Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Transport for 8 GeV Booster Beam to the MiniBooNE experimental target enclosure (subtopic of External Beams) and sub-topics are available:
Showing documents with topic Transport for 8 GeV Booster Beam to the MiniBooNE experimental target enclosure on the most recent version. See documents with MiniBooNE on any version.

Beams-doc-# Title Author(s) Topic(s) Last Updated
6771-v12 BNB Accelerator Timing Signal Availability Alyssa R Miller MiniBooNE
External Beams
Controls
Hardware
14 Nov 2019
6991-v1 Analysis of BNB Target Position Scan Performed 2018.10.31 Alyssa R Miller Studies
MiniBooNE
External Beams
11 Feb 2019
6904-v8 Bunch Rotation in the Booster Neutrino Beamline Thomas R. Kobilarcik Studies
MiniBooNE
External Beams
10 Jan 2019
4776-v3 Magnetic Field Measurements in the BnB 25 Meter Absorber Michael R Backfish MiniBooNE
External Beams
06 Jul 2017
5242-v1 MiniBooNE Resistive Wall Current Monitor Michael R Backfish MiniBooNE
External Beams
03 Oct 2016
5049-v2 Kicking the Booster Neutrino Beam Off Target Thomas R. Kobilarcik MiniBooNE
21 Jan 2016
5000-v1 Measuring the Bunch Length of the Booster Neutrino Beamline Beam Michael R Backfish MiniBooNE
External Beams
12 Nov 2015
4825-v3 Booster Neutrino Beamline Decay Pipe Inspection Thomas R. Kobilarcik Studies
21 May 2015
4573-v1 The Booster Neutrino Beamline Thomas R. Kobilarcik MiniBooNE
Accelerator Seminar
17 Apr 2014
3483-v1 LBNE - Lattice Optics (opus #1) John A. Johnstone Studies
Optics
25 Oct 2009
1900-v1 Report to the Fermilab Director by the Proton Committee Chuck Ankenbrandt et al. MiniBooNE
General
Upgrades
Operations
18 Jul 2005

Number of documents found: 11

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.18 usr + 0.02 sys = 0.20 CPU)