3045-v6 |
Gap Cleaning in the MI using RF Barrier |
Weiren Chou et al. |
Operations
Extraction
HLRF
HLRF
|
29 Feb 2008 |
2317-v4 |
Main Injector HLRF Anode Limit Program & Cavity Tuner RF Voltage Limit |
Tim G. Berenc et al. |
RF
HLRF
Proton Plan
|
14 Sep 2006 |
2331-v1 |
Main Injector HLRF Measurements for Proton Plan |
Tim G. Berenc |
RF
HLRF
Proton Plan
|
07 Jul 2006 |
2311-v2 |
Main Injector RF Power Calculations for the Proton Plan |
Tim G. Berenc et al. |
RF
HLRF
Proton Plan
|
30 Jun 2006 |
2253-v5 |
Main Injector RF Requirements for a 1.3 Megawatt 120 GeV Proton Source |
Dave McGinnis |
HLRF
SNuMi
|
13 May 2006 |
841-v7 |
Pbar acceleration in MI using 2.5 MHz and 53 MHz rf Systems |
Chandrashekhara M. Bhat et al. |
RF
Controls
HLRF
Studies
LLRF
Longitudinal Dynamics
HLRF
Beam Dynamics
|
07 Nov 2005 |
864-v3 |
Pbar acceleration in the MI using 2.5 MHz and 53 MHz rf Systems |
Chandrashekhara M. Bhat et al. |
Operations
HLRF
Studies
Project
LLRF
|
09 Oct 2003 |
749-v3 |
Installation of the New TRIG 1 and TRIG 2 Pulse Distribution System for the MI-60 Gallery |
Tom N Kubicki |
HLRF
|
29 Jul 2003 |
573-v1 |
Beam Loading Compensation - RF Station Feedback Gain Measurement |
Joseph E. Dey |
HLRF
|
29 Apr 2003 |
19-v2 |
RF Intensity Limitations in the Main Injector |
James E. Griffin |
RF
HLRF
|
18 Aug 1989 |