Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
7109-v1 LCLS-II Fermilab CMTS Cavity Field Calculation Errors Edward W. Cullerton et al. LLRF
CMTF
CMTS-1
20 Mar 2019
7115-v1 LCLS-II CMTS Cavity Probe Calibrations Edward W. Cullerton et al. LLRF
CMTF
CMTS-1
20 Mar 2019
7091-v2 Booster RF Cavities for PIP-I+ and PIP-II (Functional Requirements Specification) Chandrashekhara M. Bhat Booster
PIP-Iplus
Projects
18 Mar 2019
7088-v2 Booster Wide Aperture D-Magnets for PIP-I+ and PIP-II (Functional Requirements Specification) Chandrashekhara M. Bhat Booster
PIP-Iplus
Projects
18 Mar 2019
7085-v2 Booster Intensity AIP for PIP-I+ (Functional Requirements Specification) Chandrashekhara M. Bhat Booster
PIP-Iplus
Upgrades
18 Mar 2019
5942-v2 Booster D magnet for PIP 2 girder requirements William A Pellico Upgrades
Magnets
19 Feb 2018
4782-v1 LCLS-II design status and challenges Nikolay Solyak Accelerator Seminar
10 Mar 2015
4700-v2 Preparing for PIP II - What are the issues and plans for Booster William A Pellico Booster
Accelerator Seminar
PIP
18 Nov 2014
4683-v3 Booster Injection in PIP-II Era An Update David E. Johnson Upgrades
14 Oct 2014
4662-v1 Superconducting Linac in Fermilab Paul Derwent et al. Upgrades
Accelerator Seminar
Linac
26 Aug 2014
627-v1 TEVATRON RUN-II BEAM COLLIMATION SYSTEM Mike Church et al. Energy Deposition
Collimators
02 Jun 2008
628-v1 ON POSSIBLE USE OF BENT CRYSTAL TO IMPROVE TEVATRON BEAM SCRAPING Alexandr Drozhdin et al. Energy Deposition
Collimators
02 Jun 2008
646-v1 A48 Collimator: Beam Physics Justification and Simulation Alexandr Drozhdin et al. Energy Deposition
Collimators
02 Jun 2008
647-v3 Tevatron Abort Kicker Prefire Simulations (Review of the A48 Collimator Design) Alexandr Drozhdin Energy Deposition
Collimators
02 Jun 2008
1934-v1 Recent updates in Supertable II Timofei B Bolshakov et al. SDA
22 Sep 2005
1247-v1 talk at the EPAC'04 - Status Run II, Upgrades Vladimir Shiltsev Status
12 Jul 2004
1246-v1 Status of Run II Vladimir Shiltsev Status
12 Jul 2004
Number of documents found: 17

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.15 usr + 0.02 sys = 0.17 CPU)