These documents on Main Injector Project Civil Construction (subtopic of Main Injector) are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
5042-v1 Tipping Analysis for 3 Point Stands Kris A Anderson Other
Other
Civil
Other
Magnets
Magnets
Design Properties
11 Jan 2016
213-v1 Main Injector and Beamline Naming Conventions David E. Johnson et al. Controls
Civil
Lattice
08 Jul 2003
347-v1 Single Turn Extraction Design for NuMI David E. Johnson Extraction
Extraction from Main Injector
Civil
Civil Construction
Design Properties
06 Jan 2000
343-v1 Microbiologically Influenced Corrosion in the Main Injector Magnet Low Conductivity Water Patrick G. Hurh Studies
Civil
Water
04 Mar 1999
341-v3 The Main Injector SBD for Studiers Willem Blokland et al. Beam Instrumentation
Sampled Bunch Display (SBD)
LabVIEW
Acnet
Console Applications
Data Acquisition
15 Feb 1999
332-v1 Determination of Interlock Gate Locations at E35, F47, and A25 Anthony F. Leveling Studies
Civil
ES&H
15 Sep 1998
331-v2 Effect of FO Crossover Shielding Field Change Anthony F. Leveling Civil
ES&H
21 Jul 1998
294-v1 Magnet Orientations in Beamlines David E. Johnson Alignment
Civil
Magnets
Transfer Lines
Alignment
30 May 1997
235-v1 Groundwater, Air-Borne and Soil Activation from the Operation of the Temporary Beam Absorber in the MI-8 GeV Beam Line Chandrashekhara M. Bhat et al. Civil
ES&H
25 Jan 1997
224-v1 8 GeV Line Instrumentation: Locations and Rack Layouts Gregory L. Vogel Beam Instrumentation
Civil
29 Oct 1996
171-v2 MI-10 Injection Layout David E. Johnson Civil
Transfer Lines
17 May 1996
118-v1 Main Injector Era Backfeed Recommendations Cezary A. Jach Civil
Power Supplies
AC Power
09 Jan 1996
152-v1 Main Injector Dipole Magnets Placement in MI62 and MI10 C. Shekhar Mishra Civil
Magnets
20 Dec 1995
100-v1 Radiation Levels in the MI-60 Enclosure from Tevatron Beam Losses Chandrashekhara M. Bhat Civil
ES&H
Beam Dynamics
08 Nov 1993
88-v3 Radiation Shieldings for MI Culverts Chandrashekhara M. Bhat Civil
ES&H
Design Properties
01 Aug 1993
74-v1 How Long is a 'Foot'? Allison D. Russell Alignment
Civil
30 Jun 1992
69-v1 Estimation of the Effective Pumping Speed for Two Installation Geometries Shuxiu Zhang Vacuum
Civil
Vacuum
27 Sep 1991
56-v1 Change in Nomenclature for the Main Injector Philip S. Martin Civil
Lattice
12 Apr 1991
48-v1 Location of Main Injector Relative to Tevatron Stephen G. Peggs Civil
Beam Transfer
05 Feb 1991
700-v1 Sloping the Main Injector Philip S. Martin Civil
Design Properties
22 Jun 1990

Number of documents found: 20

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.22 usr + 0.04 sys = 0.26 CPU)