Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Proton Source Improvement Plan (subtopic of Projects) are available:
(List events on Proton Source Improvement Plan)

Beams-doc-# Title Author(s) Topic(s) Last Updated
5969-v1 2nd harmonic RF perpendicular biased cavity update (07 Dec 2017) Kevin Duel et al. PIP
08 Dec 2017
5822-v1 Parallel-Biased Booster Replacement Cavity Mohamed H Hassan Booster
PIP
01 Dec 2017
5924-v1 2nd harmonic RF perpendicular biased cavity update (09 Nov 2017) Kevin Duel et al. PIP
09 Nov 2017
5876-v1 2nd harmonic RF perpendicular biased cavity update (12 Oct 2017) John Kuharik et al. PIP
30 Oct 2017
5858-v1 2nd harmonic RF perpendicular biased cavity update (28 Sep 2017) Gennady Romanov et al. PIP
28 Sep 2017
5834-v1 2nd harmonic RF perpendicular biased cavity update (14 Sep 2017) Kevin Duel et al. PIP
14 Sep 2017
5810-v1 2nd harmonic RF perpendicular biased cavity update (31 Aug 2017) John Kuharik et al. PIP
31 Aug 2017
5798-v1 2nd harmonic RF perpendicular biased cavity update (17 Aug 2017) Kevin Duel et al. PIP
17 Aug 2017
5774-v1 PIP: Booster Lattice Studies Cheng-Yang Tan PIP
09 Aug 2017
5756-v1 2nd harmonic RF perpendicular biased cavity update (03 Aug 2017) Cheng-Yang Tan PIP
03 Aug 2017
5663-v2 2nd harmonic RF perpendicular biased cavity update (20 Jul 2017) Kevin Duel et al. PIP
21 Jul 2017
5606-v2 Booster lattice meeting (12 Jul 2017) Cheng-Yang Tan PIP
13 Jul 2017
5591-v1 2nd harmonic RF perpendicular biased cavity update (06 Jul 2017) Kevin Duel et al. PIP
06 Jul 2017
5573-v1 Booster lattice meeting (28 Jun 2017) Yuri Alexahin et al. PIP
28 Jun 2017
5567-v3 2nd harmonic RF perpendicular biased cavity update (22 Jun 2017) Cheng-Yang Tan PIP
23 Jun 2017
5531-v1 Booster lattice meeting (14 Jun 2017) Yuri Alexahin et al. PIP
15 Jun 2017
5519-v1 Study of Two-Stage Collimation System in Fermilab Booster Valery Kapin PIP
12 Jun 2017
5501-v1 2nd harmonic RF perpendicular biased cavity update (08 Jun 2017) Kevin Duel et al. PIP
08 Jun 2017
5489-v1 Proposal to Use the Fermilab PIP-II Linac to Support a Low Energy Muon Program Adrian Hillier et al. PIP
05 Jun 2017
5477-v2 Booster lattice meeting (31 May 2017) Cheng-Yang Tan PIP
31 May 2017
5456-v1 2nd harmonic RF perpendicular biased cavity update (25 May 2017) Gennady Romanov et al. PIP
25 May 2017
5438-v1 Booster lattice meeting (17 May 2017) Yuri Alexahin et al. PIP
23 May 2017
5430-v1 PIP Status Report Meeting Ken Domann et al. PIP
20 May 2017
5406-v1 2nd harmonic RF perpendicular biased cavity update (11 May 2017) Kevin Duel et al. PIP
11 May 2017
5400-v2 Booster lattice meeting (03 May 2017) Yuri Alexahin et al. PIP
03 May 2017
5388-v1 2nd harmonic RF perpendicular biased cavity update (27 Apr 2017) Kevin Duel et al. PIP
28 Apr 2017
5371-v1 PIP Status Report Meeting Valery Kapin et al. PIP
19 Apr 2017
5367-v1 2nd harmonic RF perpendicular biased cavity update (13 Apr 2017) Kevin Duel et al. PIP
13 Apr 2017
5365-v2 Booster lattice meeting (12 Apr 2017) Yuri Alexahin et al. PIP
12 Apr 2017
5361-v1 PIP1+: Booster lattice measurements Kiyomi Seiya et al. PIP
03 Apr 2017
5358-v1 2nd harmonic RF perpendicular biased cavity update (30 Mar 2017) Kevin Duel et al. PIP
30 Mar 2017
5354-v1 PIP Status Report Meeting Ken Domann PIP
22 Mar 2017
5352-v2 Laser Notcher status 3-22-17 David E. Johnson PIP
22 Mar 2017
5351-v1 Booster lattice meeting (22 Mar 2017) Yuri Alexahin et al. PIP
22 Mar 2017
5350-v4 Y567b Power Amplifier Tests at 76 and 106 MHz Robyn L Madrak et al. Upgrades
PIP
HLRF
22 Mar 2017
5348-v1 2nd harmonic RF perpendicular biased cavity update (16 Mar 2017) Kevin Duel et al. PIP
17 Mar 2017
5345-v1 PIP Status Report Meeting Salah Chaurize et al. PIP
13 Mar 2017
5343-v1 Booster lattice meeting (08 Mar 2017) Alexandru Macridin et al. PIP
08 Mar 2017
5342-v1 2nd harmonic RF perpendicular biased cavity update (02 Mar 2017) Kevin Duel et al. PIP
02 Mar 2017
5329-v1 2nd harmonic RF perpendicular biased cavity update (16 Feb 2017) Kevin Duel et al. PIP
02 Mar 2017
5340-v1 A proposal for upgrade of Booster collimation system Valery Kapin PIP
22 Feb 2017
5339-v1 Booster lattice meeting (22 Feb 2017) Alexandru Macridin et al. PIP
22 Feb 2017
5338-v1 PIP: Booster Lattice Measurements Cheng-Yang Tan PIP
22 Feb 2017
5325-v1 2nd harmonic RF perpendicular biased cavity mechanical update (09 Feb 2017) Kevin Duel et al. PIP
10 Feb 2017
5321-v1 2nd harmonic RF perpendicular biased cavity update (02 Feb 2017) Kevin Duel et al. PIP
03 Feb 2017
5320-v1 2nd harmonic RF perpendicular biased cavity update (19 Jan 2017) Kevin Duel et al. PIP
02 Feb 2017
5317-v1 PIP Status Report Meeting Ken Domann et al. PIP
25 Jan 2017
5312-v1 2nd harmonic RF perpendicular biased cavity update (19 Jan 2017) Kevin Duel et al. PIP
19 Jan 2017
5308-v2 PIP Status Report Meeting Rene Padilla et al. PIP
11 Jan 2017
5303-v1 2nd harmonic RF perpendicular biased cavity update (05 Jan 2017) Kevin Duel et al. PIP
05 Jan 2017
5300-v1 PIP Status Report Meeting Ken Domann et al. PIP
21 Dec 2016
5294-v1 PIP New Tuners Summary Report Patrick G. Sheahan et al. PIP
HLRF
14 Dec 2016
5289-v1 2nd harmonic RF perpendicular biased cavity update (08 Dec 2016) Kevin Duel et al. PIP
08 Dec 2016
5288-v1 Criteria for proceeding with replacement Booster cavity (PIP) William A Pellico Booster
PIP
05 Dec 2016
5286-v1 Closeout - Recommendations and Comments Fernanda G Garcia PIP
30 Nov 2016
5274-v1 Timetable Fernanda G Garcia PIP
22 Nov 2016
5272-v1 Answers to Reviewer Questions David E. Johnson PIP
22 Nov 2016
5270-v1 Laser Instrumentation Todd R. Johnson PIP
22 Nov 2016
5268-v2 July Commissioning and Upgrade palns David E. Johnson PIP
22 Nov 2016
5267-v1 Pulse Formation and Fiber System David E. Johnson PIP
22 Nov 2016
5269-v2 Laser Notcher Free Space Optics Todd R. Johnson PIP
22 Nov 2016
5266-v2 Overall Design of Laser Notcher System Kevin Duel et al. PIP
22 Nov 2016
5265-v1 Welcome / Charge / Motivation Fernanda G Garcia et al. PIP
22 Nov 2016
5276-v1 2nd harmonic RF perpendicular biased cavity update (17 Nov 2016) Kevin Duel et al. PIP
18 Nov 2016
5261-v1 2nd harmonic RF perpendicular biased cavity update (27 Oct 2016) Matt R Kufer et al. PIP
18 Nov 2016
5262-v1 PIP Status Report Meeting David E. Johnson et al. PIP
28 Oct 2016
5260-v1 PIP: Summary of DC studies held between 12 Oct to 14 Oct 2016 Cheng-Yang Tan PIP
27 Oct 2016
5257-v2 PIP Status Report Meeting Ken Domann et al. PIP
26 Oct 2016
5254-v1 Laser Nothcher Status 10-19-2016 David E. Johnson et al. Projects
PIP
19 Oct 2016
5241-v4 2nd harmonic RF perpendicular biased cavity update (29 Sep 2016) Gennady Romanov et al. PIP
29 Sep 2016
5222-v2 PIP Status Report Meeting Valery Kapin et al. PIP
28 Sep 2016
5240-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
28 Sep 2016
5239-v1 PIP Status Report Meeting Matthew H Gardner et al. PIP
27 Sep 2016
5185-v4 2nd harmonic RF perpendicular biased cavity update (12 July 2016) Kevin Duel et al. PIP
22 Sep 2016
5232-v1 2nd harmonic RF perpendicular biased cavity update (15 Sep 2016) Robyn L Madrak et al. PIP
15 Sep 2016
5224-v1 2nd harmonic RF perpendicular biased cavity update (01 Sep 2016) Gennady Romanov et al. PIP
01 Sep 2016
5218-v1 2nd harmonic RF perpendicular biased cavity update (18 Aug 2016) Kevin Duel et al. PIP
18 Aug 2016
5206-v1 PIP Status Report Meeting David E. Johnson et al. PIP
Linac
11 Aug 2016
5202-v2 2nd harmonic RF perpendicular biased cavity update (28 July 2016) Kevin Duel et al. PIP
29 Jul 2016
5200-v1 PIP Status Report Meeting Ken Domann et al. PIP
27 Jul 2016
5196-v1 PIP Status Report Meeting William A Pellico PIP
19 Jul 2016
5175-v1 2nd harmonic RF perpendicular biased cavity update (16 June 2016) Kevin Duel et al. PIP
30 Jun 2016
5183-v1 2nd harmonic RF perpendicular biased cavity update (30 June 2016) Kevin Duel et al. PIP
30 Jun 2016
5174-v1 PIP: Measurements and simulations of beam crossing transition Chandrashekhara M. Bhat et al. PIP
15 Jun 2016
5171-v1 2nd harmonic RF perpendicular biased cavity update (02 June 2016) Kevin Duel et al. PIP
03 Jun 2016
5158-v1 2nd harmonic RF perpendicular biased cavity update (19 May 2016) Kevin Duel et al. PIP
19 May 2016
5152-v1 2nd harmonic RF perpendicular biased cavity update (05 May 2016) Gennady Romanov et al. PIP
05 May 2016
5144-v1 2nd harmonic RF perpendicular biased cavity update (21 Apr 2016) Kevin Duel et al. PIP
21 Apr 2016
5142-v1 PIP: LOCO update Ken Domann et al. PIP
20 Apr 2016
5136-v2 PIP: 2nd Harmonic Cavity Update William A Pellico et al. PIP
20 Apr 2016
5137-v1 Experience with the ferrite tuner for LEB (1992-1993) Vyacheslav Yakovlev PIP
15 Apr 2016
5132-v1 PIP Status Report Meeting Valery Kapin et al. PIP
08 Apr 2016
5134-v1 2nd harmonic RF perpendicular biased cavity update (07 Apr 2016) Kevin Duel et al. PIP
07 Apr 2016
5114-v1 2nd harmonic RF perpendicular biased cavity update (24 Mar2016) Kevin Duel et al. PIP
24 Mar 2016
5113-v1 PIP Status Report Meeting Ken Domann et al. PIP
24 Mar 2016
5112-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
24 Mar 2016
5100-v1 2nd harmonic RF perpendicular biased cavity update (10 Mar2016) Gennady Romanov et al. PIP
10 Mar 2016
5097-v2 Laser Notcher Status David E. Johnson Projects
Projects
PIP
02 Mar 2016
5095-v1 2nd harmonic RF perpendicular biased cavity update (25 Feb 2016) Kevin Duel et al. PIP
25 Feb 2016
5079-v1 Booster Collimators Valery Kapin PIP
17 Feb 2016
5071-v1 2nd harmonic RF perpendicular biased cavity update (11 Feb 2016) Kevin Duel et al. PIP
11 Feb 2016
5070-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
10 Feb 2016
5060-v1 PIP Status Report Meeting Chandrashekhara M. Bhat et al. PIP
01 Feb 2016
5058-v3 An Update on Early Injection Capture in the Booster Chandrashekhara M. Bhat Operations
PIP
01 Feb 2016
5059-v2 2nd harmonic RF perpendicular biased cavity update (28 Jan 2016) Gennady Romanov et al. PIP
29 Jan 2016
5047-v1 2nd harmonic RF perpendicular biased cavity update (14 Jan 2016) Cheng-Yang Tan et al. PIP
14 Jan 2016
5044-v1 PIP Meeting Thomas K Kroc et al. PIP
13 Jan 2016
5046-v2 PIP Meeting: 2nd Harmonic cavity Update Cheng-Yang Tan PIP
13 Jan 2016
5045-v1 PIP Status Report Meeting Ken Domann et al. PIP
13 Jan 2016
4610-v18 PIP RF Cavity and Tuners Refurbishement Progress & Projections Keith E Gollwitzer Upgrades
PIP
11 Jan 2016
4566-v3 Optics corrections in Booster Cheng-Yang Tan PIP
21 Dec 2015
5027-v1 PIP: Improving and fixing the Booster MADX model Cheng-Yang Tan PIP
16 Dec 2015
5022-v1 2nd harmonic RF perpendicular biased cavity update (10 Dec 2015) Robyn L Madrak et al. PIP
10 Dec 2015
5013-v2 Workshop on Booster Performance and Enhancements 23 Nov - 24 Nov Chandrashekhara M. Bhat et al. PIP
09 Dec 2015
5020-v1 Plan for booster collimations (Dec2015-summer2016) Valery Kapin PIP
08 Dec 2015
4864-v2 Simplified Modeling of Space Charge Losses in Booster at Injection Alexander A. Valishev Beam Dynamics
PIP
23 Nov 2015
5009-v1 Recommendations from review of 700kW plan Mary Convery PIP
Recycler
17 Nov 2015
5001-v3 2nd harmonic RF perpendicular biased cavity update (12 Nov 2015) Gennady Romanov et al. PIP
12 Nov 2015
4992-v1 PIP Status Report Meeting Ken Domann et al. PIP
28 Oct 2015
4981-v1 2nd harmonic RF perpendicular biased cavity update (15 Oct 2015) Gennady Romanov et al. PIP
15 Oct 2015
4960-v1 PIP Status Report Meeting Ken Domann et al. Booster
PIP
26 Sep 2015
4958-v1 2nd Harmonic Perpendicular Biased Cavity for Booster Cheng-Yang Tan PIP
25 Sep 2015
4956-v1 2nd harmonic RF perpendicular biased cavity update (24 Sep 2015) Robyn L Madrak et al. PIP
25 Sep 2015
4943-v1 Proton Improvement Plan / Proton Source Ready for 700kW William A Pellico Booster
PIP
10 Sep 2015
4945-v1 Introduction -- 700kW Followup Review Mary Convery Main Injector
PIP
Recycler
10 Sep 2015
4946-v1 2nd harmonic RF perpendicular biased cavity update (10 Sep 2015) Mohamed Awida et al. PIP
10 Sep 2015
4937-v3 PIP Status Report Meeting Trevor A Butler et al. PIP
02 Sep 2015
4933-v2 2nd harmonic RF perpendicular biased cavity update (27 Aug 2015) Ding Sun et al. PIP
27 Aug 2015
4922-v2 2nd harmonic RF perpendicular biased cavity update (13 Aug 2015) Gennady Romanov et al. PIP
14 Aug 2015
4920-v1 PIP Status Report Meeting Ryan Crawford et al. Booster
PIP
Linac
12 Aug 2015
4902-v1 PIP Status Report Meeting Tom N Kubicki et al. PIP
04 Aug 2015
4903-v1 2nd harmonic RF perpendicular biased cavity update (30 July 2015) Kevin Duel et al. PIP
30 Jul 2015
4893-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
Upgrades
22 Jul 2015
4892-v2 2nd harmonic RF perpendicular biased cavity special meeting on matching Cheng-Yang Tan PIP
21 Jul 2015
4885-v1 2nd harmonic RF perpendicular biased cavity update (16 July 2015) Gennady Romanov et al. PIP
16 Jul 2015
4879-v1 2nd harmonic RF perpendicular biased cavity update (01 July 2015) Robyn L Madrak et al. PIP
01 Jul 2015
4871-v1 PIP Status Report Meeting Ken Domann et al. PIP
29 Jun 2015
4865-v1 Talks presented at the PIP Status Meeting William A Pellico PIP
17 Jun 2015
4855-v2 2nd harmonic RF perpendicular biased cavity special meeting on power coupler Gennady Romanov et al. PIP
11 Jun 2015
4847-v1 2nd harmonic RF perpendicular biased cavity update (21 May 2015) Gennady Romanov et al. PIP
09 Jun 2015
4853-v1 2nd harmonic RF perpendicular biased cavity update (4 June 2015) Gennady Romanov et al. PIP
04 Jun 2015
4852-v2 PIP Status Report Meeting Ryan Crawford et al. PIP
03 Jun 2015
4846-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
20 May 2015
4821-v1 Plan for PA test at 76/106 MHz Joseph E. Dey et al. PIP
30 Apr 2015
4820-v1 PIP Status Report Meeting Ryan Crawford et al. PIP
29 Apr 2015
4812-v1 PIP Status Report Meeting Ken Domann et al. PIP
22 Apr 2015
4804-v1 2nd harmonic RF perpendicular biased cavity update (15 Apr 2015) Robyn L Madrak et al. PIP
16 Apr 2015
4795-v1 PIP Status Report Meeting Raymond Tomlin et al. PIP
14 Apr 2015
4801-v1 PIP Status Report Meeting Joe Compton et al. PIP
13 Apr 2015
4796-v2 2nd harmonic RF perpendicular biased cavity update (02 Apr 2015) Robyn L Madrak et al. PIP
02 Apr 2015
4794-v1 PIP Status Report Meeting Ken Domann et al. PIP
30 Mar 2015
4784-v1 PIP Status Report Meeting Joe Compton et al. PIP
16 Mar 2015
4783-v2 2nd harmonic RF perpendicular biased cavity update (12 Mar 2015) Gennady Romanov et al. PIP
12 Mar 2015
4779-v1 PIP Status Report Meeting Ryan Crawford et al. Booster
PIP
09 Mar 2015
4778-v1 PIP: LOCO update Cheng-Yang Tan PIP
04 Mar 2015
4774-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
Linac
Upgrades
25 Feb 2015
4770-v1 2nd harmonic RF perpendicular biased cavity update (17 Feb 2015) Robyn L Madrak et al. PIP
17 Feb 2015
4763-v1 PIP Status Report Meeting Tom N Kubicki et al. Booster
PIP
HLRF
13 Feb 2015
4756-v1 2nd harmonic RF perpendicular biased cavity update (30 Sep 2014) Robyn L Madrak et al. PIP
05 Feb 2015
4755-v1 2nd harmonic RF perpendicular biased cavity update (12 Sep 2014) Robyn L Madrak et al. PIP
05 Feb 2015
4754-v1 2nd harmonic RF perpendicular biased cavity update (14Jan2015 - 03 Feb 2015) Robyn L Madrak et al. PIP
03 Feb 2015
4753-v1 PIP Status Report Meeting Ken Domann et al. Booster
PIP
02 Feb 2015
4738-v2 Laser Notcher Demonstration Experiment Matthew H Gardner et al. PIP
14 Jan 2015
4739-v1 2nd harmonic RF perpendicular biased cavity update (Dec 2014- 14Jan2015) Robyn L Madrak et al. PIP
14 Jan 2015
4731-v1 PIP Status Report Meeting Ryan Crawford et al. PIP
17 Dec 2014
4724-v1 PIP Status Report Meeting David E. Johnson PIP
Linac
10 Dec 2014
4721-v1 2nd harmonic RF perpendicular biased cavity update (Nov-Dec 2014) Cheng-Yang Tan PIP
10 Dec 2014
4719-v1 Enhancements of the Fermilab Booster to Reduce Losses and Extend Lifetime: The Proton Improvement Plan Robert M Zwaska Booster
PIP
Linac
30 Nov 2014
4718-v1 PIP Status Report Meeting Ken Domann et al. PIP
HLRF
25 Nov 2014
4712-v1 PIP Status Report Meeting Ryan Crawford et al. Booster
PIP
Linac
19 Nov 2014
4711-v1 Laser Notcher Pulse Energy Requirements & Demonstration Experiment David E. Johnson et al. PIP
Upgrades
19 Nov 2014
4700-v2 Preparing for PIP II - What are the issues and plans for Booster William A Pellico Accelerator Seminar
Booster
PIP
18 Nov 2014
4698-v1 2nd harmonic RF perpendicular biased cavity update (Oct-Nov 2014) Cheng-Yang Tan PIP
11 Nov 2014
4693-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
Linac
Upgrades
29 Oct 2014
4691-v3 2nd harmonic RF perpendicular biased cavity update (Oct 2014) Cheng-Yang Tan PIP
21 Oct 2014
4684-v1 PIP General Meeting Status Update Keith E Gollwitzer Booster
PIP
Linac
Regular Meetings
16 Oct 2014
4021-v2 PIP – Linac Modulator Specification Data Trevor A Butler et al. PIP
Linac
22 Sep 2014
4664-v4 Numerical Studies for Proton Improvement Plan at Fermilab Leonid Vorobiev Instabilities
Beam Dynamics
Longitudinal Dynamics
Beam Dynamics
Transverse Dynamics
PIP
Energy Deposition
19 Sep 2014
4669-v1 PIP Status Report Meeting William A Pellico PIP
17 Sep 2014
4663-v1 PIP: 2nd harmonic cavity eddy current considerations Cheng-Yang Tan PIP
29 Aug 2014
4660-v8 PIP Status Report Meeting David Augustine et al. PIP
20 Aug 2014
4651-v1 PIP General Info William A Pellico et al. PIP
14 Aug 2014
4649-v5 PIP Linac Notcher - September Readiness Review Jean-Paul Carneiro et al. PIP
Upgrades
13 Aug 2014
4646-v1 PIP Status Report Meeting Ken Domann et al. Beam Dynamics
PIP
Linac
02 Aug 2014
4631-v1 PIP Status Report Meeting Ken Domann et al. PIP
03 Jul 2014
4628-v1 PIP Status Report Meeting Ryan Crawford et al. Booster
PIP
26 Jun 2014
4627-v2 PIP: 2nd Harmonic Cavity Update Cheng-Yang Tan PIP
25 Jun 2014
4620-v1 PIP Status Report Meeting William A Pellico et al. Booster
PIP
HLRF
20 Jun 2014
4609-v1 PIP General Info Ken Domann et al. PIP
28 May 2014
4606-v1 Doubling the Main Injector Beam Power Ioanis Kourbanis Accelerator Seminar
Main Injector
PIP
Recycler
20 May 2014
4597-v1 2nd harmonic RF perpendicular biased cavity update (04 Apr – 16 May 2014) Cheng-Yang Tan PIP
16 May 2014
4587-v1 PIP Status Report Meeting Nathan Eddy et al. Booster
PIP
30 Apr 2014
4585-v1 PIP General Info Ken Domann et al. PIP
24 Apr 2014
4584-v1 PIP Status Update - Linac Utilities Report Matthew H Gardner PIP
23 Apr 2014
4569-v1 PIP General Info William A Pellico PIP
10 Apr 2014
4567-v2 2nd harmonic RF perpendicular biased cavity update (-- 04 Apr 2014) Cheng-Yang Tan PIP
04 Apr 2014
4565-v1 Booster Bias Supply Upgrade Patrick G. Sheahan Booster
PIP
02 Apr 2014
4564-v2 PIP: 2nd harmonic RF perpendicular biased cavity update Cheng-Yang Tan PIP
02 Apr 2014
4554-v1 PIP General Info Salah Chaurize et al. Booster
PIP
13 Mar 2014
4552-v1 Accelerator Operations and PIP Sergei Nagaitsev Operations
PIP
11 Mar 2014
4547-v1 PIP General Info Ken Domann et al. PIP
20 Feb 2014
4538-v1 PIP General Info Fernanda G Garcia PIP
11 Feb 2014
4536-v1 PIP: LOCO for Booster Cheng-Yang Tan PIP
11 Feb 2014
4534-v1 35 Years of H- Ions at Fermilab Dan Bollinger Pre-Accelerator
Accelerator Seminar
PIP
06 Feb 2014
4501-v1 PIP General Info Trevor A Butler et al. PIP
27 Dec 2013
4499-v1 3-CELL TEST RESULTS & 9-CELL PLAN Howard Pfeffer HLRF
PIP
18 Dec 2013
4492-v1 PIP General Info Ken Domann et al. Beam Dynamics
PIP
LLRF
04 Dec 2013
4490-v1 Status of Pulser for Short Magnets Chris Jensen Power Supplies
PIP
04 Dec 2013
4480-v2 PIP General Info Ken Domann et al. PIP
07 Nov 2013
4479-v1 Preliminary consideration of perpendicularly biased Booster cavity Gennady Romanov PIP
HLRF
07 Nov 2013
4454-v1 Source Development Dan Bollinger Pre-Accelerator
PIP
24 Sep 2013
4453-v1 PIP General Info William A Pellico PIP
24 Sep 2013
4443-v1 Booster Cavity: Parametric Study Mohamed H Hassan et al. Booster
PIP
HLRF
16 Sep 2013
4442-v1 PIP General Info William A Pellico PIP
16 Sep 2013
4431-v1 Booster Aperture and Alignment Kiyomi Seiya Booster
PIP
22 Aug 2013
4430-v1 PIP General Info Ken Domann et al. PIP
21 Aug 2013
4424-v2 TRACK 3D SIMULATIONS OF THE PIP RFQ Jean-Paul Carneiro PIP
13 Aug 2013
4419-v1 Booster New Cavities - PIP Mohamed H Hassan Booster
PIP
24 Jul 2013
4412-v1 PIP General Info William A Pellico PIP
11 Jul 2013
4306-v1 Linac Laser Notcher Status David E. Johnson Projects
PIP
28 Jun 2013
4392-v1 PIP General Info William A Pellico PIP
24 Jun 2013
4380-v2 The FNAL 400 MeV Linac in TRACEWIN Jean-Paul Carneiro PIP
Linac
11 Jun 2013
4363-v2 Plans for Booster & Linac Transformer Installation Ryan Crawford Booster
Upgrades
PIP
Linac
Upgrades
08 May 2013
4366-v1 PIP General Info William A Pellico PIP
08 May 2013
4365-v1 PIP Vacuum Upgrades and Future Plans David Augustine Booster
PIP
08 May 2013
4353-v1 PIP General Info William A Pellico PIP
24 Apr 2013
4352-v1 PIP Budget/Schedule Status Ken Domann PIP
24 Apr 2013
4337-v1 Booster ORM status Eliana Gianfelice-Wendt Beam Dynamics
PIP
10 Apr 2013
4336-v1 PIP General Info William A Pellico PIP
10 Apr 2013
4335-v1 Booster Transition Crossing Yuri Alexahin Booster
Beam Dynamics
PIP
03 Apr 2013
4334-v1 Linac Modulator Upgrade Trevor A Butler PIP
Linac
Upgrades
03 Apr 2013
4333-v1 PIP General Info William A Pellico PIP
03 Apr 2013
4330-v1 PIP Budget/Schedule Status Ken Domann PIP
02 Apr 2013
4325-v1 PIP General Info Robert M Zwaska PIP
27 Mar 2013
4312-v1 Booster Ferrite Bias Supply Upgrade Patrick G. Sheahan Booster
Upgrades
PIP
HLRF
13 Mar 2013
4311-v1 PIP General Info William A Pellico PIP
13 Mar 2013
4308-v1 Linac BPM Status Update Elliott S McCrory BPM
Beam Instrumentation
Console Applications
PIP
Beam Instrumentation
06 Mar 2013
4307-v1 PIP General Info William A Pellico PIP
06 Mar 2013
4304-v1 Update of Booster Alignment & Magnet Moves Kiyomi Seiya Booster
Beam Dynamics
PIP
25 Feb 2013
4302-v1 PIP General Info William A Pellico PIP
25 Feb 2013
4301-v1 Booster Beam Notching Installation Update Salah Chaurize Booster
Beam Dynamics
Upgrades
PIP
25 Feb 2013
4293-v1 Status of Low-Energy Linac Lattice Update Valery Kapin Beam Dynamics
PIP
13 Feb 2013
4292-v1 PIP General Info William A Pellico PIP
13 Feb 2013
4282-v1 Design of Booster Transverse Damper Timofey Zolkin Booster
Beam Dynamics
Upgrades
PIP
30 Jan 2013
4281-v1 Design of the Booster transverse damper. Timofey Zolkin Beam Dynamics
PIP
30 Jan 2013
4280-v1 PIP Budget/Schedule Status Ken Domann PIP
30 Jan 2013
4278-v1 PIP - General Info Robert M Zwaska PIP
30 Jan 2013
4274-v1 Simulation of Booster Transverse Instabilities Alexandru Macridin Booster
Beam Dynamics
PIP
16 Jan 2013
4273-v1 PIP General Info William A Pellico PIP
16 Jan 2013
4270-v1 PIP General Info William A Pellico PIP
10 Jan 2013
4267-v2 BOOSTER NOTCH ABSORBER ASSEMBLY Vladimir Sidorov Booster
PIP
10 Jan 2013
4268-v1 Final Update - 2012 Booster LCW Improvement Plan David Hixson Upgrades
PIP
09 Jan 2013
4266-v1 Refurbished Booster RF John S Reid Booster
Upgrades
PIP
HLRF
21 Dec 2012
4263-v1 PIP Budget/Schedule Status Ken Domann PIP
21 Dec 2012
4265-v1 PIP General Info William A Pellico PIP
21 Dec 2012
4262-v1 Linac Low Energy Modulators Status Update Howard Pfeffer HLRF
PIP
19 Dec 2012
4261-v1 PIP Booster Start-up Schedule Todd Sullivan PIP
12 Dec 2012
4259-v1 PIP General Info William A Pellico PIP
10 Dec 2012
4258-v4 Longitudinal Dynamics Studies for Proton Improvement Plan (PIP) at Fermilab Leonid Vorobiev Beam Dynamics
Longitudinal Dynamics
PIP
06 Dec 2012
4232-v2 Linac BPM upgrade 805MHz phase signal system Elliott S McCrory BPM
Beam Instrumentation
PIP
06 Dec 2012
4257-v2 PIP -- Status of RFQ Injector Cheng-Yang Tan PIP
05 Dec 2012
4256-v3 PIP - Linac Startup Plan Fernanda G Garcia Operations
PIP
Linac
05 Dec 2012
4254-v1 PIP-University Collaboration Robert M Zwaska PIP
28 Nov 2012
4255-v1 PIP Budget/Schedule Status Ken Domann PIP
28 Nov 2012
4253-v1 PIP Update William A Pellico PIP
28 Nov 2012
4251-v2 RFQ Linac Matching. Numerical optimization. Leonid Vorobiev Beam Dynamics
Transverse Dynamics
PIP
27 Nov 2012
4252-v2 Space Charge Templates for 3D beam simulation. Leonid Vorobiev PIP
Antiproton Source
Multiparticle
27 Nov 2012
4246-v1 Project Status Update Ken Domann et al. Projects
Projects
PIP
09 Nov 2012
4245-v1 PIP - General Info William A Pellico et al. PIP
09 Nov 2012
4242-v1 PIP Update Talk Booster Notched Beam Kicker Pulser General Talk Salah Chaurize Booster
PIP
24 Oct 2012
4241-v1 Refurbished Booster RF John S Reid PIP
HLRF
24 Oct 2012
4240-v1 PIP - General Info William A Pellico et al. Booster
PIP
Linac
24 Oct 2012
4239-v1 PIP - General Info William A Pellico PIP
11 Oct 2012
4237-v2 Linac Laser Notcher Status David E. Johnson et al. PIP
08 Oct 2012
4236-v1 Proton Improvement Plan - S&T Review William A Pellico Booster
PIP
Linac
04 Oct 2012
4234-v1 PIP General Info William A Pellico PIP
03 Oct 2012
4231-v1 PIP Budget/Schedule Status Ken Domann PIP
27 Sep 2012
4230-v1 PIP General Info William A Pellico PIP
27 Sep 2012
4229-v2 Progress Update - 2012 Booster LCW Improvement Plan David Hixson Operations
Upgrades
PIP
26 Sep 2012
4228-v1 Linac MCC/Transformer, Hatch, Booster Transformers, Anode Supply Ryan Crawford Booster
Upgrades
PIP
Linac
Upgrades
25 Sep 2012
4223-v1 PIP - General Info William A Pellico PIP
19 Sep 2012
4220-v1 9/19/2012 PIP meeting Source talk Dan Bollinger Pre-Accelerator
PIP
19 Sep 2012
4221-v1 Booster Notch Absorber Update Vladimir Sidorov Booster
PIP
19 Sep 2012
4217-v1 Proton Improvement Plan RFQ Platfrom Update Salah Chaurize PIP
13 Sep 2012
4214-v1 PIP General Info William A Pellico PIP
12 Sep 2012
4210-v1 RFQ PA Systems Brian Schupbach Pre-Accelerator
PIP
Upgrades
30 Aug 2012
4209-v1 Booster L12/Noker-L13/Absorber Update Salah Chaurize Booster
Upgrades
PIP
30 Aug 2012
4207-v1 PIP General Info William A Pellico PIP
29 Aug 2012
4205-v2 PIP - RFQ Injector Installation Overview Cheng-Yang Tan PIP
29 Aug 2012
4204-v1 PIP General Info William A Pellico PIP
22 Aug 2012
4200-v1 PIP General Info William A Pellico PIP
21 Aug 2012
4199-v1 Booster Turbo Manifold Design Analysis David Augustine Booster
Upgrades
PIP
Vacuum
21 Aug 2012
4198-v1 Booster Cogging Teststand Progress -- PIP Presentation Craig C Drennan et al. Upgrades
PIP
LLRF
20 Aug 2012
4197-v1 New Ferrite Testing for Booster Tuners Dennis Barak et al. PIP
HLRF
15 Aug 2012
4195-v1 Linac Substation L1 & Booster Substation Y-BE2 --- Update #3 Ryan Crawford Booster
Upgrades
PIP
Linac
Upgrades
15 Aug 2012
4193-v1 PIP - General Info William A Pellico PIP
09 Aug 2012
4192-v1 Linac 400 MeV BPM Status Nathan Eddy Beam Instrumentation
PIP
08 Aug 2012
4183-v1 PIP - General Info William A Pellico PIP
26 Jul 2012
4182-v1 PIP - General Info William A Pellico et al. Upgrades
PIP
19 Jul 2012
4181-v1 PIP - General Info William A Pellico PIP
18 Jul 2012
4180-v1 Second Refurbished Booster RF Cavity for 15Hz John S Reid PIP
HLRF
18 Jul 2012
4179-v1 Booster Bias Supply & Test Stand Patrick G. Sheahan Power Supplies
PIP
HLRF
18 Jul 2012
4177-v1 PIP - RFQ Repair and Installation Plans Cheng-Yang Tan PIP
11 Jul 2012
4168-v1 PIP - General Info Robert M Zwaska Booster
PIP
Linac
27 Jun 2012
4167-v2 PIP - Linac: Substation L1 & MCC Upgrade Ryan Crawford PIP
Linac
27 Jun 2012
4166-v1 Laser Notcher Status David E. Johnson Projects
PIP
27 Jun 2012
4164-v1 PIP - General Info Salah Chaurize et al. Booster
Upgrades
PIP
20 Jun 2012
4156-v1 PIP - General Info William A Pellico PIP
12 Jun 2012
4140-v1 PIP - General Info and Shutdown 2012 Activities Status Report William A Pellico et al. PIP
30 May 2012
4135-v1 PIP - General Info William A Pellico PIP
24 May 2012
4113-v1 PIP - General Info and Shutdown 2012 Schedule - First 2 weeks William A Pellico PIP
19 Apr 2012
4111-v1 PIP - General Info William A Pellico PIP
13 Apr 2012
4106-v1 L13 Notched Beam Absorber Update Salah Chaurize Booster
Operations
Upgrades
PIP
05 Apr 2012
4105-v1 PIP - General Info William A Pellico PIP
04 Apr 2012
4104-v1 PIP - General Info William A Pellico PIP
29 Mar 2012
4103-v1 PIP Presentation on Booster Main Injector Phase Lock Craig C Drennan PIP
LLRF
28 Mar 2012
4100-v1 PIP - General Info William A Pellico PIP
23 Mar 2012
4081-v4 Booster Nocthing and Absorber Review Salah Chaurize et al. Booster
PIP
21 Mar 2012
4097-v1 PIP - Linac: 200MHz Modulator Upgrade - Status Report Trevor A Butler PIP
Linac
Upgrades
21 Mar 2012
4096-v1 PIP - Linac: Substation L1 & MCC Upgrade Ryan Crawford PIP
Linac
Upgrades
20 Mar 2012
4089-v1 Calibration of Booster BPMs using IPM, and measurement of quad center relative to BPMs Meghan J McAteer Booster
PIP
Alignment
14 Mar 2012
4088-v1 PIP - General Info William A Pellico PIP
14 Mar 2012
4084-v1 First Refurbished Booster RF Cavity for 15Hz John S Reid Booster
PIP
HLRF
07 Mar 2012
4083-v1 PIP - General Info William A Pellico et al. Booster
PIP
Linac
07 Mar 2012
4082-v1 PIP - Booster RF Tuner and cavity Refurbishment Matt Slabaugh Booster
PIP
HLRF
07 Mar 2012
4079-v1 Update of Booster Alignment & Magnet Moves Kiyomi Seiya PIP
Alignment
29 Feb 2012
4078-v1 PIP - General Info William A Pellico PIP
29 Feb 2012
4068-v1 Booster SS Driver Upgrade Update Tom N Kubicki Booster
Upgrades
PIP
09 Feb 2012
4067-v1 PIP Schedule Summary Elmie Peoples PIP
09 Feb 2012
4065-v1 PIP - General Info William A Pellico PIP
09 Feb 2012
4066-v1 PIP - General Info William A Pellico PIP
09 Feb 2012
4062-v1 Beam to Muon g-2 and Mu2e Experiments from Recycler Milorad B. Popovic Booster
PIP
Recycler
Linac
03 Feb 2012
4060-v2 Booster 150 KW Power Amplifier Steve Kotz Booster
PIP
HLRF
01 Feb 2012
4058-v1 PIP - General Info William A Pellico PIP
31 Jan 2012
4057-v1 PIP - General Info William A Pellico PIP
31 Jan 2012
4050-v1 Progress in the RF/Thermal Modeling Effort of the Booster Cavity Mohamed H Hassan PIP
HLRF
18 Jan 2012
4049-v1 Booster Bias Supply Upgrade Patrick G. Sheahan PIP
HLRF
18 Jan 2012
4042-v3 Status of Linac Lattice Study H.J Kim Beam Physics
PIP
Linac
11 Jan 2012
4041-v1 PIP - General Info William A Pellico PIP
11 Jan 2012
4040-v1 Booster Notching Absorber Design Vladimir Sidorov Booster
PIP
10 Jan 2012
4038-v1 Fermilab Booster Model Calibration Alexey Petrenko Booster
PIP
10 Jan 2012
4037-v1 Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP
09 Jan 2012
4036-v1 PIP - General Info William A Pellico PIP
09 Jan 2012
4032-v1 PIP - General Info William A Pellico PIP
03 Jan 2012
4031-v1 PIP - General Info William A Pellico PIP
03 Jan 2012
4028-v2 Booster Digital Damper Status & Plans Nathan Eddy PIP
Beam Instrumentation
21 Dec 2011
4029-v2 Proposal for Booster notching improvement Alexandr Drozhdin et al. PIP
21 Dec 2011
4018-v1 PIP - General Info William A Pellico PIP
07 Dec 2011
4017-v1 PIP - General Info William A Pellico PIP
07 Dec 2011
4016-v1 Booster Bias Supply Upgrade Patrick G. Sheahan PIP
07 Dec 2011
4008-v1 PIP - General Info William A Pellico PIP
28 Nov 2011
4007-v3 Linac L1 Substation Upgrade Steven L. Hays PIP
Upgrades
23 Nov 2011
4006-v1 Orbit response matrix measurements and model calibration for the Fermilab Booster Alexey Petrenko Booster
PIP
23 Nov 2011
4004-v2 New Ferrite Cores for Booster RF Cavity Tuners Ralph Pasquinelli PIP
23 Nov 2011
3999-v1 Booster Bias Supply and Cavity Upgrade Patrick G. Sheahan PIP
17 Nov 2011
3998-v1 PIP General Info William A Pellico PIP
17 Nov 2011
3996-v2 Booster Laser Notcher Proposal David E. Johnson et al. PIP
16 Nov 2011
3993-v1 Booster Alignment & Magnet Moves Kiyomi Seiya PIP
Alignment
09 Nov 2011
3992-v1 Optice Measurements in the Booster Meghan J McAteer Beam Dynamics
PIP
09 Nov 2011
3989-v2 Booster Linear Coupling Measurement and comparison with MAD8 Yuri Alexahin et al. Studies
PIP
09 Nov 2011
3986-v1 PIP - The H- Injector Upgrade Cheng-Yang Tan PIP
02 Nov 2011
3985-v1 PIP - Linac:7835 Procurement Strategy Fernanda G Garcia Operations
Projects
PIP
Linac
Upgrades
02 Nov 2011
3979-v1 Linac RF Modulators New Specifications Trevor A Butler PIP
Linac
01 Nov 2011
3976-v1 PIP Budget Codes Budget FY12 Updates William A Pellico et al. PIP
25 Oct 2011
3952-v1 Spare cavity status and tuner update Matt Slabaugh Booster
PIP
28 Sep 2011
3947-v1 Booster Laser Notcher Options David E. Johnson Upgrades
PIP
20 Sep 2011
3946-v1 Laser Notcher for Booster David E. Johnson PIP
19 Sep 2011
3936-v1 Linac/400 MeV BPM System Plans and Status Nathan Eddy BPM
BPM
PIP
Upgrades
07 Sep 2011
3935-v2 Proton Source Vacuum Plan David Augustine Booster
PIP
Vacuum
Linac
Vacuum
02 Sep 2011
3932-v1 Linac Momentum Dump Vacuum Repair - Final Design 2011 Robert E Reilly PIP
Other
Vacuum
Linac
31 Aug 2011
3931-v1 Status Report on the Installation of Solid State Conversions for Booster Stations 1 & 2 Steve Kotz Booster
PIP
HLRF
31 Aug 2011
3930-v1 2012 Booster LCW Improvement Plan Overview David Hixson Booster
Operations
Upgrades
Projects
PIP
29 Aug 2011
3926-v1 Proton Improvement Plan -- Preliminary Overview of FY12 Bob Webber Booster
PIP
Linac
24 Aug 2011
3921-v1 Initial Simulations of Performance Limitations of the Booster RF Cavity Mohamed H Hassan Booster
HLRF
PIP
Electromagnetic Calculations
LLRF
10 Aug 2011
3920-v1 PIP- Booster RF -- Spare Cavity Status Matt Slabaugh Booster
PIP
HLRF
10 Aug 2011
3911-v1 TD Cost Estimate for Booster Tuners Thomas J Gardner Booster
PIP
HLRF
02 Aug 2011
3912-v1 Booster Modulator Upgrades Rene Padilla Booster
PIP
HLRF
02 Aug 2011
3913-v1 Booster Solid State Driver Upgrade Tom N Kubicki Booster
PIP
HLRF
02 Aug 2011

Number of documents found: 378

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 2 wallclock secs ( 0.63 usr + 0.11 sys = 0.74 CPU)