Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Transport of 120 GeV Main Injector Beams (subtopic of External Beams) and sub-topics are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
5353-v2 Investigation Into MI52 Septa Wire Failures Michael R Backfish Main Injector
SY120
Beam Physics
23 Mar 2017
5323-v1 Measurement of Elliptical Beam Emittance in the Transverse Plane Adam Watts External Beams
Transverse Dynamics
SY120
Instrumentation
Transfer Lines
Instrumentation
Optics
Beam Physics
Beam Dynamics
08 Feb 2017
5225-v1 Simulated Tomography of Beam Transverse Phase Space Adam Watts External Beams
SY120
Instrumentation
Optics
Beam Physics
01 Sep 2016
5155-v1 Status of Switchyard Berm Pipe Cathodic Protection Adam Watts SY120
11 May 2016
5040-v2 Magnetic Control of Fermilab Switchyard Beam Splits Adam Watts External Beams
Transverse Dynamics
SY120
24 Feb 2016
4994-v5 Effects of Rough Vacuum in the P3 Beamline Adam Watts SY120
Main Ring
02 Feb 2016
5030-v1 Neutrino-Muon beamline emittance Carol J. Johnstone et al. External Beams
SY120
Studies
Optics
17 Dec 2015
4915-v2 A Preliminary Beam Permit System for the Neutrino-Muon Beamline Adam Watts External Beams
SY120
Controls
06 Aug 2015
4886-v1 Operational Methods For Delivering Meson Test Beam to Fermi Test Beam Facility Michael R Backfish Operations
External Beams
SY120
MTEST
16 Jul 2015
4396-v1 Switchyard 120 Cathodic Protection Status Michael I Geelhoed SY120
27 Jun 2013
4375-v2 NM3 Beam Cherenkov Michael I Geelhoed SY120
26 Jun 2013
4146-v2 Integration of ORKA and SY120 Thomas R. Kobilarcik SY120
26 Jun 2012
4076-v2 E906 Beam Status Michael I Geelhoed SY120
20 Feb 2012
4000-v7 HDPE Berm Pipe Radiation Integrity Michael I Geelhoed SY120
08 Dec 2011
4010-v2 HDPE Berm Pipe Aperture Michael I Geelhoed SY120
05 Dec 2011
4009-v4 Berm Pipe Aperture V 4 Michael I Geelhoed SY120
01 Dec 2011
4011-v1 HDPE Vacuum Michael I Geelhoed SY120
29 Nov 2011
4001-v3 Neutrino Muon Beamline Optics Michael I Geelhoed SY120
22 Nov 2011
3090-v1 Tevatron Fixed Target Redux and the NuSOnG Proposal Michael J. Syphers Extraction
Main Injector
External Beams
SY120
Tevatron
06 May 2008
2849-v2 Discussion of Tevatron Fixed Target Options after Run II Michael J. Syphers General
SY120
13 Feb 2008
2222-v1 Tevatron 120 -- Life after Run II? Michael J. Syphers General
SY120
MIPP
CKM
MTEST
03 Apr 2006
2178-v2 First Report of the Proton Study Group Sergei Nagaitsev et al. Other
General
SY120
Operations
Upgrades
03 Apr 2006
1943-v1 Measurement of Switchyard Phase Space 18Aug05 Thomas R. Kobilarcik SY120
31 Aug 2005
1837-v1 A Proposal to Upgrade the Switchyard BPM Brajesh Choudhary SY120
BPM
BPM
20 May 2005
1750-v1 SY120 BPM Electronics Measurements James A. Fitzgerald Extraction
SY120
BPM
23 Mar 2005
1429-v2 Stacking and SY120 Pulses Dave McGinnis Accumulator
SY120
04 Nov 2004
1387-v3 Thoughts on SY120 Operation in FY'05 David E. Johnson SY120
01 Nov 2004
1403-v1 Bucker Learning Algorithm For Slow Spill Peter Prieto SY120
13 Oct 2004
1316-v1 SY120 Mixed-mode Operation David E. Johnson Transfer Lines
SY120
Transfer Lines
24 Aug 2004
1242-v2 Potential Optical Solutions For Pbar Stacking and SY120 Mixed-Mode Operation David E. Johnson SY120
07 Jul 2004
1120-v1 SY120Jamboree: Resonant Extraction Status and Plans David E. Johnson SY120
13 Apr 2004

Number of documents found: 31

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.23 usr + 0.04 sys = 0.27 CPU)