These documents on Pertains to the procedures and methods to ready installed systems for beam operations (subtopic of NuMI) are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
1989-v1 The NuMI Beam System:Commissioning & Initial Operation Samuel R. Childress Commissioning
Primary Proton Beam
13 Oct 2005
1322-v2 Main Injector/NuMI BPM Scaling - Analysis of Main Injector HP602 and HP604 BPM Data from Traditional Main Injector and NuMI BPM Systems Bob Webber Beam Instrumentation
Monitoring Instrumentation
Commissioning
BPM
BPM
General
03 Oct 2005
1435-v1 The NUMI Beamline Samuel R. Childress et al. Extraction from Main Injector
Target Hall Systems
Focusing Horns
Monitoring Instrumentation
Commissioning
Run II
Primary Proton Beam
04 Nov 2004
1416-v1 Note on BPM Sensitivity Scale Factors for NuMI BPM System Bob Webber Monitoring Instrumentation
Commissioning
Primary Proton Beam
BPM
BPM
General
18 Oct 2004
1277-v1 Booster Cogging: Synchronization with the Main Injector for NuMI & Slip-Stacking Robert M Zwaska LLRF
Commissioning
Commissioning
LLRF
29 Jul 2004
918-v1 Talks given at NBI2003 in KEK by Bob Zwaska Robert M Zwaska Dampers
Extraction from Main Injector
Upgrades
Monitoring Instrumentation
Commissioning
Primary Proton Beam
Commissioning
18 Nov 2003
859-v1 Booster cogging for multiple batch operation of the Main Injector William A Pellico et al. LLRF
Commissioning
Project
Primary Proton Beam
Projects
Studies
02 Oct 2003
735-v1 Locating the neutrino beam elements Adam Para Target Hall Systems
Focusing Horns
Monitoring Instrumentation
Commissioning
Alignment
16 Jul 2003

Number of documents found: 8

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.21 usr + 0.03 sys = 0.24 CPU)