Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Fermilab External Beams and sub-topics are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
4776-v3 Magnetic Field Measurements in the BnB 25 Meter Absorber Michael R Backfish MiniBooNE
External Beams
06 Jul 2017
5585-v1 MuCool Test Area (MTA) Experimental Capabilities March 2014 Michael R Backfish et al. External Beams
06 Jul 2017
5525-v2 Nova Test Beams Talk 6 14 2017 Michael R Backfish External Beams
MCenter
14 Jun 2017
5418-v1 A Ninety Degree Monitor For Better Target Tuning of the MCenter Secondary Beamline Michael R Backfish External Beams
MTEST
MCenter
16 May 2017
5364-v2 Prospects for a Muon Spin Resonance Facility in the MuCool Test Area John A. Johnstone Muon
External Beams
Linac
17 Apr 2017
5353-v2 Investigation Into MI52 Septa Wire Failures Michael R Backfish Beam Physics
Main Injector
SY120
23 Mar 2017
5324-v1 Investigation Into the Use of Rare Earth Magnets Michael R Backfish External Beams
08 Feb 2017
5323-v1 Measurement of Elliptical Beam Emittance in the Transverse Plane Adam Watts External Beams
Transverse Dynamics
Instrumentation
Beam Physics
SY120
Transfer Lines
Instrumentation
Optics
Beam Dynamics
08 Feb 2017
5284-v1 Computed Tomography of Transverse Phase Space Carol J. Johnstone et al. External Beams
Beam Physics
Instrumentation
21 Nov 2016
5242-v1 MiniBooNE Resistive Wall Current Monitor Michael R Backfish MiniBooNE
External Beams
03 Oct 2016
5231-v1 Magnetic field map for T977 tertiary beam Richard W Gran External Beams
MTEST
MCenter
13 Sep 2016
5225-v1 Simulated Tomography of Beam Transverse Phase Space Adam Watts External Beams
Beam Physics
SY120
Instrumentation
Optics
01 Sep 2016
5155-v1 Status of Switchyard Berm Pipe Cathodic Protection Adam Watts SY120
11 May 2016
5148-v1 Comments on Proton Beams for REDTOP Michael J. Syphers Muon
External Beams
02 May 2016
5098-v2 MICE Cavity Beam Tests in MTA Facility Michael R Backfish External Beams
07 Mar 2016
5040-v2 Magnetic Control of Fermilab Switchyard Beam Splits Adam Watts External Beams
Transverse Dynamics
SY120
24 Feb 2016
4831-v4 Simulation of Momentum Spread in the MTest Secondary Beamline Michael R Backfish Beam Physics
MTEST
18 Feb 2016
5064-v2 Meson Test Improvements During the January 2016 Shutdown Michael R Backfish External Beams
MTEST
04 Feb 2016
4697-v1 The Addition of an Air Gap in the Meson Test Secondary Beamline Michael R Backfish External Beams
MTEST
04 Feb 2016
4994-v5 Effects of Rough Vacuum in the P3 Beamline Adam Watts SY120
Main Ring
02 Feb 2016
5049-v2 Kicking the Booster Neutrino Beam Off Target Thomas R. Kobilarcik MiniBooNE
21 Jan 2016
5048-v1 Meson Test Cherenkov Detector Pressure Scans Talk for Switchyard Meeting Michael R Backfish MTEST
Studies
14 Jan 2016
5030-v1 Neutrino-Muon beamline emittance Carol J. Johnstone et al. External Beams
Studies
SY120
Optics
17 Dec 2015
5002-v2 Meson Center Primary Target Shielding Proposal Michael R Backfish External Beams
MCenter
13 Nov 2015
5000-v1 Measuring the Bunch Length of the Booster Neutrino Beamline Beam Michael R Backfish MiniBooNE
External Beams
12 Nov 2015
4915-v2 A Preliminary Beam Permit System for the Neutrino-Muon Beamline Adam Watts External Beams
SY120
Controls
06 Aug 2015
4886-v1 Operational Methods For Delivering Meson Test Beam to Fermi Test Beam Facility Michael R Backfish Operations
External Beams
MTEST
SY120
16 Jul 2015
4825-v3 Booster Neutrino Beamline Decay Pipe Inspection Thomas R. Kobilarcik Studies
21 May 2015
4573-v1 The Booster Neutrino Beamline Thomas R. Kobilarcik MiniBooNE
Accelerator Seminar
17 Apr 2014
4553-v1 Thoughts Concerning Vacuum in the Fixed Target Meson Area Thomas R. Kobilarcik MCenter
12 Mar 2014
4530-v1 NM4 Prompt Dose Investigation Michael I Geelhoed External Beams
04 Feb 2014
4396-v1 Switchyard 120 Cathodic Protection Status Michael I Geelhoed SY120
27 Jun 2013
4375-v2 NM3 Beam Cherenkov Michael I Geelhoed SY120
26 Jun 2013
4225-v3 High Rate Tracking Proposal Michael I Geelhoed MTEST
03 Oct 2012
4146-v2 Integration of ORKA and SY120 Thomas R. Kobilarcik SY120
26 Jun 2012
4039-v1 Optimization of g-2 target Sergei I. Striganov External Beams
Antiproton Source
24 Apr 2012
4076-v2 E906 Beam Status Michael I Geelhoed SY120
20 Feb 2012
4000-v7 HDPE Berm Pipe Radiation Integrity Michael I Geelhoed SY120
08 Dec 2011
4010-v2 HDPE Berm Pipe Aperture Michael I Geelhoed SY120
05 Dec 2011
4009-v4 Berm Pipe Aperture V 4 Michael I Geelhoed SY120
01 Dec 2011
4011-v1 HDPE Vacuum Michael I Geelhoed SY120
29 Nov 2011
4001-v3 Neutrino Muon Beamline Optics Michael I Geelhoed SY120
22 Nov 2011
3483-v1 LBNE - Lattice Optics (opus #1) John A. Johnstone Studies
Optics
25 Oct 2009
3236-v0 Accelerator Division Impact Statement for the Mu2e Proposal Michael J. Syphers External Beams
Antiproton Source
27 Oct 2008
3124-v1 FNAL Accelerator Complex Status Ron Moore Operations
External Beams
Linac
Booster
Antiproton Source
Recycler
Main Injector
Tevatron
20 Jun 2008
3090-v1 Tevatron Fixed Target Redux and the NuSOnG Proposal Michael J. Syphers Extraction
External Beams
Main Injector
SY120
Tevatron
06 May 2008
2849-v2 Discussion of Tevatron Fixed Target Options after Run II Michael J. Syphers General
SY120
13 Feb 2008
2272-v1 Fermilab Test Beam & The International Linear Collider Chuck Brown et al. MTEST
Future Accelerators
18 May 2006
2222-v1 Tevatron 120 -- Life after Run II? Michael J. Syphers General
MIPP
CKM
MTEST
SY120
03 Apr 2006
2178-v2 First Report of the Proton Study Group Sergei Nagaitsev et al. Other
Operations
Upgrades
General
SY120
03 Apr 2006
1943-v1 Measurement of Switchyard Phase Space 18Aug05 Thomas R. Kobilarcik SY120
31 Aug 2005
1900-v1 Report to the Fermilab Director by the Proton Committee Chuck Ankenbrandt et al. MiniBooNE
Upgrades
General
Operations
18 Jul 2005
1837-v1 A Proposal to Upgrade the Switchyard BPM Brajesh Choudhary BPM
SY120
BPM
20 May 2005
1750-v1 SY120 BPM Electronics Measurements James A. Fitzgerald Extraction
SY120
BPM
23 Mar 2005
1429-v2 Stacking and SY120 Pulses Dave McGinnis Accumulator
SY120
04 Nov 2004
1387-v3 Thoughts on SY120 Operation in FY'05 David E. Johnson SY120
01 Nov 2004
1403-v1 Bucker Learning Algorithm For Slow Spill Peter Prieto SY120
13 Oct 2004
1316-v1 SY120 Mixed-mode Operation David E. Johnson Transfer Lines
SY120
Transfer Lines
24 Aug 2004
1242-v2 Potential Optical Solutions For Pbar Stacking and SY120 Mixed-Mode Operation David E. Johnson SY120
07 Jul 2004
1120-v1 SY120Jamboree: Resonant Extraction Status and Plans David E. Johnson SY120
13 Apr 2004

Number of documents found: 60

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.28 usr + 0.04 sys = 0.32 CPU)