Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Operational Issues for the Main Injector (subtopic of Main Injector) are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
5318-v1 Fermilab Proton Improvement Plans Vladimir Shiltsev General
Operations
Beam Physics
26 Jan 2017
5153-v1 MIBLMS Open Access Client Kyle J Hazelwood Controls
Beam Instrumentation
Beam Loss Monitors (BLM)
Beam Instrumentation
Alarms
Operations
Controls
Operations
06 May 2016
4692-v1 Loss History in Main Injector: LI619A-LI621 and LI101C-LI107 Bruce C. Brown Beam Loss Monitors (BLM)
Operations
BPM
28 Oct 2014
4617-v1 Main Injector Pond temperatures David P Capista Operations
12 Jun 2014
3991-v1 Proposal to Create a Tomoscope Application for the Fermilab Main Injector Jerry Cai et al. Controls
Beam Instrumentation
Operations
Beam Dynamics
09 Nov 2011
3629-v1 Loss and Residual Radiation at MI400 for 2010 Shutdown Preparation Bruce C. Brown Beam Instrumentation
Beam Loss Monitors (BLM)
Operations
Collimation
16 Jun 2010
3568-v1 Predicting Residual Radiation using Beam Loss Data - Early Results Bruce C. Brown Beam Instrumentation
Beam Loss Monitors (BLM)
Operations
MI-Dept
ES&H
11 Mar 2010
3299-v2 Some Console Applications for Displaying Main Injector BLM Measurements Bruce C. Brown et al. Beam Instrumentation
Beam Loss Monitors (BLM)
Operations
Collimation
Console Applications
24 Jun 2009
3219-v1 Analysis of Some Crude Main Injector Radiation Cool-down Data Bruce C. Brown Operations
ES&H
03 Oct 2008
1930-v1 Un-suppressing MI30 dispersion function for momentum scraping David E. Johnson et al. Operations
Lattice
Collimation
22 Apr 2008
2881-v2 Main Injector Collimation System Hardware Bruce C. Brown Operations
Collimation
Proton Plan
ES&H
22 Apr 2008
3045-v6 Gap Cleaning in the MI using RF Barrier Weiren Chou et al. Extraction
Operations
HLRF
HLRF
29 Feb 2008
2674-v1 Main Injector stray beam clearing options Ming-jen Yang Operations
05 Mar 2007
1940-v3 Mask at MI Q301 David E. Johnson Operations
02 Sep 2005
1938-v1 Impact of beam loss in MI 30 Straight Section on ECOOL David E. Johnson Operations
23 Aug 2005
1910-v1 Main Injector Operations in the Future Ioanis Kourbanis Operations
BPM
29 Jul 2005
1428-v1 Run 2 Operational Status and Plans for FY05 Dave McGinnis Operations
Operations
Operations
Operations
Operations
01 Nov 2004
1425-v3 MI SBD Specifications Chandrashekhara M. Bhat Beam Instrumentation
Operations
29 Oct 2004
1157-v1 Redefining MI 8 GeV Energy, a Proposal David E. Johnson Operations
04 May 2004
1140-v1 Redefining MI 8 GeV Energy to Maximize Pbar Production David E. Johnson Operations
Operations
23 Apr 2004
864-v3 Pbar acceleration in the MI using 2.5 MHz and 53 MHz rf Systems Chandrashekhara M. Bhat et al. Studies
Operations
Project
LLRF
HLRF
09 Oct 2003
756-v2 NuMI Extraction Geometry with Current Main Injector Orbits, Quad Offsets, and Correctors David E. Johnson Extraction from Main Injector
Operations
13 Aug 2003
633-v1 A New Antiproton Beam Transfer Scheme without Coalescing Weiren Chou et al. Studies
Longitudinal Dynamics
LLRF
Operations
Beam Dynamics
Beam Transfer
Multiparticle
28 May 2003
364-v1 Notes for MI/RR Group Meeting of 23 Sep 2002 Bruce C. Brown RF
Studies
Operations
MI-RR-Group
Operations
13 Jan 2003
333-v2 Main Injector Commissioning Plan C. Shekhar Mishra Beam Instrumentation
Operations
Commissioning
22 Jul 1998

Number of documents found: 25

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.26 usr + 0.04 sys = 0.30 CPU)