys = 0.24 CPU)