Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Collimation for Main Injector and Transfer Lines (subtopic of Main Injector) are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
4046-v3 Activation of Steel and Copper Samples in the Main Injector Collimator Region Bruce C. Brown Energy Deposition
Collimation
ES&H
01 Jun 2017
4896-v2 Collimation Design using Reduced Courant-Snyder Coordinates Bruce C. Brown Energy Deposition
Lattice
Collimation
27 May 2016
4982-v2 Aperture Implications for Recycler Assuming Full Coupling and Nominal Vertical Apertures Bruce C. Brown Collimation
Collimation
Lattice
12 May 2016
4867-v1 Calibration of BLM Response to Proton Loss Bruce C. Brown Beam Instrumentation
Beam Loss Monitors (BLM)
Collimation
ES&H
30 Jun 2015
4460-v1 A Collimation Mask at MI308 to Protect RR to MI Injection Kickers Bruce C. Brown Collimation
15 Oct 2013
4457-v1 Replacement Primary Collimator for Main Injector Bruce C. Brown et al. Collimation
02 Oct 2013
3980-v2 Analysis Procedures for Al Activation Studies Bruce C. Brown Beam Instrumentation
Energy Deposition
Beam Loss Monitors (BLM)
Collimation
ES&H
09 Apr 2012
2201-v4 Beam collimation in the transfer line from 8~GeV linac to the Main Injector Alexandr Drozhdin Project
Collimation
Proton Plan
27 Jan 2012
3857-v1 Main Injector Counterwave Properties and MI300 Collimator Motion Limits Bruce C. Brown Lattice
Transfer Lines
Collimation
Console Applications
Transfer Lines
26 Apr 2011
3629-v1 Loss and Residual Radiation at MI400 for 2010 Shutdown Preparation Bruce C. Brown Beam Instrumentation
Beam Loss Monitors (BLM)
Operations
Collimation
16 Jun 2010
3299-v2 Some Console Applications for Displaying Main Injector BLM Measurements Bruce C. Brown et al. Beam Instrumentation
Beam Loss Monitors (BLM)
Operations
Collimation
Console Applications
24 Jun 2009
3295-v1 Improved Measurement of Main Injector Collimation Efficiency for Uncaptured Beam Bruce C. Brown Beam Loss Monitors (BLM)
Collimation
Proton Plan
02 Feb 2009
2330-v1 Beam collimation in the Main Injector at Slip-Stacking Injection Bruce C. Brown et al. Project
Collimation
09 Jan 2009
2329-v1 Beam Loss Simulation in the Main Injector at Slip-Stacking Injection Bruce C. Brown et al. Project
Collimation
09 Jan 2009
2198-v1 Beam collimation in the Main Injector Bruce C. Brown et al. Project
Collimation
02 Jun 2008
1930-v1 Un-suppressing MI30 dispersion function for momentum scraping David E. Johnson et al. Operations
Lattice
Collimation
22 Apr 2008
1960-v1 Potential MI Collimation Scheme with MI30 Dynamic Dispersion Insert David E. Johnson Lattice
Collimation
22 Apr 2008
2261-v2 Potential Collimation Scheme using a Dynamic Dispersin Bump In MI30 Straight David E. Johnson Lattice
Collimation
22 Apr 2008
2316-v1 Thoughts on Collimation David E. Johnson Other
Collimation
22 Apr 2008
2315-v3 Dynamic Dispersion for Main Injector Collimation David E. Johnson Lattice
Collimation
22 Apr 2008
1926-v2 Reducing Losses in Main Injector by MI8 Line Scraping Bruce C. Brown et al. Studies
Transfer Lines
Collimation
Electron Cooling
22 Apr 2008
1977-v1 MI8 Beamline Collimation Design Bruce C. Brown Transfer Lines
Collimation
22 Apr 2008
2287-v1 Mechanical Design of MI8 Collimators Bruce C. Brown et al. Transfer Lines
Collimation
22 Apr 2008
2299-v1 Alignment Check for MI8 Collimators Bruce C. Brown Transfer Lines
Collimation
Alignment
22 Apr 2008
2388-v2 Thermal Calculation for MI8 Collimators Bruce C. Brown et al. Transfer Lines
Collimation
22 Apr 2008
2426-v2 MARS15 Calculations for MI8 Collimator Design Bruce C. Brown et al. Transfer Lines
Collimation
Proton Plan
ES&H
22 Apr 2008
2618-v1 First Results from MI8 Collimator Use Phil Adamson et al. Studies
Transfer Lines
Collimation
ES&H
22 Apr 2008
2803-v1 Measurement of Booster Beam Halo using the C836A and C838A Collimators in the MI8 Beamline Bruce C. Brown Beam Loss Monitors (BLM)
Other
Transfer Lines
Collimation
Proton Plan
22 Apr 2008
2881-v2 Main Injector Collimation System Hardware Bruce C. Brown Operations
Collimation
Proton Plan
ES&H
22 Apr 2008

Number of documents found: 29

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.24 usr + 0.03 sys = 0.27 CPU)