These documents on Fermilab Main Injector Project (subtopic of Main Injector) are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
5382-v1 MAIN INJECTOR NOTES Bruce C. Brown Project
Design Properties
11 May 2017
4294-v1 The Fermilab Main Injector Technical Design Handbook Management of Main Injector Project Main Injector
Project
Design Properties
15 Feb 2013
2201-v4 Beam collimation in the transfer line from 8~GeV linac to the Main Injector Alexandr Drozhdin Proton Plan
Project
Collimation
27 Jan 2012
2330-v1 Beam collimation in the Main Injector at Slip-Stacking Injection Bruce C. Brown et al. Project
Collimation
09 Jan 2009
2329-v1 Beam Loss Simulation in the Main Injector at Slip-Stacking Injection Bruce C. Brown et al. Project
Collimation
09 Jan 2009
961-v1 Painting injection to the Fermilab Main Injector Alexandr Drozhdin et al. Project
02 Jun 2008
2198-v1 Beam collimation in the Main Injector Bruce C. Brown et al. Project
Collimation
02 Jun 2008
2199-v1 Painting injection at 8~GeV to the Main Injector Alexandr Drozhdin Project
Beam Dynamics
02 Jun 2008
2200-v1 Painting injection at 8~GeV to the Main Injector Alexandr Drozhdin Project
Beam Dynamics
02 Jun 2008
2202-v1 Lifetime of Stark States Hydrogen Atom in Magnetic Field Calculation and Estimation of Losses at Stripping Injection Weiren Chou et al. Project
02 Jun 2008
2324-v1 Induction barrier RF and applications in the Main Injector Weiren Chou Project
Adv. Accelerator R&D
05 Jul 2006
1441-v1 The Proton Plan Bruce Baller et al. RF
Upgrades
Project
Projects
11 Nov 2004
476-v2 2.5 MHz acceleration in the Main Injector Vincent Wu Project
15 Sep 2004
864-v3 Pbar acceleration in the MI using 2.5 MHz and 53 MHz rf Systems Chandrashekhara M. Bhat et al. HLRF
Studies
Operations
Project
LLRF
09 Oct 2003
859-v1 Booster cogging for multiple batch operation of the Main Injector William A Pellico et al. Primary Proton Beam
LLRF
Commissioning
Project
Projects
Studies
02 Oct 2003
629-v1 2 MW Upgrade of the Fermilab Main Injector Weiren Chou Future Accelerators
Project
28 May 2003
212-v2 Short Summary of my Visit to Fermilab Charles Steinbach Extraction
HLRF
Project
10 Sep 1996
149-v2 Thoughts on FMI Application Programming, CHEP95 and the Main Injector C. Shekhar Mishra Controls
Other
Project
05 Oct 1995
102-v1 MIDB Users and Uses Rachid Baiod et al. Magnets
Project
24 Jan 1994
98-v1 FMI PCS Self Assessment Report Management of Main Injector Project Project
29 Oct 1993

Number of documents found: 20

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.18 usr + 0.03 sys = 0.21 CPU)