Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on instrumentation downstream of NuMI target (subtopic of NuMI) are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
1813-v1 A First Look at NuMI Intensity Measuring Device Calibration Daniel D Cherdack Monitoring Instrumentation
DCCTs
16 Feb 2017
2439-v1 NuMI and Rapid Transfer BPM Test Application Program Specifications Duane C Voy Monitoring Instrumentation
BPM
06 Sep 2006
1978-v2 Memo on Preliminary Values for MI BPM Polynomial Coefficients Bob Webber Extraction from Main Injector
Beam Instrumentation
Monitoring Instrumentation
BPM
BPM
BPM
03 Oct 2005
1322-v2 Main Injector/NuMI BPM Scaling - Analysis of Main Injector HP602 and HP604 BPM Data from Traditional Main Injector and NuMI BPM Systems Bob Webber Beam Instrumentation
General
Commissioning
Monitoring Instrumentation
BPM
BPM
03 Oct 2005
1378-v2 NUMI MI Batch by Batch Intensity Measurements Alexei Semenov Beam Instrumentation
Intensity Measurements
Monitoring Instrumentation
Talks
Instrumentation/beam Physics
18 Mar 2005
1527-v1 Description of the ACNET devices that control the Main Injector inputs to the NuMI Beam Permit System Andrew Godley Extraction from Main Injector
Beam Instrumentation
Intensity Measurements
Monitoring Instrumentation
14 Jan 2005
1435-v1 The NUMI Beamline Samuel R. Childress et al. Extraction from Main Injector
Target Hall Systems
Commissioning
Focusing Horns
Monitoring Instrumentation
Primary Proton Beam
Run II
04 Nov 2004
1412-v2 Numi BPM Measurement Data James A. Fitzgerald Beam Instrumentation
Monitoring Instrumentation
BPM
19 Oct 2004
1416-v1 Note on BPM Sensitivity Scale Factors for NuMI BPM System Bob Webber General
Commissioning
Monitoring Instrumentation
Primary Proton Beam
BPM
BPM
18 Oct 2004
1323-v3 MI beam orbit verifier specifications for the NuMI Beam Permit System Andrew Godley Extraction from Main Injector
Beam Instrumentation
Monitoring Instrumentation
Primary Proton Beam
Controls
BPM
07 Sep 2004
1210-v2 NuMI Transition Module Calibration Procedure Peter Prieto Monitoring Instrumentation
BPM
22 Jun 2004
1212-v1 NuMI Calibration Board Test Procedure Peter Prieto Monitoring Instrumentation
BPM
22 Jun 2004
1211-v1 NuMI BPM Pre-Installation Preparation Peter Prieto Monitoring Instrumentation
BPM
22 Jun 2004
1209-v1 NuMI Transition Module Description Peter Prieto Monitoring Instrumentation
BPM
22 Jun 2004
1192-v3 NuMi BPM Sign Convention and Signal Path Peter Prieto Monitoring Instrumentation
BPM
22 Jun 2004
1193-v1 NuMI Toroid Scope and Functionality Peter Prieto Monitoring Instrumentation
04 Jun 2004
918-v1 Talks given at NBI2003 in KEK by Bob Zwaska Robert M Zwaska Dampers
Extraction from Main Injector
Commissioning
Monitoring Instrumentation
Primary Proton Beam
Commissioning
Upgrades
18 Nov 2003
736-v1 Coupling Between Adjacent BPMs James L. Crisp Monitoring Instrumentation
BPM
BPM
17 Jul 2003
735-v1 Locating the neutrino beam elements Adam Para Target Hall Systems
Commissioning
Focusing Horns
Monitoring Instrumentation
Alignment
16 Jul 2003
734-v1 Cross-Hair System Performance Requirements Deborah Harris Target Hall Systems
Monitoring Instrumentation
Alignment
16 Jul 2003

Number of documents found: 20

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.26 usr + 0.03 sys = 0.29 CPU)