Document List by Topic
[
Fermilab at Work
] [
Accelerator Division
] [
Beams DocDB
] [
LARP
] [
LARP DocDB
] [
ProgDev DocDB
]
[
DocDB Home
] [
Search
] [
Last 20 Days
] [
List Authors
] [
List Topics
]
These documents on
Neutrinos at the Main Injector Long baseline neutrino beam
and sub-topics are available:
Beams-doc-#
Title
Author(s)
Topic(s)
Last Updated
3330-v26
List of NuMI Upgrades Meetings and Reviews
Michael A. Martens
NuMI
04 Nov 2009
3420-v1
HINS MS6 East regulator Installation
Maurice Ball
Proton Driver
General
Water
09 Jul 2009
3262-v2
Ground Motion Studies At fermilab
James T. Volk
NuMI
HLRF
ILCTA
16 Jan 2009
3159-v1
Delivering High Intensity Proton Beam; Lessons for the Next Beam Generations
Samuel R. Childress
NuMI
Primary Proton Beam
15 Jul 2008
2844-v1
Radiological Issues of NuMI with a 2.3 MW Beam
Kamran Vaziri
Radiation Safety
31 Jul 2007
2687-v1
MINU -- Main Injector Neutrino Upgrades Infrastructure
Dixon Bogert
Civil Construction
14 Mar 2007
2678-v1
Delivering Protons to the Antiproton Source after the Tevatron Collider Era
Chuck Ankenbrandt
et al.
NuMI
Recycler
Future Accelerators
Antiproton Source
Main Injector
06 Mar 2007
2610-v1
PP2-->NoVA: what does it mean for us
Robert M Zwaska
General
10 Jan 2007
2439-v1
NuMI and Rapid Transfer BPM Test Application Program Specifications
Duane C Voy
Monitoring Instrumentation
BPM
06 Sep 2006
2393-v1
Fermilab Proton Projections for Long-Baseline Neutrino Beams
Robert M Zwaska
SNuMi
Proton Plan
General
16 Aug 2006
2390-v1
The NuMI Beam System: First Year of Operation
Samuel R. Childress
Target Hall Systems
Extraction from Main Injector
Primary Proton Beam
14 Aug 2006
2178-v2
First Report of the Proton Study Group
Sergei Nagaitsev
et al.
Operations
Upgrades
SY120
Other
General
03 Apr 2006
1813-v1
A First Look at NuMI Intensity Measuring Device Calibration
Daniel D Cherdack
Monitoring Instrumentation
DCCTs
14 Dec 2005
2039-v1
Tritium Production in the Dolomitic Rock Adjacent to NuMI Beam Tunnels
Samuel R. Childress
et al.
Radiation Safety
05 Dec 2005
1989-v1
The NuMI Beam System:Commissioning & Initial Operation
Samuel R. Childress
Commissioning
Primary Proton Beam
13 Oct 2005
1978-v2
Memo on Preliminary Values for MI BPM Polynomial Coefficients
Bob Webber
Monitoring Instrumentation
Extraction from Main Injector
BPM
Beam Instrumentation
BPM
BPM
03 Oct 2005
1322-v2
Main Injector/NuMI BPM Scaling - Analysis of Main Injector HP602 and HP604 BPM Data from Traditional Main Injector and NuMI BPM Systems
Bob Webber
Commissioning
Monitoring Instrumentation
BPM
Beam Instrumentation
BPM
General
03 Oct 2005
1953-v1
NuMI_090805.ppt
Samuel R. Childress
et al.
Extraction from Main Injector
09 Sep 2005
1941-v1
ANTIPROTON AND NEUTRINO PRODUCTION ACCELERATOR TIMELINE ISSUES
Dave McGinnis
General
Accumulator
29 Aug 2005
1900-v1
Report to the Fermilab Director by the Proton Committee
Chuck Ankenbrandt
et al.
Upgrades
Operations
MiniBooNE
General
18 Jul 2005
1745-v1
Numi Beamline Optics study, March 14, 2005
Ming-jen Yang
Optics
Transfer Lines
Primary Proton Beam
22 Mar 2005
1378-v2
NUMI MI Batch by Batch Intensity Measurements
Alexei Semenov
Monitoring Instrumentation
Talks
Beam Instrumentation
Instrumentation/beam Physics
Intensity Measurements
18 Mar 2005
1527-v1
Description of the ACNET devices that control the Main Injector inputs to the NuMI Beam Permit System
Andrew Godley
Monitoring Instrumentation
Extraction from Main Injector
Beam Instrumentation
Intensity Measurements
14 Jan 2005
1435-v1
The NUMI Beamline
Samuel R. Childress
et al.
Target Hall Systems
Commissioning
Monitoring Instrumentation
Extraction from Main Injector
Run II
Focusing Horns
Primary Proton Beam
04 Nov 2004
1412-v2
Numi BPM Measurement Data
James A. Fitzgerald
Monitoring Instrumentation
BPM
Beam Instrumentation
19 Oct 2004
1416-v1
Note on BPM Sensitivity Scale Factors for NuMI BPM System
Bob Webber
Commissioning
Monitoring Instrumentation
BPM
BPM
General
Primary Proton Beam
18 Oct 2004
1323-v3
MI beam orbit verifier specifications for the NuMI Beam Permit System
Andrew Godley
Monitoring Instrumentation
Extraction from Main Injector
Beam Instrumentation
BPM
Primary Proton Beam
Controls
07 Sep 2004
1277-v1
Booster Cogging: Synchronization with the Main Injector for NuMI & Slip-Stacking
Robert M Zwaska
LLRF
Commissioning
Commissioning
LLRF
29 Jul 2004
1210-v2
NuMI Transition Module Calibration Procedure
Peter Prieto
Monitoring Instrumentation
BPM
22 Jun 2004
1212-v1
NuMI Calibration Board Test Procedure
Peter Prieto
Monitoring Instrumentation
BPM
22 Jun 2004
1211-v1
NuMI BPM Pre-Installation Preparation
Peter Prieto
Monitoring Instrumentation
BPM
22 Jun 2004
1209-v1
NuMI Transition Module Description
Peter Prieto
Monitoring Instrumentation
BPM
22 Jun 2004
1192-v3
NuMi BPM Sign Convention and Signal Path
Peter Prieto
Monitoring Instrumentation
BPM
22 Jun 2004
1193-v1
NuMI Toroid Scope and Functionality
Peter Prieto
Monitoring Instrumentation
04 Jun 2004
1036-v1
Beam to NuMI
Peter Kasper
Primary Proton Beam
24 Feb 2004
724-v1
Optimization Studies of Beam Optics for the Low Energy Neutrino Production
Valeriy I. Garkusha
et al.
Target Hall Systems
Focusing Horns
09 Jan 2004
918-v1
Talks given at NBI2003 in KEK by Bob Zwaska
Robert M Zwaska
Commissioning
Monitoring Instrumentation
Upgrades
Extraction from Main Injector
Commissioning
Dampers
Primary Proton Beam
18 Nov 2003
889-v1
NuMI Primary Beam Design Report
Samuel R. Childress
et al.
Primary Proton Beam
30 Oct 2003
859-v1
Booster cogging for multiple batch operation of the Main Injector
William A Pellico
et al.
Commissioning
Project
Projects
Studies
LLRF
Primary Proton Beam
02 Oct 2003
754-v1
NuMI Extraction Comparison for Two and Three Kickers
David E. Johnson
Extraction
Extraction from Main Injector
13 Aug 2003
755-v1
Guidelines for MI60 Extraction with Three Kickers
David E. Johnson
Extraction
Extraction from Main Injector
13 Aug 2003
756-v2
NuMI Extraction Geometry with Current Main Injector Orbits, Quad Offsets, and Correctors
David E. Johnson
Extraction from Main Injector
Operations
13 Aug 2003
753-v1
NuMI Extraction Lambertson Configuration at MI60
David E. Johnson
Extraction
Extraction from Main Injector
31 Jul 2003
736-v1
Coupling Between Adjacent BPMs
James L. Crisp
Monitoring Instrumentation
BPM
BPM
17 Jul 2003
735-v1
Locating the neutrino beam elements
Adam Para
Target Hall Systems
Commissioning
Monitoring Instrumentation
Focusing Horns
Alignment
16 Jul 2003
734-v1
Cross-Hair System Performance Requirements
Deborah Harris
Target Hall Systems
Monitoring Instrumentation
Alignment
16 Jul 2003
733-v1
A NUMI Wide-Band Beam Shield Design That Meets The Concentration Model Ground Water Criteria
William S. Freeman
Decay Pipe
ES&H
16 Jul 2003
731-v1
Absorber Conceptual Design for the 11/98 DOE Baseline Review
Alan A. Wehmann
Hadron Absorber
16 Jul 2003
730-v1
Proposal for Continuously-Variable Beam Energy
Deborah Harris
et al.
Target Hall Systems
15 Jul 2003
729-v1
Technical Design of the Target Pile Protection Baffle
Valeriy I. Garkusha
et al.
Target Hall Systems
14 Jul 2003
728-v1
MI60 Quad Offsets for NuMI
David E. Johnson
Alignment
Alignment
Primary Proton Beam
Installation
11 Jul 2003
726-v1
Theory of the Hylen Hadron Hose
Richard H. Milburn
Decay Pipe
10 Jul 2003
687-v1
Robotic Repair for NuMI Hadronic Hose
Samuel R. Childress
et al.
Decay Pipe
10 Jul 2003
721-v4
Proposal to Include Hadronic Hose in the NuMI Beam Line
Samuel R. Childress
et al.
Decay Pipe
10 Jul 2003
723-v1
Further Studies of Target for the Low Energy NuMI Beam
Valeriy I. Garkusha
et al.
Target Hall Systems
09 Jul 2003
720-v1
Effect of the Hadron Hose on MINOS Physics
Elizabeth Buckley-Geer
et al.
Decay Pipe
General
08 Jul 2003
719-v1
Neutrino Fluxes, Hadron Production and the Hadronic Hose
James Hylen
et al.
Decay Pipe
08 Jul 2003
718-v1
NuMI Hadronic Hose Technical Design Report
Robert J. Ducar
et al.
Decay Pipe
08 Jul 2003
717-v1
NuMI Wide Band Neutrino Beam Alignment Requirements, Calculated using a Modified Version of the PBEAM Monte Carlo Program
Wesley M. Smart
Alignment
08 Jul 2003
716-v1
Preliminary Design Work and Neutrino Beam Calculations for the NuMI Project
Valeriy I. Garkusha
et al.
Target Hall Systems
Focusing Horns
08 Jul 2003
715-v1
Conceptual Design Work and Neutrino Beam Calculations for the NuMI Project
Valeriy I. Garkusha
et al.
Target Hall Systems
Focusing Horns
08 Jul 2003
714-v1
Preliminary Design Work on NBB Absorber and Target Prototype
Valeriy I. Garkusha
et al.
Target Hall Systems
07 Jul 2003
713-v1
Conceptual Design of the Narrow Band Beam Absorber and Low Energy Wide Band Beam Calculations for the NuMI Project
Valeriy I. Garkusha
et al.
Focusing Horns
07 Jul 2003
712-v1
Monitoring NuMI Target
Alex V. Kulik
Target Hall Systems
07 Jul 2003
711-v1
Advanced Conceptual Design of the Full-Scale Fin Target and Engineering Design of the Target Prototypes for the NuMI Project
Valeriy I. Garkusha
et al.
Target Hall Systems
General
03 Jul 2003
706-v1
Advanced Conceptual Design of the Low Energy Target and Beam Plug
Valeriy I. Garkusha
et al.
Target Hall Systems
03 Jul 2003
707-v1
Comparison of Initial Conceptual Designs of the Low Energy Target
Valeriy I. Garkusha
et al.
Target Hall Systems
03 Jul 2003
708-v1
The PH2M Two Horns Focusing System for the NuMI Project
Valeriy I. Garkusha
et al.
Focusing Horns
03 Jul 2003
710-v1
The NuMI WBB for Tau Neutrino Appearance Experiments
Valeriy I. Garkusha
et al.
General
03 Jul 2003
709-v1
Proposed Test of NuMI Prototype Target in Main Injector Beam
Valeriy I. Garkusha
et al.
Target Hall Systems
03 Jul 2003
686-v1
Physics potential of the three Ph2 beam designs
David A. Petyt
General
23 Jun 2003
685-v1
Pre-engineering Design for the Technical Components of the NuMI Beams
Valeriy I. Garkusha
et al.
General
23 Jun 2003
684-v1
Neutrino Event Rate Comparison for Continuous Versus Discrete Decay Pipe Shielding
James Hylen
Decay Pipe
23 Jun 2003
677-v1
Calculations and Mapping of the Magnetic Field in the Prototype Horn 1
Valeriy I. Garkusha
et al.
Focusing Horns
20 Jun 2003
676-v1
Dynamic Stress Calculations for ME and LE Targets and Results of Prototyping for the LE Target
Valeriy I. Garkusha
et al.
Target Hall Systems
20 Jun 2003
674-v2
Energy Deposition in the NuMI Neutrino Beam-Line
Fedor Novoskoltsev
General
20 Jun 2003
673-v1
Advanced Conceptual Design of the NuMI Hadron Beam Absorber Core
Valeriy I. Garkusha
et al.
Hadron Absorber
19 Jun 2003
752-v1
Proposed Main Injector Quad Offsets and Dipole Correctors Currents for the Current NuMI Extraction Geometry
David E. Johnson
Extraction
Extraction from Main Injector
10 Jun 2003
843-v1
Temperature and Stresses in the LE Target with 6.4 mm Wide Segments
Valeriy I. Garkusha
et al.
Target Hall Systems
20 Jun 2001
347-v1
Single Turn Extraction Design for NuMI
David E. Johnson
Extraction
Civil Construction
Extraction from Main Injector
Design Properties
Civil
06 Jan 2000
1148-v4
FERMILAB COORDINATE SYSTEMS
Babatunde Oshinowo
Alignment
Alignment
Alignment
Alignment
Alignment
Alignment
Alignment
15 May 1997
Number of documents found: 81
[
DocDB Home
] [
Search
] [
Last 20 Days
] [
List Authors
] [
List Topics
]
DocDB
Version 8.7.11, contact
Beams Document Database Administrators
Security, Privacy, Legal
Execution time:
2 wallclock secs ( 0.86 usr + 0.16 sys = 1.02 CPU)