Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Operations (subtopic of Booster) are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
5273-v1 Booster Acceleration Phase Lock Controller Craig C Drennan LLRF
Operations
15 Nov 2016
5058-v3 An Update on Early Injection Capture in the Booster Chandrashekhara M. Bhat Operations
PIP
01 Feb 2016
4827-v5 XFR Modification to Resetting Beam Sync (AA) and Offset Beam Sync (OAA) Craig C Drennan RF
LLRF
LLRF
Operations
LLRF
RF
05 Jun 2015
4790-v1 Early Beam Injection in the Fermilab Booster & its Implementation Plan Chandrashekhara M. Bhat Beam Dynamics
LLRF
Operations
Studies
HLRF
Upgrades
12 May 2015
4568-v1 A Look at The Longitudinal Beam Dynamics of the Booster Beam: Experiment and Simulations Chandrashekhara M. Bhat et al. Beam Dynamics
Operations
Booster
Upgrades
09 Apr 2014
4546-v2 Beam Energy Spread in the Booster at Injection Chandrashekhara M. Bhat et al. Beam Dynamics
Operations
Upgrades
Projects
19 Feb 2014
4367-v1 Booster Cogging Teststand Notes Craig C Drennan et al. Operations
10 May 2013
3723-v13 Booster Beam Loss Monitor Integrator and Data Acquisition Upgrade Craig C Drennan Front-end Services
Operations
Beam Instrumentation
17 Apr 2013
4229-v2 Progress Update - 2012 Booster LCW Improvement Plan David Hixson Operations
Upgrades
PIP
26 Sep 2012
3367-v1 Characterization of the Fast Phase Detector in the Booster LLRF System Craig C Drennan LLRF
Operations
Controls
24 Jul 2012
3889-v3 Linac Beam Velocity Measurement Craig C Drennan Operations
Beam Instrumentation
Operations
Front-end Systems
Controls
Beam Instrumentation
24 Jul 2012
4106-v1 L13 Notched Beam Absorber Update Salah Chaurize Operations
Booster
Upgrades
PIP
05 Apr 2012
3930-v1 2012 Booster LCW Improvement Plan Overview David Hixson Operations
Booster
Upgrades
Projects
PIP
29 Aug 2011
3766-v1 A Statistical Study of Proton Source Down Time Dave McGinnis Spares and Maintenance
Operations
Operations
Linac
Spares and Maintenance
Booster
Projects
Projects
29 Dec 2010
3750-v1 proton source water systems Maurice Ball Operations
08 Dec 2010
3737-v1 Booster Operations Todd Sullivan Operations
08 Dec 2010
3693-v1 Talk at all exp. meeting on Booster correctors William A Pellico Operations
12 Oct 2010
3315-v2 Choices for Instrumenting Booster Corrector RTD's Craig C Drennan Operations
Controls
24 Feb 2009
3063-v1 Test of New Stripping Foils in the Booster Weiren Chou et al. Project X
Operations
31 Mar 2008
2863-v2 Conversion Between New Booster Correctors and Old Craig C Drennan Power Supplies
Operations
02 Oct 2007
2632-v3 Coordinate System for New Booster Corrector Magnet System Craig C Drennan et al. Beam Dynamics
Operations
Controls
Upgrades
30 May 2007
2700-v1 Transformer Test Results BMA001 Craig C Drennan Operations
19 Mar 2007
1900-v1 Report to the Fermilab Director by the Proton Committee Chuck Ankenbrandt et al. MiniBooNE
General
Operations
Upgrades
18 Jul 2005
1817-v1 Status of the Proton Plan Eric J Prebys Operations
Upgrades
11 May 2005
1428-v1 Run 2 Operational Status and Plans for FY05 Dave McGinnis Operations
Operations
Operations
Operations
Operations
01 Nov 2004
879-v1 Measurement of the Electron Loss Cross Sections for Negative Hydrogen Ions on Carbon at 200 MeV Carlos F Hojvat et al. Beam Dynamics
Other
Operations
20 Oct 2003
651-v1 Booster Monitor User Instructions and Design Gerald M Guglielmo Operations
04 Jun 2003
516-v1 Proton Source Department Meeting, March 12, 2003 Elliott S McCrory Operations
Operations
20 Mar 2003
515-v1 Proton Economics Elliott S McCrory Operations
Operations
20 Mar 2003
432-v1 Proton Source Talk to AAC, February 2003 Elliott S McCrory Operations
25 Feb 2003

Number of documents found: 30

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.25 usr + 0.04 sys = 0.29 CPU)