Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Projects and sub-topics are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
5834-v1 2nd harmonic RF perpendicular biased cavity update (14 Sep 2017) Kevin Duel et al. PIP
14 Sep 2017
5810-v1 2nd harmonic RF perpendicular biased cavity update (31 Aug 2017) John Kuharik et al. PIP
31 Aug 2017
5798-v1 2nd harmonic RF perpendicular biased cavity update (17 Aug 2017) Kevin Duel et al. PIP
17 Aug 2017
5774-v1 PIP: Booster Lattice Studies Cheng-Yang Tan PIP
09 Aug 2017
5756-v1 2nd harmonic RF perpendicular biased cavity update (03 Aug 2017) Cheng-Yang Tan PIP
03 Aug 2017
5663-v2 2nd harmonic RF perpendicular biased cavity update (20 Jul 2017) Kevin Duel et al. PIP
21 Jul 2017
5606-v2 Booster lattice meeting (12 Jul 2017) Cheng-Yang Tan PIP
13 Jul 2017
5591-v1 2nd harmonic RF perpendicular biased cavity update (06 Jul 2017) Kevin Duel et al. PIP
06 Jul 2017
5579-v1 Conceptual Design Study of NuMI Operation for PIP-I+ Cory F Crowley et al. Studies
PIP-Iplus
03 Jul 2017
5573-v1 Booster lattice meeting (28 Jun 2017) Yuri Alexahin et al. PIP
28 Jun 2017
5567-v3 2nd harmonic RF perpendicular biased cavity update (22 Jun 2017) Cheng-Yang Tan PIP
23 Jun 2017
5531-v1 Booster lattice meeting (14 Jun 2017) Yuri Alexahin et al. PIP
15 Jun 2017
5519-v1 Study of Two-Stage Collimation System in Fermilab Booster Valery Kapin PIP
12 Jun 2017
5501-v1 2nd harmonic RF perpendicular biased cavity update (08 Jun 2017) Kevin Duel et al. PIP
08 Jun 2017
5489-v1 Proposal to Use the Fermilab PIP-II Linac to Support a Low Energy Muon Program Adrian Hillier et al. PIP
05 Jun 2017
5477-v2 Booster lattice meeting (31 May 2017) Cheng-Yang Tan PIP
31 May 2017
5456-v1 2nd harmonic RF perpendicular biased cavity update (25 May 2017) Gennady Romanov et al. PIP
25 May 2017
5438-v1 Booster lattice meeting (17 May 2017) Yuri Alexahin et al. PIP
23 May 2017
5430-v1 PIP Status Report Meeting Ken Domann et al. PIP
20 May 2017
5406-v1 2nd harmonic RF perpendicular biased cavity update (11 May 2017) Kevin Duel et al. PIP
11 May 2017
5400-v2 Booster lattice meeting (03 May 2017) Yuri Alexahin et al. PIP
03 May 2017
5388-v1 2nd harmonic RF perpendicular biased cavity update (27 Apr 2017) Kevin Duel et al. PIP
28 Apr 2017
5371-v1 PIP Status Report Meeting Valery Kapin et al. PIP
19 Apr 2017
5367-v1 2nd harmonic RF perpendicular biased cavity update (13 Apr 2017) Kevin Duel et al. PIP
13 Apr 2017
5365-v2 Booster lattice meeting (12 Apr 2017) Yuri Alexahin et al. PIP
12 Apr 2017
5361-v1 PIP1+: Booster lattice measurements Kiyomi Seiya et al. PIP
03 Apr 2017
5358-v1 2nd harmonic RF perpendicular biased cavity update (30 Mar 2017) Kevin Duel et al. PIP
30 Mar 2017
5355-v1 The Challenges of Next Generation Neutrino Beam Targetry Patrick G. Hurh et al. Target Hall Systems
NuMI
NOvA
23 Mar 2017
5354-v1 PIP Status Report Meeting Ken Domann PIP
22 Mar 2017
5352-v2 Laser Notcher status 3-22-17 David E. Johnson PIP
22 Mar 2017
5351-v1 Booster lattice meeting (22 Mar 2017) Yuri Alexahin et al. PIP
22 Mar 2017
5350-v4 Y567b Power Amplifier Tests at 76 and 106 MHz Robyn L Madrak et al. Upgrades
PIP
HLRF
22 Mar 2017
5348-v1 2nd harmonic RF perpendicular biased cavity update (16 Mar 2017) Kevin Duel et al. PIP
17 Mar 2017
5345-v1 PIP Status Report Meeting Salah Chaurize et al. PIP
13 Mar 2017
5343-v1 Booster lattice meeting (08 Mar 2017) Alexandru Macridin et al. PIP
08 Mar 2017
5342-v1 2nd harmonic RF perpendicular biased cavity update (02 Mar 2017) Kevin Duel et al. PIP
02 Mar 2017
5329-v1 2nd harmonic RF perpendicular biased cavity update (16 Feb 2017) Kevin Duel et al. PIP
02 Mar 2017
5340-v1 A proposal for upgrade of Booster collimation system Valery Kapin PIP
22 Feb 2017
5339-v1 Booster lattice meeting (22 Feb 2017) Alexandru Macridin et al. PIP
22 Feb 2017
5338-v1 PIP: Booster Lattice Measurements Cheng-Yang Tan PIP
22 Feb 2017
5325-v1 2nd harmonic RF perpendicular biased cavity mechanical update (09 Feb 2017) Kevin Duel et al. PIP
10 Feb 2017
5321-v1 2nd harmonic RF perpendicular biased cavity update (02 Feb 2017) Kevin Duel et al. PIP
03 Feb 2017
5320-v1 2nd harmonic RF perpendicular biased cavity update (19 Jan 2017) Kevin Duel et al. PIP
02 Feb 2017
5317-v1 PIP Status Report Meeting Ken Domann et al. PIP
25 Jan 2017
5312-v1 2nd harmonic RF perpendicular biased cavity update (19 Jan 2017) Kevin Duel et al. PIP
19 Jan 2017
5308-v2 PIP Status Report Meeting Rene Padilla et al. PIP
11 Jan 2017
5303-v1 2nd harmonic RF perpendicular biased cavity update (05 Jan 2017) Kevin Duel et al. PIP
05 Jan 2017
5300-v1 PIP Status Report Meeting Ken Domann et al. PIP
21 Dec 2016
5294-v1 PIP New Tuners Summary Report Patrick G. Sheahan et al. PIP
HLRF
14 Dec 2016
5289-v1 2nd harmonic RF perpendicular biased cavity update (08 Dec 2016) Kevin Duel et al. PIP
08 Dec 2016
5288-v1 Criteria for proceeding with replacement Booster cavity (PIP) William A Pellico Booster
PIP
05 Dec 2016
5286-v1 Closeout - Recommendations and Comments Fernanda G Garcia PIP
30 Nov 2016
5274-v1 Timetable Fernanda G Garcia PIP
22 Nov 2016
5272-v1 Answers to Reviewer Questions David E. Johnson PIP
22 Nov 2016
5270-v1 Laser Instrumentation Todd R. Johnson PIP
22 Nov 2016
5268-v2 July Commissioning and Upgrade palns David E. Johnson PIP
22 Nov 2016
5267-v1 Pulse Formation and Fiber System David E. Johnson PIP
22 Nov 2016
5269-v2 Laser Notcher Free Space Optics Todd R. Johnson PIP
22 Nov 2016
5266-v2 Overall Design of Laser Notcher System Kevin Duel et al. PIP
22 Nov 2016
5265-v1 Welcome / Charge / Motivation Fernanda G Garcia et al. PIP
22 Nov 2016
5276-v1 2nd harmonic RF perpendicular biased cavity update (17 Nov 2016) Kevin Duel et al. PIP
18 Nov 2016
5261-v1 2nd harmonic RF perpendicular biased cavity update (27 Oct 2016) Matt R Kufer et al. PIP
18 Nov 2016
5262-v1 PIP Status Report Meeting David E. Johnson et al. PIP
28 Oct 2016
5260-v1 PIP: Summary of DC studies held between 12 Oct to 14 Oct 2016 Cheng-Yang Tan PIP
27 Oct 2016
5257-v2 PIP Status Report Meeting Ken Domann et al. PIP
26 Oct 2016
5254-v1 Laser Nothcher Status 10-19-2016 David E. Johnson et al. Projects
PIP
19 Oct 2016
5241-v4 2nd harmonic RF perpendicular biased cavity update (29 Sep 2016) Gennady Romanov et al. PIP
29 Sep 2016
5222-v2 PIP Status Report Meeting Valery Kapin et al. PIP
28 Sep 2016
5240-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
28 Sep 2016
5239-v1 PIP Status Report Meeting Matthew H Gardner et al. PIP
27 Sep 2016
5185-v4 2nd harmonic RF perpendicular biased cavity update (12 July 2016) Kevin Duel et al. PIP
22 Sep 2016
5232-v1 2nd harmonic RF perpendicular biased cavity update (15 Sep 2016) Robyn L Madrak et al. PIP
15 Sep 2016
5224-v1 2nd harmonic RF perpendicular biased cavity update (01 Sep 2016) Gennady Romanov et al. PIP
01 Sep 2016
5218-v1 2nd harmonic RF perpendicular biased cavity update (18 Aug 2016) Kevin Duel et al. PIP
18 Aug 2016
5206-v1 PIP Status Report Meeting David E. Johnson et al. PIP
Linac
11 Aug 2016
5202-v2 2nd harmonic RF perpendicular biased cavity update (28 July 2016) Kevin Duel et al. PIP
29 Jul 2016
5200-v1 PIP Status Report Meeting Ken Domann et al. PIP
27 Jul 2016
5196-v1 PIP Status Report Meeting William A Pellico PIP
19 Jul 2016
5175-v1 2nd harmonic RF perpendicular biased cavity update (16 June 2016) Kevin Duel et al. PIP
30 Jun 2016
5183-v1 2nd harmonic RF perpendicular biased cavity update (30 June 2016) Kevin Duel et al. PIP
30 Jun 2016
5174-v1 PIP: Measurements and simulations of beam crossing transition Chandrashekhara M. Bhat et al. PIP
15 Jun 2016
5171-v1 2nd harmonic RF perpendicular biased cavity update (02 June 2016) Kevin Duel et al. PIP
03 Jun 2016
5158-v1 2nd harmonic RF perpendicular biased cavity update (19 May 2016) Kevin Duel et al. PIP
19 May 2016
5152-v1 2nd harmonic RF perpendicular biased cavity update (05 May 2016) Gennady Romanov et al. PIP
05 May 2016
5144-v1 2nd harmonic RF perpendicular biased cavity update (21 Apr 2016) Kevin Duel et al. PIP
21 Apr 2016
5142-v1 PIP: LOCO update Ken Domann et al. PIP
20 Apr 2016
5136-v2 PIP: 2nd Harmonic Cavity Update William A Pellico et al. PIP
20 Apr 2016
5137-v1 Experience with the ferrite tuner for LEB (1992-1993) Vyacheslav Yakovlev PIP
15 Apr 2016
5132-v1 PIP Status Report Meeting Valery Kapin et al. PIP
08 Apr 2016
5134-v1 2nd harmonic RF perpendicular biased cavity update (07 Apr 2016) Kevin Duel et al. PIP
07 Apr 2016
5114-v1 2nd harmonic RF perpendicular biased cavity update (24 Mar2016) Kevin Duel et al. PIP
24 Mar 2016
5113-v1 PIP Status Report Meeting Ken Domann et al. PIP
24 Mar 2016
5112-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
24 Mar 2016
5100-v1 2nd harmonic RF perpendicular biased cavity update (10 Mar2016) Gennady Romanov et al. PIP
10 Mar 2016
5097-v2 Laser Notcher Status David E. Johnson Projects
Projects
PIP
02 Mar 2016
5095-v1 2nd harmonic RF perpendicular biased cavity update (25 Feb 2016) Kevin Duel et al. PIP
25 Feb 2016
5079-v1 Booster Collimators Valery Kapin PIP
17 Feb 2016
5071-v1 2nd harmonic RF perpendicular biased cavity update (11 Feb 2016) Kevin Duel et al. PIP
11 Feb 2016
5070-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
10 Feb 2016
5060-v1 PIP Status Report Meeting Chandrashekhara M. Bhat et al. PIP
01 Feb 2016
5058-v3 An Update on Early Injection Capture in the Booster Chandrashekhara M. Bhat Operations
PIP
01 Feb 2016
5059-v2 2nd harmonic RF perpendicular biased cavity update (28 Jan 2016) Gennady Romanov et al. PIP
29 Jan 2016
5047-v1 2nd harmonic RF perpendicular biased cavity update (14 Jan 2016) Cheng-Yang Tan et al. PIP
14 Jan 2016
5044-v1 PIP Meeting Thomas K Kroc et al. PIP
13 Jan 2016
5046-v2 PIP Meeting: 2nd Harmonic cavity Update Cheng-Yang Tan PIP
13 Jan 2016
5045-v1 PIP Status Report Meeting Ken Domann et al. PIP
13 Jan 2016
4610-v18 PIP RF Cavity and Tuners Refurbishement Progress & Projections Keith E Gollwitzer Upgrades
PIP
11 Jan 2016
4566-v3 Optics corrections in Booster Cheng-Yang Tan PIP
21 Dec 2015
5027-v1 PIP: Improving and fixing the Booster MADX model Cheng-Yang Tan PIP
16 Dec 2015
5022-v1 2nd harmonic RF perpendicular biased cavity update (10 Dec 2015) Robyn L Madrak et al. PIP
10 Dec 2015
5013-v2 Workshop on Booster Performance and Enhancements 23 Nov - 24 Nov Chandrashekhara M. Bhat et al. PIP
09 Dec 2015
5020-v1 Plan for booster collimations (Dec2015-summer2016) Valery Kapin PIP
08 Dec 2015
4864-v2 Simplified Modeling of Space Charge Losses in Booster at Injection Alexander A. Valishev Beam Dynamics
PIP
23 Nov 2015
5009-v1 Recommendations from review of 700kW plan Mary Convery PIP
Recycler
17 Nov 2015
5001-v3 2nd harmonic RF perpendicular biased cavity update (12 Nov 2015) Gennady Romanov et al. PIP
12 Nov 2015
4992-v1 PIP Status Report Meeting Ken Domann et al. PIP
28 Oct 2015
2433-v11 BLM Upgrade Controller Card Program Design Randy M Thurman-Keup Run II Upgrades
Instrumentation
Beam Loss Monitors (BLM)
Beam Instrumentation
16 Oct 2015
4981-v1 2nd harmonic RF perpendicular biased cavity update (15 Oct 2015) Gennady Romanov et al. PIP
15 Oct 2015
4960-v1 PIP Status Report Meeting Ken Domann et al. Booster
PIP
26 Sep 2015
4958-v1 2nd Harmonic Perpendicular Biased Cavity for Booster Cheng-Yang Tan PIP
25 Sep 2015
4956-v1 2nd harmonic RF perpendicular biased cavity update (24 Sep 2015) Robyn L Madrak et al. PIP
25 Sep 2015
4943-v1 Proton Improvement Plan / Proton Source Ready for 700kW William A Pellico Booster
PIP
10 Sep 2015
4945-v1 Introduction -- 700kW Followup Review Mary Convery Main Injector
PIP
Recycler
10 Sep 2015
4946-v1 2nd harmonic RF perpendicular biased cavity update (10 Sep 2015) Mohamed Awida et al. PIP
10 Sep 2015
4937-v3 PIP Status Report Meeting Trevor A Butler et al. PIP
02 Sep 2015
4933-v2 2nd harmonic RF perpendicular biased cavity update (27 Aug 2015) Ding Sun et al. PIP
27 Aug 2015
4922-v2 2nd harmonic RF perpendicular biased cavity update (13 Aug 2015) Gennady Romanov et al. PIP
14 Aug 2015
4920-v1 PIP Status Report Meeting Ryan Crawford et al. Booster
PIP
Linac
12 Aug 2015
4902-v1 PIP Status Report Meeting Tom N Kubicki et al. PIP
04 Aug 2015
4903-v1 2nd harmonic RF perpendicular biased cavity update (30 July 2015) Kevin Duel et al. PIP
30 Jul 2015
4898-v1 Concepts for efficient production, transport and cooling of intense muon beams Diktys Stratakis Muon
Projects
Accelerator Seminar
Mu2e
g-2
28 Jul 2015
4897-v1 Concepts for efficient production, transport and cooling of intense muon beams Diktys Stratakis Muon Collider
Accelerator Seminar
Mu2e
28 Jul 2015
4893-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
Upgrades
22 Jul 2015
4892-v2 2nd harmonic RF perpendicular biased cavity special meeting on matching Cheng-Yang Tan PIP
21 Jul 2015
4885-v1 2nd harmonic RF perpendicular biased cavity update (16 July 2015) Gennady Romanov et al. PIP
16 Jul 2015
4879-v1 2nd harmonic RF perpendicular biased cavity update (01 July 2015) Robyn L Madrak et al. PIP
01 Jul 2015
4871-v1 PIP Status Report Meeting Ken Domann et al. PIP
29 Jun 2015
4865-v1 Talks presented at the PIP Status Meeting William A Pellico PIP
17 Jun 2015
4855-v2 2nd harmonic RF perpendicular biased cavity special meeting on power coupler Gennady Romanov et al. PIP
11 Jun 2015
4847-v1 2nd harmonic RF perpendicular biased cavity update (21 May 2015) Gennady Romanov et al. PIP
09 Jun 2015
4853-v1 2nd harmonic RF perpendicular biased cavity update (4 June 2015) Gennady Romanov et al. PIP
04 Jun 2015
4852-v2 PIP Status Report Meeting Ryan Crawford et al. PIP
03 Jun 2015
4846-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
20 May 2015
4821-v1 Plan for PA test at 76/106 MHz Joseph E. Dey et al. PIP
30 Apr 2015
4820-v1 PIP Status Report Meeting Ryan Crawford et al. PIP
29 Apr 2015
4812-v1 PIP Status Report Meeting Ken Domann et al. PIP
22 Apr 2015
4804-v1 2nd harmonic RF perpendicular biased cavity update (15 Apr 2015) Robyn L Madrak et al. PIP
16 Apr 2015
4795-v1 PIP Status Report Meeting Raymond Tomlin et al. PIP
14 Apr 2015
4801-v1 PIP Status Report Meeting Joe Compton et al. PIP
13 Apr 2015
4796-v2 2nd harmonic RF perpendicular biased cavity update (02 Apr 2015) Robyn L Madrak et al. PIP
02 Apr 2015
4794-v1 PIP Status Report Meeting Ken Domann et al. PIP
30 Mar 2015
4784-v1 PIP Status Report Meeting Joe Compton et al. PIP
16 Mar 2015
4783-v2 2nd harmonic RF perpendicular biased cavity update (12 Mar 2015) Gennady Romanov et al. PIP
12 Mar 2015
4779-v1 PIP Status Report Meeting Ryan Crawford et al. Booster
PIP
09 Mar 2015
4778-v1 PIP: LOCO update Cheng-Yang Tan PIP
04 Mar 2015
4774-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
Linac
Upgrades
25 Feb 2015
4770-v1 2nd harmonic RF perpendicular biased cavity update (17 Feb 2015) Robyn L Madrak et al. PIP
17 Feb 2015
4763-v1 PIP Status Report Meeting Tom N Kubicki et al. Booster
PIP
HLRF
13 Feb 2015
4756-v1 2nd harmonic RF perpendicular biased cavity update (30 Sep 2014) Robyn L Madrak et al. PIP
05 Feb 2015
4755-v1 2nd harmonic RF perpendicular biased cavity update (12 Sep 2014) Robyn L Madrak et al. PIP
05 Feb 2015
4754-v1 2nd harmonic RF perpendicular biased cavity update (14Jan2015 - 03 Feb 2015) Robyn L Madrak et al. PIP
03 Feb 2015
4753-v1 PIP Status Report Meeting Ken Domann et al. Booster
PIP
02 Feb 2015
4738-v2 Laser Notcher Demonstration Experiment Matthew H Gardner et al. PIP
14 Jan 2015
4739-v1 2nd harmonic RF perpendicular biased cavity update (Dec 2014- 14Jan2015) Robyn L Madrak et al. PIP
14 Jan 2015
4731-v1 PIP Status Report Meeting Ryan Crawford et al. PIP
17 Dec 2014
4724-v1 PIP Status Report Meeting David E. Johnson PIP
Linac
10 Dec 2014
4721-v1 2nd harmonic RF perpendicular biased cavity update (Nov-Dec 2014) Cheng-Yang Tan PIP
10 Dec 2014
4719-v1 Enhancements of the Fermilab Booster to Reduce Losses and Extend Lifetime: The Proton Improvement Plan Robert M Zwaska Booster
PIP
Linac
30 Nov 2014
4718-v1 PIP Status Report Meeting Ken Domann et al. PIP
HLRF
25 Nov 2014
4712-v1 PIP Status Report Meeting Ryan Crawford et al. Booster
PIP
Linac
19 Nov 2014
4711-v1 Laser Notcher Pulse Energy Requirements & Demonstration Experiment David E. Johnson et al. PIP
Upgrades
19 Nov 2014
4700-v2 Preparing for PIP II - What are the issues and plans for Booster William A Pellico Accelerator Seminar
Booster
PIP
18 Nov 2014
4698-v1 2nd harmonic RF perpendicular biased cavity update (Oct-Nov 2014) Cheng-Yang Tan PIP
11 Nov 2014
4693-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
Linac
Upgrades
29 Oct 2014
4691-v3 2nd harmonic RF perpendicular biased cavity update (Oct 2014) Cheng-Yang Tan PIP
21 Oct 2014
4684-v1 PIP General Meeting Status Update Keith E Gollwitzer Booster
PIP
Linac
Regular Meetings
16 Oct 2014
4021-v2 PIP – Linac Modulator Specification Data Trevor A Butler et al. PIP
Linac
22 Sep 2014
4664-v4 Numerical Studies for Proton Improvement Plan at Fermilab Leonid Vorobiev Beam Dynamics
Beam Dynamics
Transverse Dynamics
Instabilities
Longitudinal Dynamics
PIP
Energy Deposition
19 Sep 2014
4669-v1 PIP Status Report Meeting William A Pellico PIP
17 Sep 2014
4663-v1 PIP: 2nd harmonic cavity eddy current considerations Cheng-Yang Tan PIP
29 Aug 2014
4660-v8 PIP Status Report Meeting David Augustine et al. PIP
20 Aug 2014
4651-v1 PIP General Info William A Pellico et al. PIP
14 Aug 2014
4649-v5 PIP Linac Notcher - September Readiness Review Jean-Paul Carneiro et al. PIP
Upgrades
13 Aug 2014
4646-v1 PIP Status Report Meeting Ken Domann et al. Beam Dynamics
PIP
Linac
02 Aug 2014
4631-v1 PIP Status Report Meeting Ken Domann et al. PIP
03 Jul 2014
4628-v1 PIP Status Report Meeting Ryan Crawford et al. Booster
PIP
26 Jun 2014
4627-v2 PIP: 2nd Harmonic Cavity Update Cheng-Yang Tan PIP
25 Jun 2014
4620-v1 PIP Status Report Meeting William A Pellico et al. Booster
PIP
HLRF
20 Jun 2014
4609-v1 PIP General Info Ken Domann et al. PIP
28 May 2014
4606-v1 Doubling the Main Injector Beam Power Ioanis Kourbanis Main Injector
Accelerator Seminar
PIP
Recycler
20 May 2014
4597-v1 2nd harmonic RF perpendicular biased cavity update (04 Apr – 16 May 2014) Cheng-Yang Tan PIP
16 May 2014
4587-v1 PIP Status Report Meeting Nathan Eddy et al. Booster
PIP
30 Apr 2014
4585-v1 PIP General Info Ken Domann et al. PIP
24 Apr 2014
4584-v1 PIP Status Update - Linac Utilities Report Matthew H Gardner PIP
23 Apr 2014
4569-v1 PIP General Info William A Pellico PIP
10 Apr 2014
4567-v2 2nd harmonic RF perpendicular biased cavity update (-- 04 Apr 2014) Cheng-Yang Tan PIP
04 Apr 2014
4565-v1 Booster Bias Supply Upgrade Patrick G. Sheahan Booster
PIP
02 Apr 2014
4564-v2 PIP: 2nd harmonic RF perpendicular biased cavity update Cheng-Yang Tan PIP
02 Apr 2014
4554-v1 PIP General Info Salah Chaurize et al. Booster
PIP
13 Mar 2014
4552-v1 Accelerator Operations and PIP Sergei Nagaitsev Operations
PIP
11 Mar 2014
4547-v1 PIP General Info Ken Domann et al. PIP
20 Feb 2014
4538-v1 PIP General Info Fernanda G Garcia PIP
11 Feb 2014
4536-v1 PIP: LOCO for Booster Cheng-Yang Tan PIP
11 Feb 2014
4534-v1 35 Years of H- Ions at Fermilab Dan Bollinger Pre-Accelerator
Accelerator Seminar
PIP
06 Feb 2014
4512-v1 ASTA Updae Elvin Harms NML
Accelerator Seminar
ILCTA
14 Jan 2014
4501-v1 PIP General Info Trevor A Butler et al. PIP
27 Dec 2013
4499-v1 3-CELL TEST RESULTS & 9-CELL PLAN Howard Pfeffer HLRF
PIP
18 Dec 2013
4492-v1 PIP General Info Ken Domann et al. Beam Dynamics
PIP
LLRF
04 Dec 2013
4490-v1 Status of Pulser for Short Magnets Chris Jensen Power Supplies
PIP
04 Dec 2013
4480-v2 PIP General Info Ken Domann et al. PIP
07 Nov 2013
4479-v1 Preliminary consideration of perpendicularly biased Booster cavity Gennady Romanov PIP
HLRF
07 Nov 2013
4454-v1 Source Development Dan Bollinger Pre-Accelerator
PIP
24 Sep 2013
4453-v1 PIP General Info William A Pellico PIP
24 Sep 2013
4443-v1 Booster Cavity: Parametric Study Mohamed H Hassan et al. Booster
PIP
HLRF
16 Sep 2013
4442-v1 PIP General Info William A Pellico PIP
16 Sep 2013
4269-v5 Recycler BPM Sign Convention, System Description, and Signal Path Peter Prieto BPM
BPM
NOvA
Beam Instrumentation
22 Aug 2013
4431-v1 Booster Aperture and Alignment Kiyomi Seiya Booster
PIP
22 Aug 2013
4430-v1 PIP General Info Ken Domann et al. PIP
21 Aug 2013
4424-v2 TRACK 3D SIMULATIONS OF THE PIP RFQ Jean-Paul Carneiro PIP
13 Aug 2013
4419-v1 Booster New Cavities - PIP Mohamed H Hassan Booster
PIP
24 Jul 2013
4412-v1 PIP General Info William A Pellico PIP
11 Jul 2013
4306-v1 Linac Laser Notcher Status David E. Johnson Projects
PIP
28 Jun 2013
4392-v1 PIP General Info William A Pellico PIP
24 Jun 2013
4380-v2 The FNAL 400 MeV Linac in TRACEWIN Jean-Paul Carneiro PIP
Linac
11 Jun 2013
4363-v2 Plans for Booster & Linac Transformer Installation Ryan Crawford Upgrades
Booster
PIP
Linac
Upgrades
08 May 2013
4366-v1 PIP General Info William A Pellico PIP
08 May 2013
4365-v1 PIP Vacuum Upgrades and Future Plans David Augustine Booster
PIP
08 May 2013
4353-v1 PIP General Info William A Pellico PIP
24 Apr 2013
4352-v1 PIP Budget/Schedule Status Ken Domann PIP
24 Apr 2013
4337-v1 Booster ORM status Eliana Gianfelice-Wendt Beam Dynamics
PIP
10 Apr 2013
4336-v1 PIP General Info William A Pellico PIP
10 Apr 2013
4335-v1 Booster Transition Crossing Yuri Alexahin Beam Dynamics
Booster
PIP
03 Apr 2013
4334-v1 Linac Modulator Upgrade Trevor A Butler PIP
Linac
Upgrades
03 Apr 2013
4333-v1 PIP General Info William A Pellico PIP
03 Apr 2013
4330-v1 PIP Budget/Schedule Status Ken Domann PIP
02 Apr 2013
4325-v1 PIP General Info Robert M Zwaska PIP
27 Mar 2013
4312-v1 Booster Ferrite Bias Supply Upgrade Patrick G. Sheahan Upgrades
Booster
PIP
HLRF
13 Mar 2013
4311-v1 PIP General Info William A Pellico PIP
13 Mar 2013
4308-v1 Linac BPM Status Update Elliott S McCrory BPM
Beam Instrumentation
Beam Instrumentation
Console Applications
PIP
06 Mar 2013
4307-v1 PIP General Info William A Pellico PIP
06 Mar 2013
4304-v1 Update of Booster Alignment & Magnet Moves Kiyomi Seiya Beam Dynamics
Booster
PIP
25 Feb 2013
4302-v1 PIP General Info William A Pellico PIP
25 Feb 2013
4301-v1 Booster Beam Notching Installation Update Salah Chaurize Beam Dynamics
Upgrades
Booster
PIP
25 Feb 2013
4293-v1 Status of Low-Energy Linac Lattice Update Valery Kapin Beam Dynamics
PIP
13 Feb 2013
4292-v1 PIP General Info William A Pellico PIP
13 Feb 2013
4282-v1 Design of Booster Transverse Damper Timofey Zolkin Beam Dynamics
Upgrades
Booster
PIP
30 Jan 2013
4281-v1 Design of the Booster transverse damper. Timofey Zolkin Beam Dynamics
PIP
30 Jan 2013
4280-v1 PIP Budget/Schedule Status Ken Domann PIP
30 Jan 2013
4278-v1 PIP - General Info Robert M Zwaska PIP
30 Jan 2013
4274-v1 Simulation of Booster Transverse Instabilities Alexandru Macridin Beam Dynamics
Booster
PIP
16 Jan 2013
4273-v1 PIP General Info William A Pellico PIP
16 Jan 2013
4270-v1 PIP General Info William A Pellico PIP
10 Jan 2013
4267-v2 BOOSTER NOTCH ABSORBER ASSEMBLY Vladimir Sidorov Booster
PIP
10 Jan 2013
4268-v1 Final Update - 2012 Booster LCW Improvement Plan David Hixson Upgrades
PIP
09 Jan 2013
4266-v1 Refurbished Booster RF John S Reid Upgrades
Booster
PIP
HLRF
21 Dec 2012
4263-v1 PIP Budget/Schedule Status Ken Domann PIP
21 Dec 2012
4265-v1 PIP General Info William A Pellico PIP
21 Dec 2012
4262-v1 Linac Low Energy Modulators Status Update Howard Pfeffer HLRF
PIP
19 Dec 2012
4261-v1 PIP Booster Start-up Schedule Todd Sullivan PIP
12 Dec 2012
4259-v1 PIP General Info William A Pellico PIP
10 Dec 2012
4258-v4 Longitudinal Dynamics Studies for Proton Improvement Plan (PIP) at Fermilab Leonid Vorobiev Beam Dynamics
Longitudinal Dynamics
PIP
06 Dec 2012
4232-v2 Linac BPM upgrade 805MHz phase signal system Elliott S McCrory BPM
Beam Instrumentation
PIP
06 Dec 2012
4257-v2 PIP -- Status of RFQ Injector Cheng-Yang Tan PIP
05 Dec 2012
4256-v3 PIP - Linac Startup Plan Fernanda G Garcia Operations
PIP
Linac
05 Dec 2012
4254-v1 PIP-University Collaboration Robert M Zwaska PIP
28 Nov 2012
4255-v1 PIP Budget/Schedule Status Ken Domann PIP
28 Nov 2012
4253-v1 PIP Update William A Pellico PIP
28 Nov 2012
4251-v2 RFQ Linac Matching. Numerical optimization. Leonid Vorobiev Transverse Dynamics
Beam Dynamics
PIP
27 Nov 2012
4252-v2 Space Charge Templates for 3D beam simulation. Leonid Vorobiev PIP
Antiproton Source
Multiparticle
27 Nov 2012
4246-v1 Project Status Update Ken Domann et al. Projects
Projects
PIP
09 Nov 2012
4245-v1 PIP - General Info William A Pellico et al. PIP
09 Nov 2012
4242-v1 PIP Update Talk Booster Notched Beam Kicker Pulser General Talk Salah Chaurize Booster
PIP
24 Oct 2012
4241-v1 Refurbished Booster RF John S Reid PIP
HLRF
24 Oct 2012
4240-v1 PIP - General Info William A Pellico et al. Booster
PIP
Linac
24 Oct 2012
4239-v1 PIP - General Info William A Pellico PIP
11 Oct 2012
4237-v2 Linac Laser Notcher Status David E. Johnson et al. PIP
08 Oct 2012
4236-v1 Proton Improvement Plan - S&T Review William A Pellico Booster
PIP
Linac
04 Oct 2012
4234-v1 PIP General Info William A Pellico PIP
03 Oct 2012
4231-v1 PIP Budget/Schedule Status Ken Domann PIP
27 Sep 2012
4230-v1 PIP General Info William A Pellico PIP
27 Sep 2012
4229-v2 Progress Update - 2012 Booster LCW Improvement Plan David Hixson Operations
Upgrades
PIP
26 Sep 2012
4228-v1 Linac MCC/Transformer, Hatch, Booster Transformers, Anode Supply Ryan Crawford Upgrades
Booster
PIP
Linac
Upgrades
25 Sep 2012
4223-v1 PIP - General Info William A Pellico PIP
19 Sep 2012
4220-v1 9/19/2012 PIP meeting Source talk Dan Bollinger Pre-Accelerator
PIP
19 Sep 2012
4221-v1 Booster Notch Absorber Update Vladimir Sidorov Booster
PIP
19 Sep 2012
4217-v1 Proton Improvement Plan RFQ Platfrom Update Salah Chaurize PIP
13 Sep 2012
4214-v1 PIP General Info William A Pellico PIP
12 Sep 2012
4210-v1 RFQ PA Systems Brian Schupbach Pre-Accelerator
PIP
Upgrades
30 Aug 2012
4209-v1 Booster L12/Noker-L13/Absorber Update Salah Chaurize Upgrades
Booster
PIP
30 Aug 2012
4207-v1 PIP General Info William A Pellico PIP
29 Aug 2012
4205-v2 PIP - RFQ Injector Installation Overview Cheng-Yang Tan PIP
29 Aug 2012
4204-v1 PIP General Info William A Pellico PIP
22 Aug 2012
4200-v1 PIP General Info William A Pellico PIP
21 Aug 2012
4199-v1 Booster Turbo Manifold Design Analysis David Augustine Upgrades
Booster
PIP
Vacuum
21 Aug 2012
4198-v1 Booster Cogging Teststand Progress -- PIP Presentation Craig C Drennan et al. Upgrades
PIP
LLRF
20 Aug 2012
4197-v1 New Ferrite Testing for Booster Tuners Dennis Barak et al. PIP
HLRF
15 Aug 2012
4195-v1 Linac Substation L1 & Booster Substation Y-BE2 --- Update #3 Ryan Crawford Upgrades
Booster
PIP
Linac
Upgrades
15 Aug 2012
4193-v1 PIP - General Info William A Pellico PIP
09 Aug 2012
4192-v1 Linac 400 MeV BPM Status Nathan Eddy Beam Instrumentation
PIP
08 Aug 2012
4185-v1 MI8 line Emittance Monitor upgrade simulation Ming-jen Yang Lattice
NOvA
27 Jul 2012
4183-v1 PIP - General Info William A Pellico PIP
26 Jul 2012
4182-v1 PIP - General Info William A Pellico et al. Upgrades
PIP
19 Jul 2012
4181-v1 PIP - General Info William A Pellico PIP
18 Jul 2012
4180-v1 Second Refurbished Booster RF Cavity for 15Hz John S Reid PIP
HLRF
18 Jul 2012
4179-v1 Booster Bias Supply & Test Stand Patrick G. Sheahan Power Supplies
PIP
HLRF
18 Jul 2012
4177-v1 PIP - RFQ Repair and Installation Plans Cheng-Yang Tan PIP
11 Jul 2012
4168-v1 PIP - General Info Robert M Zwaska Booster
PIP
Linac
27 Jun 2012
4167-v2 PIP - Linac: Substation L1 & MCC Upgrade Ryan Crawford PIP
Linac
27 Jun 2012
4166-v1 Laser Notcher Status David E. Johnson Projects
PIP
27 Jun 2012
4164-v1 PIP - General Info Salah Chaurize et al. Upgrades
Booster
PIP
20 Jun 2012
4156-v1 PIP - General Info William A Pellico PIP
12 Jun 2012
4140-v1 PIP - General Info and Shutdown 2012 Activities Status Report William A Pellico et al. PIP
30 May 2012
4135-v1 PIP - General Info William A Pellico PIP
24 May 2012
4121-v1 Fast Behlke switches for fast high rep rate beam deflection at 8 GeV Robyn L Madrak et al. Mu2e
01 May 2012
4113-v1 PIP - General Info and Shutdown 2012 Schedule - First 2 weeks William A Pellico PIP
19 Apr 2012
4111-v1 PIP - General Info William A Pellico PIP
13 Apr 2012
4106-v1 L13 Notched Beam Absorber Update Salah Chaurize Operations
Upgrades
Booster
PIP
05 Apr 2012
4105-v1 PIP - General Info William A Pellico PIP
04 Apr 2012
4104-v1 PIP - General Info William A Pellico PIP
29 Mar 2012
4103-v1 PIP Presentation on Booster Main Injector Phase Lock Craig C Drennan PIP
LLRF
28 Mar 2012
4100-v1 PIP - General Info William A Pellico PIP
23 Mar 2012
4081-v4 Booster Nocthing and Absorber Review Salah Chaurize et al. Booster
PIP
21 Mar 2012
4097-v1 PIP - Linac: 200MHz Modulator Upgrade - Status Report Trevor A Butler PIP
Linac
Upgrades
21 Mar 2012
4096-v1 PIP - Linac: Substation L1 & MCC Upgrade Ryan Crawford PIP
Linac
Upgrades
20 Mar 2012
4089-v1 Calibration of Booster BPMs using IPM, and measurement of quad center relative to BPMs Meghan J McAteer Alignment
Booster
PIP
14 Mar 2012
4088-v1 PIP - General Info William A Pellico PIP
14 Mar 2012
4084-v1 First Refurbished Booster RF Cavity for 15Hz John S Reid Booster
PIP
HLRF
07 Mar 2012
4083-v1 PIP - General Info William A Pellico et al. Booster
PIP
Linac
07 Mar 2012
4082-v1 PIP - Booster RF Tuner and cavity Refurbishment Matt Slabaugh Booster
PIP
HLRF
07 Mar 2012
4079-v1 Update of Booster Alignment & Magnet Moves Kiyomi Seiya Alignment
PIP
29 Feb 2012
4078-v1 PIP - General Info William A Pellico PIP
29 Feb 2012
4070-v1 Beam Loading Numerical Simulation for µ2e Experiment Valerii Balbekov et al. Longitudinal Dynamics
Mu2e
14 Feb 2012
4068-v1 Booster SS Driver Upgrade Update Tom N Kubicki Upgrades
Booster
PIP
09 Feb 2012
4067-v1 PIP Schedule Summary Elmie Peoples PIP
09 Feb 2012
4065-v1 PIP - General Info William A Pellico PIP
09 Feb 2012
4066-v1 PIP - General Info William A Pellico PIP
09 Feb 2012
4054-v5 CM1 Thermal Cycle Results at NML Jerry Leibfritz Cryomodule
ILCTA
08 Feb 2012
4062-v1 Beam to Muon g-2 and Mu2e Experiments from Recycler Milorad B. Popovic Booster
PIP
Recycler
Linac
03 Feb 2012
4061-v1 Strong-strong beam-beam simulations for Muon Collider Kazuhito Ohmi Muon Collider
01 Feb 2012
4060-v2 Booster 150 KW Power Amplifier Steve Kotz Booster
PIP
HLRF
01 Feb 2012
4058-v1 PIP - General Info William A Pellico PIP
31 Jan 2012
4057-v1 PIP - General Info William A Pellico PIP
31 Jan 2012
2201-v4 Beam collimation in the transfer line from 8~GeV linac to the Main Injector Alexandr Drozhdin Project
Collimation
Proton Plan
27 Jan 2012
4050-v1 Progress in the RF/Thermal Modeling Effort of the Booster Cavity Mohamed H Hassan PIP
HLRF
18 Jan 2012
4049-v1 Booster Bias Supply Upgrade Patrick G. Sheahan PIP
HLRF
18 Jan 2012
4042-v3 Status of Linac Lattice Study H.J Kim Beam Physics
PIP
Linac
11 Jan 2012
4041-v1 PIP - General Info William A Pellico PIP
11 Jan 2012
4040-v1 Booster Notching Absorber Design Vladimir Sidorov Booster
PIP
10 Jan 2012
4038-v1 Fermilab Booster Model Calibration Alexey Petrenko Booster
PIP
10 Jan 2012
4037-v1 Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP
09 Jan 2012
4036-v1 PIP - General Info William A Pellico PIP
09 Jan 2012
4032-v1 PIP - General Info William A Pellico PIP
03 Jan 2012
4031-v1 PIP - General Info William A Pellico PIP
03 Jan 2012
4028-v2 Booster Digital Damper Status & Plans Nathan Eddy Beam Instrumentation
PIP
21 Dec 2011
4029-v2 Proposal for Booster notching improvement Alexandr Drozhdin et al. PIP
21 Dec 2011
4026-v1 Muon Task Force Valeri A Lebedev Mu2e
20 Dec 2011
4025-v1 Overview of FY 2012 NML Budget and Technical Plans Jerry Leibfritz NML
ILCTA
19 Dec 2011
4020-v1 ASTA/NML Transverse Profile Station: Testing and Installation Amber S Johnson et al. OTR
ILCTA
Beamline
13 Dec 2011
4018-v1 PIP - General Info William A Pellico PIP
07 Dec 2011
4017-v1 PIP - General Info William A Pellico PIP
07 Dec 2011
4016-v1 Booster Bias Supply Upgrade Patrick G. Sheahan PIP
07 Dec 2011
4008-v1 PIP - General Info William A Pellico PIP
28 Nov 2011
4007-v3 Linac L1 Substation Upgrade Steven L. Hays PIP
Upgrades
23 Nov 2011
4006-v1 Orbit response matrix measurements and model calibration for the Fermilab Booster Alexey Petrenko Booster
PIP
23 Nov 2011
4004-v2 New Ferrite Cores for Booster RF Cavity Tuners Ralph Pasquinelli PIP
23 Nov 2011
3999-v1 Booster Bias Supply and Cavity Upgrade Patrick G. Sheahan PIP
17 Nov 2011
3998-v1 PIP General Info William A Pellico PIP
17 Nov 2011
3996-v2 Booster Laser Notcher Proposal David E. Johnson et al. PIP
16 Nov 2011
3993-v1 Booster Alignment & Magnet Moves Kiyomi Seiya Alignment
PIP
09 Nov 2011
3992-v1 Optice Measurements in the Booster Meghan J McAteer Beam Dynamics
PIP
09 Nov 2011
3989-v2 Booster Linear Coupling Measurement and comparison with MAD8 Yuri Alexahin et al. Studies
PIP
09 Nov 2011
3983-v1 Low Conductivity Water (LCW) Cooling System at NML Jerzy Czajkowski et al. NML
ILCTA
Water
07 Nov 2011
3986-v1 PIP - The H- Injector Upgrade Cheng-Yang Tan PIP
02 Nov 2011
3985-v1 PIP - Linac:7835 Procurement Strategy Fernanda G Garcia Operations
Projects
PIP
Linac
Upgrades
02 Nov 2011
3979-v1 Linac RF Modulators New Specifications Trevor A Butler PIP
Linac
01 Nov 2011
3977-v1 Longitudinal instabilities in the Accumulator for μ2e project Valeri Balbekov et al. Instabilities
Longitudinal Dynamics
Mu2e
Accumulator
25 Oct 2011
3976-v1 PIP Budget Codes Budget FY12 Updates William A Pellico et al. PIP
25 Oct 2011
3973-v1 SRF Accelerator Test Facility at NML - Planning and Status Jerry Leibfritz NML
ILCTA
17 Oct 2011
3972-v1 Low Level RF Control and Cavity Tuning Systems at NML Brian E. Chase Cryomodule
ILCTA
LLRF
17 Oct 2011
3971-v1 Piezo Tuner System at NML Test Facility Yuriy Pischalnikov Cryomodule
ILCTA
17 Oct 2011
3964-v1 Project X Based Muon Factory Valeri A Lebedev Mu2e
06 Oct 2011
3961-v1 DEVELOPMENT OF A MACHINE PROTECTION SYSTEM FOR THE SUPERCONDUCTING BEAM TEST FACILITY AT FERMILAB Linden R Carmichael et al. NML
Instrumentation
ILCTA
Controls
30 Sep 2011
3957-v1 Slow extraction from individual bunches using bent crystals Vladimir Shiltsev Mu2e
Adv. Accelerator R&D
29 Sep 2011
3952-v1 Spare cavity status and tuner update Matt Slabaugh Booster
PIP
28 Sep 2011
3947-v1 Booster Laser Notcher Options David E. Johnson Upgrades
PIP
20 Sep 2011
3946-v1 Laser Notcher for Booster David E. Johnson PIP
19 Sep 2011
3936-v1 Linac/400 MeV BPM System Plans and Status Nathan Eddy BPM
BPM
PIP
Upgrades
07 Sep 2011
3935-v2 Proton Source Vacuum Plan David Augustine Vacuum
Booster
PIP
Linac
Vacuum
02 Sep 2011
3932-v1 Linac Momentum Dump Vacuum Repair - Final Design 2011 Robert E Reilly Vacuum
PIP
Other
Linac
31 Aug 2011
3931-v1 Status Report on the Installation of Solid State Conversions for Booster Stations 1 & 2 Steve Kotz Booster
PIP
HLRF
31 Aug 2011
3930-v1 2012 Booster LCW Improvement Plan Overview David Hixson Operations
Upgrades
Projects
Booster
PIP
29 Aug 2011
3926-v1 Proton Improvement Plan -- Preliminary Overview of FY12 Bob Webber Booster
PIP
Linac
24 Aug 2011
3921-v1 Initial Simulations of Performance Limitations of the Booster RF Cavity Mohamed H Hassan HLRF
Booster
PIP
Electromagnetic Calculations
LLRF
10 Aug 2011
3920-v1 PIP- Booster RF -- Spare Cavity Status Matt Slabaugh Booster
PIP
HLRF
10 Aug 2011
3916-v1 Beam Activities and Experiments at the NML Test Facility Mike Church NML
ILCTA
08 Aug 2011
3911-v1 TD Cost Estimate for Booster Tuners Thomas J Gardner Booster
PIP
HLRF
02 Aug 2011
3912-v1 Booster Modulator Upgrades Rene Padilla Booster
PIP
HLRF
02 Aug 2011
3913-v1 Booster Solid State Driver Upgrade Tom N Kubicki Booster
PIP
HLRF
02 Aug 2011
3895-v1 Muon Collider Lattice Design Status Yuri Alexahin Muon Collider
05 Jul 2011
3871-v4 Beam Loading Studies in Accumulator Ring for µ2e project at Fermilab Valerii Balbekov et al. Beam Physics
Accelerator Seminar
Mu2e
Accumulator
29 Jun 2011
3881-v3 Issues Associated with the Coordination of the Mu2e and Muon g-2 Experiments Steve Werkema Mu2e
Antiproton Source
27 Jun 2011
3794-v2 SIMCAV FLASH ACC6 and ACC7 simulator Julien Branlard ILCTA
24 Mar 2011
3796-v1 Note on solving QL for flat gradients at FLASH ACC6 and ACC7 Julien Branlard LLRF
ILCTA
17 Mar 2011
3772-v1 Matching the lattice modules of the “ecentral” beam line for a new design of ILC RTML Yuri Alexahin et al. ILCTA
25 Jan 2011
3752-v1 Booster RF Down Time Analysis (2005) Eric J Prebys Proton Plan
09 Dec 2010
3753-v1 Benefit of 19th Booster RF Cavity Eric J Prebys Proton Plan
09 Dec 2010
3743-v1 Booster Optics Measurements & Correction Yuri Alexahin Beam Dynamics
Proton Plan
07 Dec 2010
3678-v1 MFC DSP Software Outline Philip Varghese LLRF
LLRF
ILCTA
LLRF
23 Sep 2010
3677-v1 1.3 GHz Phase Averaging Reference Line for NML Brian E. Chase et al. NML
ILCTA
LLRF
23 Sep 2010
3674-v1 NML Master Oscillator Julien Branlard ILCTA
23 Sep 2010
3664-v1 Alternative siting for the g -2 experiment David E. Johnson Projects
02 Sep 2010
3634-v1 Study on Microphonics for the Master Oscillator Design at NML Julien Branlard ILCTA
LLRF
30 Jun 2010
1410-v10 BLM Upgrade Users' Guide Alan Baumbaugh et al. TeV ABORT
Instrumentation
Beam Instrumentation
Beam Loss Monitors (BLM)
Beam Instrumentation
21 Jun 2010
3558-v1 Status of Mu2e Operating Scenario Michael J. Syphers Mu2e
24 Feb 2010
3529-v1 Expected Activation of SmCo5 Beam Line Magnets Bruce C. Brown Magnets
ES&H
NOvA
Transfer Lines
05 Jan 2010
3520-v1 Coupling adjustment considerations Julien Branlard ILCTA
08 Dec 2009
3494-v3 LLRF notes Julien Branlard ILCTA
13 Nov 2009
3335-v1 Analysis of beam-based measurement of absolute phase jitter between an accelerating structure and a relativistic electron bunch Philippe R.-G. Piot Photoinjector
Longitudinal Dynamics
ILCTA
16 Mar 2009
3130-v5 MINU/Gap Clearing Kicker Shutdown Schedule Ken Domann Magnets
Main Injector
MINU GPP
25 Feb 2009
3295-v1 Improved Measurement of Main Injector Collimation Efficiency for Uncaptured Beam Bruce C. Brown Collimation
Beam Loss Monitors (BLM)
Proton Plan
02 Feb 2009
3262-v2 Ground Motion Studies At fermilab James T. Volk NuMI
HLRF
ILCTA
16 Jan 2009
3127-v1 Beam Loss in the Superconducting Quadrupoles of Extraction Line for 14 mrad Crossing Angle Alexandr Drozhdin et al. ILCTA
20 Jun 2008
3121-v1 Saving and Restoring Epics devices at HINS and HTS Sharon L. Lackey Proton Driver
Controls
ILCTA
17 Jun 2008
3082-v1 Can we combine the High Energy mu+ and mu- Coalescing Rings into One? Chandrashekhara M. Bhat Muon Collider
29 Apr 2008
2426-v2 MARS15 Calculations for MI8 Collimator Design Bruce C. Brown et al. ES&H
Transfer Lines
Collimation
Proton Plan
22 Apr 2008
2803-v1 Measurement of Booster Beam Halo using the C836A and C838A Collimators in the MI8 Beamline Bruce C. Brown Other
Transfer Lines
Collimation
Beam Loss Monitors (BLM)
Proton Plan
22 Apr 2008
2881-v2 Main Injector Collimation System Hardware Bruce C. Brown ES&H
Collimation
Proton Plan
Operations
22 Apr 2008
3049-v2 Talks presented at the APC General Meeting 03/11/08 Yuri Alexahin et al. Beam Physics
Muon Collider
Beam Studies
Beam Dynamics
12 Mar 2008
2912-v6 Testing 325 MHz Cavities in the ILC IB1 Vertical Test System Bob Webber HLRF
Proton Driver
ILCTA
14 Dec 2007
2883-v1 Booster RF Repetition Rate Limit Robert J. Ducar et al. Upgrades
Projects
Proton Plan
HLRF
26 Sep 2007
2857-v1 Meson HINS/ILCTA LCW System Upgrade Proposal Maurice Ball ILCTA
16 Aug 2007
2840-v1 ILC Test Facilities Sergei Nagaitsev ILCTA
26 Jul 2007
2830-v1 Requirements for a Dark Current Kicker at ILCTA-NML Mike Church et al. Dark Current
ILCTA
05 Jul 2007
2810-v1 On possibility to compensate space charge effects by controlled electron columns Vladimir Shiltsev Beam Dynamics
Beam Dynamics
Transverse Dynamics
Beam Dynamics
SNuMi
13 Jun 2007
2724-v1 Muon Collider ring optics design Yuri Alexahin et al. Muon Collider
Muon Collider R&D
04 Apr 2007
2716-v1 Delivering Muons to the MuCool Test Area Chuck Ankenbrandt et al. Muon Collider
Booster
Linac
Muon Collider R&D
23 Mar 2007
2579-v1 Electron Cloud Instabilities Robert M Zwaska Beam Dynamics
Proton Driver
Instabilities
SNuMi
06 Dec 2006
2479-v2 Operational Aspects of the MI Large Aperture Quadrupole (WQB) Weiren Chou Magnets
Proton Plan
14 Nov 2006
2548-v1 Report from Booster Corrector Review Thomas H Nicol et al. Upgrades
Proton Plan
08 Nov 2006
2488-v1 Beam Profile Diagnostics For the Fermilab Medium Energy Electron Cooler Arden A. Warner Muon Collider
Instrumentation
Electron Cooling
29 Sep 2006
2317-v4 Main Injector HLRF Anode Limit Program & Cavity Tuner RF Voltage Limit Tim G. Berenc et al. RF
HLRF
Proton Plan
14 Sep 2006
2407-v1 DRAFT - The Thin Window Under SNumi Loads Robert Wands SNuMi
22 Aug 2006
2406-v1 Qualification of the Numi Hadron Absorber for Snumi Robert Wands SNuMi
22 Aug 2006
2405-v1 SNuMI Report (on target pile cooling)- August 7 2006. Andy Stefanik SNuMi
22 Aug 2006
2393-v1 Fermilab Proton Projections for Long-Baseline Neutrino Beams Robert M Zwaska Proton Plan
General
SNuMi
16 Aug 2006
2392-v1 Target and Horn Configuration for SNuMI, NOvA, and MINERvA Michael A. Martens SNuMi
15 Aug 2006
2385-v1 Tevatron Luminosity Upgrade Plans Dave McGinnis Run II Upgrades
10 Aug 2006
2381-v1 First Look at Beam-Beam Effects in Muon Collider Alexander A. Valishev Muon Collider
Muon Collider R&D
08 Aug 2006
2341-v1 Booster 30 Hz/Gamma-t Review Eric J Prebys Proton Plan
11 Jul 2006
2339-v1 Prospective Gains from Gamma-t Jump and 2nd Harmonic Magnet Ramp in Fermilab Booster James A. MacLachlan Beam Dynamics
Upgrades
Projects
Studies
Proton Plan
11 Jul 2006
2338-v1 SNuMI plans July 10, 2006 Alberto Marchionni SNuMi
10 Jul 2006
2337-v1 Electron Cloud Studies at Tevatron and Main Injector Xiaolong Zhang Beam Dynamics
Vacuum
Instabilities
Talks
SNuMi
10 Jul 2006
2331-v1 Main Injector HLRF Measurements for Proton Plan Tim G. Berenc RF
HLRF
Proton Plan
07 Jul 2006
2311-v2 Main Injector RF Power Calculations for the Proton Plan Tim G. Berenc et al. RF
HLRF
Proton Plan
30 Jun 2006
2263-v2 Proposal of Studying Electron Cloud and It's Mitigation for Tevatron and Main Injector Upgrades Xiaolong Zhang Beam Dynamics
Vacuum
Studies
SNuMi
13 Jun 2006
2285-v2 Rapid Transfer BPM List as of 6-9-06 (after upgrades) John Van Bogaert BPM
BPM
BPM
Run II Upgrades
Transfer Lines
Transfer Lines
Beam Transfer
09 Jun 2006
2253-v5 Main Injector RF Requirements for a 1.3 Megawatt 120 GeV Proton Source Dave McGinnis HLRF
SNuMi
13 May 2006
1783-v3 Proton Source Scaling Laws Dave McGinnis Projects
Proton Plan
SNuMi
13 May 2006
2226-v1 Proton Stacking in the Recycler Chandrashekhara M. Bhat Beam Dynamics
Beam Dynamics
SNuMi
17 Apr 2006
2240-v1 Rep. Rate and Beam Quality Issues for the Booster in the SNuMI Era Eric J Prebys Upgrades
SNuMi
17 Apr 2006
2220-v1 Losses at AP50 During Stacking Steve Werkema Run II Upgrades
Debuncher
30 Mar 2006
2172-v1 Recycler and MI Momentum Aperture David E. Johnson Studies
Studies
SNuMi
24 Feb 2006
2140-v1 Proton Driver Beam Parameters as Presented to Main Injector Bob Webber Future Accelerators
SNuMi
08 Feb 2006
2138-v1 Beam Emittances and RF structure at Injection into the Main Injector for the Multi-Stage Proton Accumulator Dave McGinnis SNuMi
07 Feb 2006
1569-v1 Tevatron BLM VME J2 Backplane Specification Document Kelly L Knickerbocker TeV ABORT
Instrumentation
Beam Instrumentation
Beam Loss Monitors (BLM)
Beam Instrumentation
10 Feb 2005
1547-v1 Tevatron Abort Loop Status Jerry Annala TeV ABORT
Run II
Status
28 Jan 2005
1545-v1 BLM Upgrade Overview Jonathan D Lewis TeV ABORT
Beam Loss Monitors (BLM)
27 Jan 2005
1470-v1 Communicating Machine States via MDAT to the BLM Upgrade Jonathan D Lewis TeV ABORT
Beam Loss Monitors (BLM)
Beam Instrumentation
23 Nov 2004
1422-v1 Main Injector BLM electronics calibration Alberto Marchionni et al. TeV ABORT
Beam Loss Monitors (BLM)
Beam Instrumentation
25 Oct 2004
1420-v1 Some data on present and new BLM system calibration Stephen Pordes TeV ABORT
Beam Loss Monitors (BLM)
21 Oct 2004
1417-v2 Dynamic Range Issues for New BLM Alan Baumbaugh et al. TeV ABORT
Beam Loss Monitors (BLM)
21 Oct 2004
1340-v2 Talk on new BLM system for Controls Group -- 14 Sept 2004 Jonathan D Lewis TeV ABORT
Beam Loss Monitors (BLM)
13 Sep 2004
1219-v1 Tevatron Abort Gap Monitor Timing Controls Tom Meyer et al. TeV ABORT
Instrumentation
SyncLite (SL)
Intensity Measurements
23 Jun 2004
1176-v1 BLm Crate Count Marv Olson TeV ABORT
Beam Loss Monitors (BLM)
23 May 2004
1171-v1 A0 Abort Timing Bruce Hanna TeV ABORT
20 May 2004
1151-v1 Response to TeV BLM Review (BDoc 1147) Stephen Pordes TeV ABORT
Beam Loss Monitors (BLM)
29 Apr 2004
1147-v1 Tevatron BLM Review Committee Report of meeting on April 19th. Jerry Annala et al. TeV ABORT
28 Apr 2004
1130-v5 TeV BLM Draft Schedule Alan Baumbaugh et al. TeV ABORT
Beam Loss Monitors (BLM)
19 Apr 2004
1131-v1 Tevatron Proposed BLM system review Slides v3 Alan Baumbaugh TeV ABORT
Instrumentation
Beam Loss Monitors (BLM)
19 Apr 2004
1129-v2 TeV BLM requirements Stephen Pordes TeV ABORT
Beam Loss Monitors (BLM)
18 Apr 2004
1127-v2 TeV BLM Test Card Review Docs Craig C Drennan TeV ABORT
Instrumentation
Beam Loss Monitors (BLM)
16 Apr 2004
1128-v2 Tevatron Proposed BLM system review Slides Alan Baumbaugh TeV ABORT
Beam Loss Monitors (BLM)
16 Apr 2004
1126-v1 Tests of BLM Integrator Alan Baumbaugh et al. TeV ABORT
Beam Loss Monitors (BLM)
14 Apr 2004
1125-v1 TeV BLM Abort Setting Rate Marv Olson et al. TeV ABORT
Instrumentation
Beam Loss Monitors (BLM)
14 Apr 2004
1104-v1 tev blm sensitivity and range Stephen Pordes TeV ABORT
Beam Loss Monitors (BLM)
02 Apr 2004
1072-v2 Latched BLMs Jim Patrick et al. TeV ABORT
Beam Loss Monitors (BLM)
31 Mar 2004
1068-v1 A tutorial on beam loss monitoring Robert Shafer TeV ABORT
Beam Loss Monitors (BLM)
10 Mar 2004
1027-v1 Meeting Summary 02/10/04 - summary of doc 992 Stephen Pordes TeV ABORT
Beam Loss Monitors (BLM)
18 Feb 2004
992-v2 Preliminary BLM notions Alan Baumbaugh TeV ABORT
Beam Loss Monitors (BLM)
18 Feb 2004

Number of documents found: 489

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 5 wallclock secs ( 1.02 usr + 0.30 sys = 1.32 CPU)