Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Pertains to elements that transport protons to the NuMI target. Includes the monitoring equipment ahead of the target. (subtopic of NuMI) are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
3159-v1 Delivering High Intensity Proton Beam; Lessons for the Next Beam Generations Samuel R. Childress Primary Proton Beam
NuMI
15 Jul 2008
2390-v1 The NuMI Beam System: First Year of Operation Samuel R. Childress Extraction from Main Injector
Target Hall Systems
Primary Proton Beam
14 Aug 2006
1989-v1 The NuMI Beam System:Commissioning & Initial Operation Samuel R. Childress Primary Proton Beam
Commissioning
13 Oct 2005
1745-v1 Numi Beamline Optics study, March 14, 2005 Ming-jen Yang Primary Proton Beam
Transfer Lines
Optics
22 Mar 2005
1435-v1 The NUMI Beamline Samuel R. Childress et al. Extraction from Main Injector
Target Hall Systems
Focusing Horns
Monitoring Instrumentation
Primary Proton Beam
Commissioning
Run II
04 Nov 2004
1416-v1 Note on BPM Sensitivity Scale Factors for NuMI BPM System Bob Webber Monitoring Instrumentation
Primary Proton Beam
General
Commissioning
BPM
BPM
18 Oct 2004
1323-v3 MI beam orbit verifier specifications for the NuMI Beam Permit System Andrew Godley Extraction from Main Injector
Beam Instrumentation
Monitoring Instrumentation
Primary Proton Beam
Controls
BPM
07 Sep 2004
1036-v1 Beam to NuMI Peter Kasper Primary Proton Beam
24 Feb 2004
918-v1 Talks given at NBI2003 in KEK by Bob Zwaska Robert M Zwaska Dampers
Extraction from Main Injector
Monitoring Instrumentation
Primary Proton Beam
Commissioning
Upgrades
Commissioning
18 Nov 2003
889-v1 NuMI Primary Beam Design Report Samuel R. Childress et al. Primary Proton Beam
30 Oct 2003
859-v1 Booster cogging for multiple batch operation of the Main Injector William A Pellico et al. Primary Proton Beam
LLRF
Commissioning
Project
Projects
Studies
02 Oct 2003
728-v1 MI60 Quad Offsets for NuMI David E. Johnson Primary Proton Beam
Installation
Alignment
Alignment
11 Jul 2003

Number of documents found: 12

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.23 usr + 0.04 sys = 0.27 CPU)