Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Neutrinos at the Main Injector Long baseline neutrino beam and sub-topics are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
5579-v1 Conceptual Design Study of NuMI Operation for PIP-I+ Cory F Crowley et al. Studies
PIP-Iplus
03 Jul 2017
5355-v1 The Challenges of Next Generation Neutrino Beam Targetry Patrick G. Hurh et al. Target Hall Systems
NuMI
NOvA
23 Mar 2017
1813-v1 A First Look at NuMI Intensity Measuring Device Calibration Daniel D Cherdack Monitoring Instrumentation
DCCTs
16 Feb 2017
5318-v1 Fermilab Proton Improvement Plans Vladimir Shiltsev Beam Physics
General
Operations
26 Jan 2017
4824-v1 NuMI Optics Thomas R. Kobilarcik Studies
01 May 2015
4723-v1 Tunnel Cable Clean-up Memos Paul PCC Czarapata ES&H
ES&H
22 Dec 2014
4458-v3 High Power Target R&D Program Talk Kavin Ammigan et al. Accelerator Seminar
NuMI
27 Dec 2013
3918-v2 SRF Beam Test Facility Machine Protection System (MPS) Arden A. Warner Civil Construction
NML
26 Sep 2011
3330-v33 List of NuMI Upgrades Meetings and Reviews Michael A. Martens NuMI
22 Apr 2010
3420-v1 HINS MS6 East regulator Installation Maurice Ball Proton Driver
General
Water
09 Jul 2009
3262-v2 Ground Motion Studies At fermilab James T. Volk NuMI
HLRF
ILCTA
16 Jan 2009
3159-v1 Delivering High Intensity Proton Beam; Lessons for the Next Beam Generations Samuel R. Childress NuMI
Primary Proton Beam
15 Jul 2008
2844-v1 Radiological Issues of NuMI with a 2.3 MW Beam Kamran Vaziri Radiation Safety
31 Jul 2007
2687-v1 MINU -- Main Injector Neutrino Upgrades Infrastructure Dixon Bogert Civil Construction
14 Mar 2007
2678-v1 Delivering Protons to the Antiproton Source after the Tevatron Collider Era Chuck Ankenbrandt et al. NuMI
Recycler
Future Accelerators
Antiproton Source
Main Injector
06 Mar 2007
2610-v1 PP2-->NoVA: what does it mean for us Robert M Zwaska General
10 Jan 2007
2439-v1 NuMI and Rapid Transfer BPM Test Application Program Specifications Duane C Voy Monitoring Instrumentation
BPM
06 Sep 2006
2393-v1 Fermilab Proton Projections for Long-Baseline Neutrino Beams Robert M Zwaska SNuMi
Proton Plan
General
16 Aug 2006
2390-v1 The NuMI Beam System: First Year of Operation Samuel R. Childress Target Hall Systems
Extraction from Main Injector
Primary Proton Beam
14 Aug 2006
2178-v2 First Report of the Proton Study Group Sergei Nagaitsev et al. Operations
Upgrades
SY120
Other
General
03 Apr 2006
2039-v1 Tritium Production in the Dolomitic Rock Adjacent to NuMI Beam Tunnels Samuel R. Childress et al. Radiation Safety
05 Dec 2005
1989-v1 The NuMI Beam System:Commissioning & Initial Operation Samuel R. Childress Commissioning
Primary Proton Beam
13 Oct 2005
1978-v2 Memo on Preliminary Values for MI BPM Polynomial Coefficients Bob Webber Monitoring Instrumentation
Extraction from Main Injector
BPM
Beam Instrumentation
BPM
BPM
03 Oct 2005
1322-v2 Main Injector/NuMI BPM Scaling - Analysis of Main Injector HP602 and HP604 BPM Data from Traditional Main Injector and NuMI BPM Systems Bob Webber Commissioning
Monitoring Instrumentation
BPM
Beam Instrumentation
BPM
General
03 Oct 2005
1953-v1 NuMI_090805.ppt Samuel R. Childress et al. Extraction from Main Injector
09 Sep 2005
1941-v1 ANTIPROTON AND NEUTRINO PRODUCTION ACCELERATOR TIMELINE ISSUES Dave McGinnis General
Accumulator
29 Aug 2005
1900-v1 Report to the Fermilab Director by the Proton Committee Chuck Ankenbrandt et al. Upgrades
Operations
MiniBooNE
General
18 Jul 2005
1745-v1 Numi Beamline Optics study, March 14, 2005 Ming-jen Yang Optics
Transfer Lines
Primary Proton Beam
22 Mar 2005
1378-v2 NUMI MI Batch by Batch Intensity Measurements Alexei Semenov Monitoring Instrumentation
Talks
Beam Instrumentation
Instrumentation/beam Physics
Intensity Measurements
18 Mar 2005
1527-v1 Description of the ACNET devices that control the Main Injector inputs to the NuMI Beam Permit System Andrew Godley Monitoring Instrumentation
Extraction from Main Injector
Beam Instrumentation
Intensity Measurements
14 Jan 2005
1435-v1 The NUMI Beamline Samuel R. Childress et al. Target Hall Systems
Commissioning
Monitoring Instrumentation
Extraction from Main Injector
Run II
Focusing Horns
Primary Proton Beam
04 Nov 2004
1412-v2 Numi BPM Measurement Data James A. Fitzgerald Monitoring Instrumentation
BPM
Beam Instrumentation
19 Oct 2004
1416-v1 Note on BPM Sensitivity Scale Factors for NuMI BPM System Bob Webber Commissioning
Monitoring Instrumentation
BPM
BPM
General
Primary Proton Beam
18 Oct 2004
1323-v3 MI beam orbit verifier specifications for the NuMI Beam Permit System Andrew Godley Monitoring Instrumentation
Extraction from Main Injector
Beam Instrumentation
BPM
Primary Proton Beam
Controls
07 Sep 2004
1277-v1 Booster Cogging: Synchronization with the Main Injector for NuMI & Slip-Stacking Robert M Zwaska LLRF
Commissioning
Commissioning
LLRF
29 Jul 2004
1210-v2 NuMI Transition Module Calibration Procedure Peter Prieto Monitoring Instrumentation
BPM
22 Jun 2004
1212-v1 NuMI Calibration Board Test Procedure Peter Prieto Monitoring Instrumentation
BPM
22 Jun 2004
1211-v1 NuMI BPM Pre-Installation Preparation Peter Prieto Monitoring Instrumentation
BPM
22 Jun 2004
1209-v1 NuMI Transition Module Description Peter Prieto Monitoring Instrumentation
BPM
22 Jun 2004
1192-v3 NuMi BPM Sign Convention and Signal Path Peter Prieto Monitoring Instrumentation
BPM
22 Jun 2004
1193-v1 NuMI Toroid Scope and Functionality Peter Prieto Monitoring Instrumentation
04 Jun 2004
1036-v1 Beam to NuMI Peter Kasper Primary Proton Beam
24 Feb 2004
724-v1 Optimization Studies of Beam Optics for the Low Energy Neutrino Production Valeriy I. Garkusha et al. Target Hall Systems
Focusing Horns
09 Jan 2004
918-v1 Talks given at NBI2003 in KEK by Bob Zwaska Robert M Zwaska Commissioning
Monitoring Instrumentation
Upgrades
Extraction from Main Injector
Commissioning
Dampers
Primary Proton Beam
18 Nov 2003
889-v1 NuMI Primary Beam Design Report Samuel R. Childress et al. Primary Proton Beam
30 Oct 2003
859-v1 Booster cogging for multiple batch operation of the Main Injector William A Pellico et al. Commissioning
Project
Projects
Studies
LLRF
Primary Proton Beam
02 Oct 2003
754-v1 NuMI Extraction Comparison for Two and Three Kickers David E. Johnson Extraction
Extraction from Main Injector
13 Aug 2003
755-v1 Guidelines for MI60 Extraction with Three Kickers David E. Johnson Extraction
Extraction from Main Injector
13 Aug 2003
756-v2 NuMI Extraction Geometry with Current Main Injector Orbits, Quad Offsets, and Correctors David E. Johnson Extraction from Main Injector
Operations
13 Aug 2003
753-v1 NuMI Extraction Lambertson Configuration at MI60 David E. Johnson Extraction
Extraction from Main Injector
31 Jul 2003
736-v1 Coupling Between Adjacent BPMs James L. Crisp Monitoring Instrumentation
BPM
BPM
17 Jul 2003
735-v1 Locating the neutrino beam elements Adam Para Target Hall Systems
Commissioning
Monitoring Instrumentation
Focusing Horns
Alignment
16 Jul 2003
734-v1 Cross-Hair System Performance Requirements Deborah Harris Target Hall Systems
Monitoring Instrumentation
Alignment
16 Jul 2003
733-v1 A NUMI Wide-Band Beam Shield Design That Meets The Concentration Model Ground Water Criteria William S. Freeman Decay Pipe
ES&H
16 Jul 2003
731-v1 Absorber Conceptual Design for the 11/98 DOE Baseline Review Alan A. Wehmann Hadron Absorber
16 Jul 2003
730-v1 Proposal for Continuously-Variable Beam Energy Deborah Harris et al. Target Hall Systems
15 Jul 2003
729-v1 Technical Design of the Target Pile Protection Baffle Valeriy I. Garkusha et al. Target Hall Systems
14 Jul 2003
728-v1 MI60 Quad Offsets for NuMI David E. Johnson Alignment
Alignment
Primary Proton Beam
Installation
11 Jul 2003
726-v1 Theory of the Hylen Hadron Hose Richard H. Milburn Decay Pipe
10 Jul 2003
687-v1 Robotic Repair for NuMI Hadronic Hose Samuel R. Childress et al. Decay Pipe
10 Jul 2003
721-v4 Proposal to Include Hadronic Hose in the NuMI Beam Line Samuel R. Childress et al. Decay Pipe
10 Jul 2003
723-v1 Further Studies of Target for the Low Energy NuMI Beam Valeriy I. Garkusha et al. Target Hall Systems
09 Jul 2003
720-v1 Effect of the Hadron Hose on MINOS Physics Elizabeth Buckley-Geer et al. Decay Pipe
General
08 Jul 2003
719-v1 Neutrino Fluxes, Hadron Production and the Hadronic Hose James Hylen et al. Decay Pipe
08 Jul 2003
718-v1 NuMI Hadronic Hose Technical Design Report Robert J. Ducar et al. Decay Pipe
08 Jul 2003
717-v1 NuMI Wide Band Neutrino Beam Alignment Requirements, Calculated using a Modified Version of the PBEAM Monte Carlo Program Wesley M. Smart Alignment
08 Jul 2003
716-v1 Preliminary Design Work and Neutrino Beam Calculations for the NuMI Project Valeriy I. Garkusha et al. Target Hall Systems
Focusing Horns
08 Jul 2003
715-v1 Conceptual Design Work and Neutrino Beam Calculations for the NuMI Project Valeriy I. Garkusha et al. Target Hall Systems
Focusing Horns
08 Jul 2003
714-v1 Preliminary Design Work on NBB Absorber and Target Prototype Valeriy I. Garkusha et al. Target Hall Systems
07 Jul 2003
713-v1 Conceptual Design of the Narrow Band Beam Absorber and Low Energy Wide Band Beam Calculations for the NuMI Project Valeriy I. Garkusha et al. Focusing Horns
07 Jul 2003
712-v1 Monitoring NuMI Target Alex V. Kulik Target Hall Systems
07 Jul 2003
711-v1 Advanced Conceptual Design of the Full-Scale Fin Target and Engineering Design of the Target Prototypes for the NuMI Project Valeriy I. Garkusha et al. Target Hall Systems
General
03 Jul 2003
706-v1 Advanced Conceptual Design of the Low Energy Target and Beam Plug Valeriy I. Garkusha et al. Target Hall Systems
03 Jul 2003
707-v1 Comparison of Initial Conceptual Designs of the Low Energy Target Valeriy I. Garkusha et al. Target Hall Systems
03 Jul 2003
708-v1 The PH2M Two Horns Focusing System for the NuMI Project Valeriy I. Garkusha et al. Focusing Horns
03 Jul 2003
710-v1 The NuMI WBB for Tau Neutrino Appearance Experiments Valeriy I. Garkusha et al. General
03 Jul 2003
709-v1 Proposed Test of NuMI Prototype Target in Main Injector Beam Valeriy I. Garkusha et al. Target Hall Systems
03 Jul 2003
686-v1 Physics potential of the three Ph2 beam designs David A. Petyt General
23 Jun 2003
685-v1 Pre-engineering Design for the Technical Components of the NuMI Beams Valeriy I. Garkusha et al. General
23 Jun 2003
684-v1 Neutrino Event Rate Comparison for Continuous Versus Discrete Decay Pipe Shielding James Hylen Decay Pipe
23 Jun 2003
677-v1 Calculations and Mapping of the Magnetic Field in the Prototype Horn 1 Valeriy I. Garkusha et al. Focusing Horns
20 Jun 2003
676-v1 Dynamic Stress Calculations for ME and LE Targets and Results of Prototyping for the LE Target Valeriy I. Garkusha et al. Target Hall Systems
20 Jun 2003
674-v2 Energy Deposition in the NuMI Neutrino Beam-Line Fedor Novoskoltsev General
20 Jun 2003
673-v1 Advanced Conceptual Design of the NuMI Hadron Beam Absorber Core Valeriy I. Garkusha et al. Hadron Absorber
19 Jun 2003
752-v1 Proposed Main Injector Quad Offsets and Dipole Correctors Currents for the Current NuMI Extraction Geometry David E. Johnson Extraction
Extraction from Main Injector
10 Jun 2003
843-v1 Temperature and Stresses in the LE Target with 6.4 mm Wide Segments Valeriy I. Garkusha et al. Target Hall Systems
20 Jun 2001
347-v1 Single Turn Extraction Design for NuMI David E. Johnson Extraction
Civil Construction
Extraction from Main Injector
Design Properties
Civil
06 Jan 2000
1148-v4 FERMILAB COORDINATE SYSTEMS Babatunde Oshinowo Alignment
Alignment
Alignment
Alignment
Alignment
Alignment
Alignment
15 May 1997

Number of documents found: 88

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.37 usr + 0.09 sys = 0.46 CPU)