Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Controls Hardware and Software for Main Injector (subtopic of Main Injector) are available:
Showing documents with topic Controls Hardware and Software for Main Injector on the most recent version. See documents with Controls on any version.

Beams-doc-# Title Author(s) Topic(s) Last Updated
5153-v1 MIBLMS Open Access Client Kyle J Hazelwood Operations
Operations
Controls
Beam Instrumentation
Beam Loss Monitors (BLM)
Controls
Beam Instrumentation
Alarms
06 May 2016
929-v3 ACL An Introduction Brian S. Hendricks Controls
Controls
Controls Working Group
Console Applications
Controls
Controls
ACNET
General
06 May 2015
3991-v1 Proposal to Create a Tomoscope Application for the Fermilab Main Injector Jerry Cai et al. Operations
Controls
Beam Instrumentation
Beam Dynamics
09 Nov 2011
841-v7 Pbar acceleration in MI using 2.5 MHz and 53 MHz rf Systems Chandrashekhara M. Bhat et al. RF
Controls
HLRF
Studies
LLRF
Longitudinal Dynamics
HLRF
Beam Dynamics
07 Nov 2005
1163-v1 Time and Data Distribution Systems at the Fermilab Accelerator David G. Beechy et al. Controls
Networks
General
07 May 2004
213-v1 Main Injector and Beamline Naming Conventions David E. Johnson et al. Lattice
Controls
Civil
08 Jul 2003
522-v1 Main Injector LeCroy Oscilloscopes James A. Fitzgerald Controls
Other
Beam Instrumentation
21 Mar 2003
346-v1 Status and Issues for Main Injector Momentum and Tune Control Bruce C. Brown Controls
Power Supplies
Magnets
02 Jun 1999
340-v2 SWIC and Multiwire Timing James L. Crisp et al. Controls
Transfer Lines
Beam Instrumentation
08 Dec 1998
334-v1 Some Additional Information for Dipole and Quadrupole Power Supply Control Bruce C. Brown Controls
Power Supplies
Magnets
04 Sep 1998
226-v1 Timing Requirements for the 8 GeV Proton Injector Kicker David E. Johnson Controls
02 Jun 1997
214-v1 MI Device and ACNET Names David E. Johnson et al. Controls
29 Oct 1996
223-v1 MI Instrumentation: Layouts and Rack Layouts Gregory L. Vogel Controls
Beam Instrumentation
Schottky
BPM
21 Oct 1996
149-v2 Thoughts on FMI Application Programming, CHEP95 and the Main Injector C. Shekhar Mishra Controls
Other
Project
05 Oct 1995

Number of documents found: 14

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.18 usr + 0.02 sys = 0.20 CPU)