Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Main Injector Transfer Lines (subtopic of Main Injector) are available:

Beams-doc-# Title Author(s) Topic(s) Last Updated
4184-v1 MI8 line at Recycler Energy Ming-jen Yang Transfer Lines
Beamline
Transfer Lines
27 Jul 2012
3857-v1 Main Injector Counterwave Properties and MI300 Collimator Motion Limits Bruce C. Brown Lattice
Transfer Lines
Collimation
Console Applications
Transfer Lines
26 Apr 2011
3648-v1 P1 line to Tevatron injection lattice study Ming-jen Yang Transfer Lines
Optics
Beam Transfer
02 Aug 2010
3529-v1 Expected Activation of SmCo5 Beam Line Magnets Bruce C. Brown Transfer Lines
Magnets
ES&H
NOvA
05 Jan 2010
1926-v2 Reducing Losses in Main Injector by MI8 Line Scraping Bruce C. Brown et al. Studies
Transfer Lines
Collimation
Electron Cooling
22 Apr 2008
1977-v1 MI8 Beamline Collimation Design Bruce C. Brown Transfer Lines
Collimation
22 Apr 2008
2287-v1 Mechanical Design of MI8 Collimators Bruce C. Brown et al. Transfer Lines
Collimation
22 Apr 2008
2299-v1 Alignment Check for MI8 Collimators Bruce C. Brown Transfer Lines
Collimation
Alignment
22 Apr 2008
2388-v2 Thermal Calculation for MI8 Collimators Bruce C. Brown et al. Transfer Lines
Collimation
22 Apr 2008
2426-v2 MARS15 Calculations for MI8 Collimator Design Bruce C. Brown et al. Transfer Lines
Collimation
Proton Plan
ES&H
22 Apr 2008
2618-v1 First Results from MI8 Collimator Use Phil Adamson et al. Studies
Transfer Lines
Collimation
ES&H
22 Apr 2008
2803-v1 Measurement of Booster Beam Halo using the C836A and C838A Collimators in the MI8 Beamline Bruce C. Brown Beam Loss Monitors (BLM)
Other
Transfer Lines
Collimation
Proton Plan
22 Apr 2008
2769-v1 Results of pre-WQB installation Lambertson Scans David E. Johnson et al. Lattice
Transfer Lines
Alignment
04 May 2007
2285-v2 Rapid Transfer BPM List as of 6-9-06 (after upgrades) John Van Bogaert Transfer Lines
Transfer Lines
Run II Upgrades
Beam Transfer
BPM
BPM
BPM
09 Jun 2006
2121-v1 SNS visit David E. Johnson Transfer Lines
Proton Driver
28 Mar 2006
1745-v1 Numi Beamline Optics study, March 14, 2005 Ming-jen Yang Transfer Lines
Primary Proton Beam
Optics
22 Mar 2005
1573-v1 Multipole fields in Booster extraction septum MP02 Ming-jen Yang Transfer Lines
Extraction Lattice
11 Feb 2005
1394-v1 MI8 line measurement, March 2004 Ming-jen Yang Studies
Lattice
Transfer Lines
MI-Dept
Optics
05 Oct 2004
1316-v1 SY120 Mixed-mode Operation David E. Johnson Transfer Lines
SY120
Transfer Lines
24 Aug 2004
1307-v1 Study of Main Injector BLT Nicole Michelotti Beam Instrumentation
Transfer Lines
Beam Line Tuner (BLT)
17 Aug 2004
1092-v1 A1 Beamline Pics and March 23rd OTR Meeting Minutes Vic Scarpine OTR
Transfer Lines
29 Mar 2004
775-v0 Recycler and 8 GeV Line Permanent Magnets: Reference Design and Performance Requirements George W. Foster Transfer Lines
Magnets
11 Aug 2003
725-v2 Dispersion Matching into the Tevatron David E. Johnson et al. Transfer Lines
Optics
Beam Transfer
12 Jul 2003
468-v4 Notes for MI/RR Group Meeting of 19 Feb 2003 Bruce C. Brown RF
Beam Instrumentation
Transfer Lines
Beam Dynamics
MI-RR-Group
Studies
10 Mar 2003
469-v3 Notes for MI/RR Group Meeting of 24 Feb 2003 Bruce C. Brown Transfer Lines
Vacuum
MI-RR-Group
Studies
25 Feb 2003
462-v1 Focusing Properties of The Booster Extraction Septa Bruce C. Brown et al. Transfer Lines
Extraction Lattice
Magnets
21 Feb 2003
375-v1 Vacuum Windows in Recycler Transfer Lines Carol J. Johnstone et al. Transfer Lines
Vacuum
Transfer Lines
27 Sep 2002
351-v1 Strength Measurements of B3 (ODM) Dipoles Bruce C. Brown Transfer Lines
Magnets
Magnets
07 Sep 2000
341-v3 The Main Injector SBD for Studiers Willem Blokland et al. Beam Instrumentation
Sampled Bunch Display (SBD)
LabVIEW
Acnet
Console Applications
Data Acquisition
15 Feb 1999
340-v2 SWIC and Multiwire Timing James L. Crisp et al. Controls
Beam Instrumentation
Transfer Lines
08 Dec 1998
307-v2 Shielding Assessment of F0 to Switchyard Beam Line Enclosure for MI 120 GeV Beam Transport Chandrashekhara M. Bhat Transfer Lines
Beam Dynamics
ES&H
16 Sep 1997
294-v1 Magnet Orientations in Beamlines David E. Johnson Transfer Lines
Alignment
Alignment
Civil
Magnets
30 May 1997
292-v1 Beam Line Beam Loss Monitors Marv Olson Beam Instrumentation
Beam Loss Monitors (BLM)
Transfer Lines
Design Properties
12 Mar 1997
287-v1 Measurements of the Longitudinal Shape and Center of the Magnetic Field of PDD Dipoles Bruce C. Brown Transfer Lines
Magnets
Magnets
17 Feb 1997
227-v1 Rogowski Coil Measurements of PQP003 and PQP004 Bruce C. Brown et al. Transfer Lines
Magnets
Magnets
25 Nov 1996
171-v2 MI-10 Injection Layout David E. Johnson Transfer Lines
Civil
17 May 1996
170-v1 Closed Orbit Effects Due to Longitudinal Bend Center Displacement Bruce C. Brown Transfer Lines
Alignment
Transfer Lines
02 Apr 1996
85-v1 Transparencies from 150 GeV Line Status Review Management of Main Injector Project Beam Instrumentation
Transfer Lines
Beam Dynamics
21 Jul 1993
79-v1 Beamline Power Supply Ripple and Regulation Specifications David E. Johnson Power Supplies
Transfer Lines
02 Mar 1993
62-v1 Minutes from the First Main Injector 'Review' Meeting May 29, 1991 Philip S. Martin Extraction
Lattice
Transfer Lines
29 May 1991
55-v1 Desirable Tevatron F0 Straight Optics for 150 GeV Injection David E. Johnson et al. Transfer Lines
03 Apr 1991
41-v1 Main Ring Remnant Configuration Steven L. Hays et al. Transfer Lines
Magnets
06 Dec 1990
26-v2 MI_15 Kicker Specifications David E. Johnson Extraction
Transfer Lines
Magnets
17 Apr 1990
11-v1 MI-14 Beamlines Solutions for TeV Injection, Slow Extraction, Pbar Production, and Pbar Injection David E. Johnson Extraction
Transfer Lines
Beam Transfer
21 Mar 1990
8-v1 A 150 GeV MI_11 to Tevatron Beamline Solution David E. Johnson Transfer Lines
16 Nov 1989
1-v2 A Dispersion Mismatch Criterion for the Main Injector to Tevatron Transfer Line Rodney E. Gerig Transfer Lines
24 Oct 1989
25-v1 Fermilab Fixed Target Beams from the Main Injector Samuel R. Childress Extraction
Transfer Lines
01 May 1989

Number of documents found: 47

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.29 usr + 0.06 sys = 0.35 CPU)