Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Pertains to the systems installed in the NuMI Target Hall and adjacent power supply rooms. (subtopic of NuMI) are available:
Showing documents with topic Pertains to the systems installed in the NuMI Target Hall and adjacent power supply rooms. on the most recent version. See documents with Target Hall Systems on any version.

Beams-doc-# Title Author(s) Topic(s) Last Updated
6510-v1 Proposal for upgrading the NuMI horn field-mapping system Adam Watts Target Hall Systems
NuMI
17 Jul 2018
6482-v1 NuMI Target Replacement Decision Briefing Robert M Zwaska Target Hall Systems
NuMI
26 Jun 2018
5355-v1 The Challenges of Next Generation Neutrino Beam Targetry Patrick G. Hurh et al. Target Hall Systems
NOvA
NuMI
23 Mar 2017
2390-v1 The NuMI Beam System: First Year of Operation Samuel R. Childress Extraction from Main Injector
Target Hall Systems
Primary Proton Beam
14 Aug 2006
1435-v1 The NUMI Beamline Samuel R. Childress et al. Extraction from Main Injector
Target Hall Systems
Commissioning
Focusing Horns
Monitoring Instrumentation
Primary Proton Beam
Run II
04 Nov 2004
724-v1 Optimization Studies of Beam Optics for the Low Energy Neutrino Production Valeriy I. Garkusha et al. Target Hall Systems
Focusing Horns
09 Jan 2004
735-v1 Locating the neutrino beam elements Adam Para Target Hall Systems
Commissioning
Focusing Horns
Monitoring Instrumentation
Alignment
16 Jul 2003
734-v1 Cross-Hair System Performance Requirements Deborah Harris Target Hall Systems
Monitoring Instrumentation
Alignment
16 Jul 2003
730-v1 Proposal for Continuously-Variable Beam Energy Deborah Harris et al. Target Hall Systems
15 Jul 2003
729-v1 Technical Design of the Target Pile Protection Baffle Valeriy I. Garkusha et al. Target Hall Systems
14 Jul 2003
723-v1 Further Studies of Target for the Low Energy NuMI Beam Valeriy I. Garkusha et al. Target Hall Systems
09 Jul 2003
716-v1 Preliminary Design Work and Neutrino Beam Calculations for the NuMI Project Valeriy I. Garkusha et al. Target Hall Systems
Focusing Horns
08 Jul 2003
715-v1 Conceptual Design Work and Neutrino Beam Calculations for the NuMI Project Valeriy I. Garkusha et al. Target Hall Systems
Focusing Horns
08 Jul 2003
714-v1 Preliminary Design Work on NBB Absorber and Target Prototype Valeriy I. Garkusha et al. Target Hall Systems
07 Jul 2003
712-v1 Monitoring NuMI Target Alex V. Kulik Target Hall Systems
07 Jul 2003
711-v1 Advanced Conceptual Design of the Full-Scale Fin Target and Engineering Design of the Target Prototypes for the NuMI Project Valeriy I. Garkusha et al. Target Hall Systems
General
03 Jul 2003
706-v1 Advanced Conceptual Design of the Low Energy Target and Beam Plug Valeriy I. Garkusha et al. Target Hall Systems
03 Jul 2003
707-v1 Comparison of Initial Conceptual Designs of the Low Energy Target Valeriy I. Garkusha et al. Target Hall Systems
03 Jul 2003
709-v1 Proposed Test of NuMI Prototype Target in Main Injector Beam Valeriy I. Garkusha et al. Target Hall Systems
03 Jul 2003
676-v1 Dynamic Stress Calculations for ME and LE Targets and Results of Prototyping for the LE Target Valeriy I. Garkusha et al. Target Hall Systems
20 Jun 2003
843-v1 Temperature and Stresses in the LE Target with 6.4 mm Wide Segments Valeriy I. Garkusha et al. Target Hall Systems
20 Jun 2001

Number of documents found: 21

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.23 usr + 0.05 sys = 0.28 CPU)