Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Proton Plan (subtopic of Projects) are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
2201-v4 Beam collimation in the transfer line from 8~GeV linac to the Main Injector Alexandr Drozhdin Proton Plan
Project
Collimation
27 Jan 2012
3752-v1 Booster RF Down Time Analysis (2005) Eric J Prebys Proton Plan
09 Dec 2010
3753-v1 Benefit of 19th Booster RF Cavity Eric J Prebys Proton Plan
09 Dec 2010
3743-v1 Booster Optics Measurements & Correction Yuri Alexahin Beam Dynamics
Proton Plan
07 Dec 2010
3295-v1 Improved Measurement of Main Injector Collimation Efficiency for Uncaptured Beam Bruce C. Brown Beam Loss Monitors (BLM)
Proton Plan
Collimation
02 Feb 2009
2426-v2 MARS15 Calculations for MI8 Collimator Design Bruce C. Brown et al. Proton Plan
Transfer Lines
ES&H
Collimation
22 Apr 2008
2803-v1 Measurement of Booster Beam Halo using the C836A and C838A Collimators in the MI8 Beamline Bruce C. Brown Beam Loss Monitors (BLM)
Proton Plan
Other
Transfer Lines
Collimation
22 Apr 2008
2881-v2 Main Injector Collimation System Hardware Bruce C. Brown Proton Plan
Operations
ES&H
Collimation
22 Apr 2008
2883-v1 Booster RF Repetition Rate Limit Robert J. Ducar et al. Proton Plan
HLRF
Upgrades
Projects
26 Sep 2007
2479-v2 Operational Aspects of the MI Large Aperture Quadrupole (WQB) Weiren Chou Proton Plan
Magnets
14 Nov 2006
2548-v1 Report from Booster Corrector Review Thomas H Nicol et al. Proton Plan
Upgrades
08 Nov 2006
2317-v4 Main Injector HLRF Anode Limit Program & Cavity Tuner RF Voltage Limit Tim G. Berenc et al. RF
HLRF
Proton Plan
14 Sep 2006
2393-v1 Fermilab Proton Projections for Long-Baseline Neutrino Beams Robert M Zwaska Proton Plan
General
SNuMi
16 Aug 2006
2341-v1 Booster 30 Hz/Gamma-t Review Eric J Prebys Proton Plan
11 Jul 2006
2339-v1 Prospective Gains from Gamma-t Jump and 2nd Harmonic Magnet Ramp in Fermilab Booster James A. MacLachlan Beam Dynamics
Proton Plan
Upgrades
Projects
Studies
11 Jul 2006
2331-v1 Main Injector HLRF Measurements for Proton Plan Tim G. Berenc RF
HLRF
Proton Plan
07 Jul 2006
2311-v2 Main Injector RF Power Calculations for the Proton Plan Tim G. Berenc et al. RF
HLRF
Proton Plan
30 Jun 2006
1783-v3 Proton Source Scaling Laws Dave McGinnis Proton Plan
Projects
SNuMi
13 May 2006

Number of documents found: 18

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.25 usr + 0.04 sys = 0.29 CPU)