4069-v2 |
Tevatron Cooling System Reconfiguration; Summary of Meeting 3 on 02/09/2012 |
Abhishek Deshpande |
Water
|
13 Feb 2012 |
4055-v1 |
Tevatron Pond Pumps Turn Off Experiment for Decommissioning 2 |
Maurice Ball et al. |
Water
General
|
25 Jan 2012 |
3995-v2 |
Tevatron LCW System Decommissioning Meeting Summary11/09/2011 |
Abhishek Deshpande |
Tevatron
Main Ring
Water
|
15 Nov 2011 |
3983-v1 |
Low Conductivity Water (LCW) Cooling System at NML |
Jerzy Czajkowski et al. |
NML
ILCTA
Water
|
07 Nov 2011 |
3970-v2 |
Tevatron LCW Cooling Reconfiguration Analysis / Tevatron Decommissioning Activity / Meeting 2 |
Abhishek Deshpande |
Tevatron
Main Ring
Water
|
18 Oct 2011 |
3965-v3 |
Tevatron LCW Cooling Reconfiguration Analysis / Tevatron Decommissioning Activity |
Abhishek Deshpande |
Tevatron
Main Ring
Water
|
18 Oct 2011 |
3506-v1 |
Linac and A0 water temperature regulation |
James L. Crisp |
Operations
HLRF
Controls
Water
Linac
|
24 Nov 2009 |
3420-v1 |
HINS MS6 East regulator Installation |
Maurice Ball |
Proton Driver
Water
General
|
09 Jul 2009 |
343-v1 |
Microbiologically Influenced Corrosion in the Main Injector Magnet Low Conductivity Water |
Patrick G. Hurh |
Studies
Civil
Water
|
04 Mar 1999 |
106-v2 |
An Air-Cooled FMI Abort Dump? |
Chandrashekhara M. Bhat et al. |
Water
Design Properties
|
04 Apr 1994 |