Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Pertains to elements that transport protons to the NuMI target. Includes the monitoring equipment ahead of the target. (subtopic of NuMI) are available:
Showing documents with any version with topic Pertains to elements that transport protons to the NuMI target. Includes the monitoring equipment ahead of the target.. See documents with Primary Proton Beam only on the most recent version.

Beams-doc-# Title Author(s) Topic(s) Last Updated
3159-v1 Delivering High Intensity Proton Beam; Lessons for the Next Beam Generations Samuel R. Childress Primary Proton Beam
NuMI
15 Jul 2008
2390-v1 The NuMI Beam System: First Year of Operation Samuel R. Childress Extraction from Main Injector
Target Hall Systems
Primary Proton Beam
14 Aug 2006
1989-v1 The NuMI Beam System:Commissioning & Initial Operation Samuel R. Childress Primary Proton Beam
Commissioning
13 Oct 2005
1745-v1 Numi Beamline Optics study, March 14, 2005 Ming-jen Yang Primary Proton Beam
Transfer Lines
Optics
22 Mar 2005
1435-v1 The NUMI Beamline Samuel R. Childress et al. Extraction from Main Injector
Target Hall Systems
Focusing Horns
Monitoring Instrumentation
Primary Proton Beam
Commissioning
Run II
04 Nov 2004
1416-v1 Note on BPM Sensitivity Scale Factors for NuMI BPM System Bob Webber Monitoring Instrumentation
Primary Proton Beam
General
Commissioning
BPM
BPM
18 Oct 2004
1323-v3 MI beam orbit verifier specifications for the NuMI Beam Permit System Andrew Godley Extraction from Main Injector
Beam Instrumentation
Monitoring Instrumentation
Primary Proton Beam
Controls
BPM
07 Sep 2004
1036-v1 Beam to NuMI Peter Kasper Primary Proton Beam
24 Feb 2004
918-v1 Talks given at NBI2003 in KEK by Bob Zwaska Robert M Zwaska Dampers
Extraction from Main Injector
Monitoring Instrumentation
Primary Proton Beam
Commissioning
Upgrades
Commissioning
18 Nov 2003
889-v1 NuMI Primary Beam Design Report Samuel R. Childress et al. Primary Proton Beam
30 Oct 2003
859-v1 Booster cogging for multiple batch operation of the Main Injector William A Pellico et al. Primary Proton Beam
LLRF
Commissioning
Project
Projects
Studies
02 Oct 2003
728-v1 MI60 Quad Offsets for NuMI David E. Johnson Primary Proton Beam
Installation
Alignment
Alignment
11 Jul 2003

Number of documents found: 12

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.15 usr + 0.02 sys = 0.17 CPU)