Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
6538-v1 Booster Beam Emittance Dependence on LINAC Beam Current Chandrashekhara M. Bhat et al. Booster
LAFS
22 Jul 2018
5322-v7 Sequenced Chassis Control Card, Linac Marx Modulator System Specification Craig C Drennan et al. Upgrades
30 Nov 2017
5266-v2 Overall Design of Laser Notcher System Kevin Duel et al. PIP
22 Nov 2016
5254-v1 Laser Nothcher Status 10-19-2016 David E. Johnson et al. PIP
Projects
19 Oct 2016
5097-v2 Laser Notcher Status David E. Johnson Projects
PIP
Projects
02 Mar 2016
4719-v1 Enhancements of the Fermilab Booster to Reduce Losses and Extend Lifetime: The Proton Improvement Plan Robert M Zwaska Linac
Booster
PIP
30 Nov 2014
4711-v1 Laser Notcher Pulse Energy Requirements & Demonstration Experiment David E. Johnson et al. Upgrades
PIP
19 Nov 2014
4684-v1 PIP General Meeting Status Update Keith E Gollwitzer Linac
Booster
PIP
Regular Meetings
16 Oct 2014
4662-v1 Superconducting Linac in Fermilab Paul Derwent et al. Accelerator Seminar
Linac
Upgrades
26 Aug 2014
4649-v5 PIP Linac Notcher - September Readiness Review Jean-Paul Carneiro et al. Upgrades
PIP
13 Aug 2014
4646-v1 PIP Status Report Meeting Ken Domann et al. Linac
Beam Dynamics
PIP
02 Aug 2014
4632-v2 Recommissioning Linac Bunche Length Detector BLD-03 Elliott S McCrory et al. Beam Instrumentation
Instrumentation
11 Jul 2014
4584-v1 PIP Status Update - Linac Utilities Report Matthew H Gardner PIP
23 Apr 2014
3781-v2 Proton Source Improvement Plan 2011 Valeri A Lebedev et al. Linac
Booster
03 Feb 2014
4420-v1 Linac Bunch Length Detector Pictures Elliott S McCrory Beam Instrumentation
01 Aug 2013
4306-v1 Linac Laser Notcher Status David E. Johnson PIP
Projects
28 Jun 2013
4363-v2 Plans for Booster & Linac Transformer Installation Ryan Crawford Linac
Booster
Upgrades
Upgrades
PIP
08 May 2013
4334-v1 Linac Modulator Upgrade Trevor A Butler Linac
Upgrades
PIP
03 Apr 2013
4126-v2 A 1-GeV Accumulator Ring in the Booster Tunnel Chuck Ankenbrandt et al. Project X
Linac
Booster
13 Mar 2013
4293-v1 Status of Low-Energy Linac Lattice Update Valery Kapin Beam Dynamics
PIP
13 Feb 2013
4283-v1 Linac BPM Commissioning Notes Elliott S McCrory Beam Instrumentation
Front-end Systems
Beam Instrumentation
BPM
31 Jan 2013
4276-v1 Applications for Linac BPMs Elliott S McCrory Beam Instrumentation
Java Appl Framework
Beam Instrumentation
BPM
29 Jan 2013
4232-v2 Linac BPM upgrade 805MHz phase signal system Elliott S McCrory Beam Instrumentation
PIP
BPM
06 Dec 2012
4256-v3 PIP - Linac Startup Plan Fernanda G Garcia Linac
PIP
Operations
05 Dec 2012
4246-v1 Project Status Update Ken Domann et al. Projects
PIP
Projects
09 Nov 2012
4237-v2 Linac Laser Notcher Status David E. Johnson et al. PIP
08 Oct 2012
4228-v1 Linac MCC/Transformer, Hatch, Booster Transformers, Anode Supply Ryan Crawford Linac
Booster
Upgrades
Upgrades
PIP
25 Sep 2012
4195-v1 Linac Substation L1 & Booster Substation Y-BE2 --- Update #3 Ryan Crawford Linac
Booster
Upgrades
Upgrades
PIP
15 Aug 2012
4192-v1 Linac 400 MeV BPM Status Nathan Eddy Beam Instrumentation
PIP
08 Aug 2012
4191-v4 RF Measurement results of buncher cavity for linac pre-injector upgrade Ding Sun et al. Pre-Accelerator
02 Aug 2012
4183-v1 PIP - General Info William A Pellico PIP
26 Jul 2012
3889-v3 Linac Beam Velocity Measurement Craig C Drennan Beam Instrumentation
Front-end Systems
Operations
Operations
Controls
Beam Instrumentation
24 Jul 2012
4181-v1 PIP - General Info William A Pellico PIP
18 Jul 2012
3940-v1 Linac Toroid Upgrade Meeting Summaries -- Sept, 2, 2011 -- Oct. 27, 2011 Craig C Drennan Beam Instrumentation
Front-end Systems
Intensity Measurements
16 Jul 2012
4167-v2 PIP - Linac: Substation L1 & MCC Upgrade Ryan Crawford Linac
PIP
27 Jun 2012
4165-v1 If You Build It, They Will Come , 8GeV CW Linac: A Staged Approach Milorad B. Popovic Project X
Accelerator Seminar
Linac
Booster
27 Jun 2012
4155-v1 PIP - Linac: BPM Readout Upgrade - Status Report Nathan Eddy Beam Instrumentation
Linac
Upgrades
12 Jun 2012
4108-v1 A Concept: 8 GeV CW Linac, Staged Approach Milorad B. Popovic Project X
Linac
Booster
10 Apr 2012
4101-v1 Linac 400MeV Steer program Kyle J Hazelwood Operations
Beam Instrumentation
Controls
Operations
Console Applications
27 Mar 2012
4100-v1 PIP - General Info William A Pellico PIP
23 Mar 2012
4097-v1 PIP - Linac: 200MHz Modulator Upgrade - Status Report Trevor A Butler Linac
Upgrades
PIP
21 Mar 2012
4096-v1 PIP - Linac: Substation L1 & MCC Upgrade Ryan Crawford Linac
Upgrades
PIP
20 Mar 2012
4083-v1 PIP - General Info William A Pellico et al. Linac
Booster
PIP
07 Mar 2012
4007-v3 Linac L1 Substation Upgrade Steven L. Hays Upgrades
PIP
23 Nov 2011
3985-v1 PIP - Linac:7835 Procurement Strategy Fernanda G Garcia Linac
Upgrades
PIP
Operations
Projects
02 Nov 2011
3979-v1 Linac RF Modulators New Specifications Trevor A Butler Linac
PIP
01 Nov 2011
3975-v1 ESS Update Dave McGinnis BPM
Superconductivity
25 Oct 2011
3789-v2 NTF BPM: Note on the New BPM Installation In the NTF Beam Line Craig C Drennan NTF
06 Oct 2011
3948-v2 Toroid Requirements in the Linac Craig C Drennan et al. Beam Instrumentation
20 Sep 2011
3801-v4 Beam Position Monitor Requirements in the Linac and 400 MeV Line Craig C Drennan Beam Instrumentation
Upgrades
12 Sep 2011
3935-v2 Proton Source Vacuum Plan David Augustine Linac
Booster
PIP
Vacuum
Vacuum
02 Sep 2011
3932-v1 Linac Momentum Dump Vacuum Repair - Final Design 2011 Robert E Reilly Linac
PIP
Other
Vacuum
31 Aug 2011
3926-v1 Proton Improvement Plan -- Preliminary Overview of FY12 Bob Webber Linac
Booster
PIP
24 Aug 2011
3904-v2 Linac 200 MHz Power Systems Meeting Minutes Bob Webber HLRF
Linac
15 Jul 2011
3903-v1 Proton Source Improvement Plan Overview Bob Webber Linac
Booster
13 Jul 2011
3878-v1 Proton Source Improvement Plan to DOE in March 2011 Stuart Henderson Linac
Booster
03 Jun 2011
3751-v1 Summary of the Tuesday Afternoon Session of the Proton Source Workshop Elliott S McCrory Beam Dynamics
22 Dec 2010
3745-v1 Linac RF Modulators and Related RF Power Systems Trevor A Butler HLRF
Linac
08 Dec 2010
3724-v1 Linac Momentum Dump Robert E Reilly Other
08 Dec 2010
3732-v1 Linac and Booster Radiation Shielding Status, Plans and Constraints John E Anderson Linac
Booster
ES&H
ES&H
08 Dec 2010
3739-v1 Objectives of the Proton Improvement Plan Stuart Henderson Linac
Booster
07 Dec 2010
3719-v6 Proton Source December 2010 Workshop Agenda Bob Webber Linac
Booster
06 Dec 2010
3667-v1 Continued Monitoring of the Conditioning of the Fermilab Linac 805 MHz Cavities Fernanda G Garcia et al. Operations
09 Sep 2010
3660-v4 Proton Source Task Force Report William A Pellico Linac
Booster
26 Aug 2010
3549-v1 Linac Briefing to the Directorate - August 2002 Bob Webber Pre-Accelerator
Linac
Upgrades
Operations
Spares and Maintenance
11 Feb 2010
3545-v1 CW SRF H- LINAC AS A PROTON DRIVER FOR MUON COLLIDERS AND NEUTRINO FACTORIES Chuck Ankenbrandt et al. Project X
Linac
03 Feb 2010
3541-v1 PROJECT-X, SRF, AND VERY LARGE POWER STATIONS Chuck Ankenbrandt et al. Project X
29 Jan 2010
3516-v1 Project X and a Muon Facility at Fermilab Milorad B. Popovic Upgrades
Project X
07 Dec 2009
3506-v1 Linac and A0 water temperature regulation James L. Crisp HLRF
Linac
Controls
Operations
Water
24 Nov 2009
3428-v1 Fermilab Low Energy Linac Low Level RF Upgrade Engineering Notes and Operational Guide Edward W. Cullerton et al. LLRF
LLRF
13 Aug 2009
3331-v1 Simulation of a LINAC RF station Julien Branlard LLRF
11 Mar 2009
2916-v3 HINS Linac Baseline Design Documents Bob Webber Proton Driver
Technology
30 Dec 2008
3269-v1 A 750 keV RFQ for the Fermilab Linac Milorad B. Popovic Pre-Accelerator
Linac
Upgrades
17 Dec 2008
3224-v1 AN 8 GEV CW LINAC WITH HIGH POTENTIAL BEAM POWER Chuck Ankenbrandt et al. Project X
Linac
07 Oct 2008
2910-v1 A Simple Model for a Superconducting RF cavity with a Vector Phase Modulator Dave McGinnis Proton Driver
27 Oct 2007
2745-v2 Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber Linac
Proton Driver
16 Apr 2007
2589-v3 Studies of the stability of the Dispersion Free Steering method Paul Lebrun Beam Dynamics
Adv. Accelerator R&D
24 Jan 2007
2326-v1 Cavity and Beam Excitation for the Linac--7835 Tube Lifetimes Elliott S McCrory HLRF
Operations
Spares and Maintenance
06 Jul 2006
2256-v4 The Linac 7835 Online Database Elliott S McCrory Controls
Operations
Spares and Maintenance
07 Jun 2006
2092-v1 A Low Energy Beam Transport System for the Superconducting Proton Linac Milorad B. Popovic Pre-Accelerator
10 Jan 2006
2025-v1 Preparing the SNS Injector for feeding the Spallation Neutron Source Martin P Stockli Accelerator Seminar
14 Nov 2005
1976-v1 Muon Acceleration in a Superconducting Proton Linac Milorad B. Popovic Future Accelerators
30 Sep 2005
1929-v1 Definition and Approximate Schedule of Phases of Proton Driver Related Activity at the Meson Detector Building Bob Webber Projects
Other
12 Aug 2005
1814-v1 Status of the Fermilab Drift Tube Linac Milorad B. Popovic Beam Dynamics
Multiparticle
06 May 2005
1785-v1 Replacing the 35 year old components in the Linac Elliott S McCrory HLRF
21 Apr 2005
1587-v1 The 7835 Power Tubes in the Fermilab Linac Elliott S McCrory HLRF
18 Feb 2005
1554-v1 4616 Tube Lifetime Data Elliott S McCrory HLRF
01 Feb 2005
1525-v2 Linac Filament and 7835 Life issues Elliott S McCrory HLRF
14 Jan 2005
1510-v3 Linac 7835 Power Tube Lifetime Analysis: An Update Elliott S McCrory HLRF
29 Dec 2004
1471-v2 The Fermilab Linac Upgrade Project Elliott S McCrory Upgrades
29 Nov 2004
1112-v1 Fermilab Drift Tube Linac Revisited Milorad B. Popovic Beam Dynamics
08 Apr 2004
1042-v1 Analysis of Tevatron Complex Reliability Elliott S McCrory None
25 Feb 2004
962-v1 Linac Klystron Activity and Status May 1998 to October 2000 Bob Webber HLRF
HLRF
07 Jan 2004
921-v1 Linac Upgrade Scenarios 2003 Elliott S McCrory Upgrades
21 Nov 2003
516-v1 Proton Source Department Meeting, March 12, 2003 Elliott S McCrory Operations
Operations
20 Mar 2003
514-v1 BD Seminar on Linac Performance, Winter 2003 Elliott S McCrory HLRF
Operations
Spares and Maintenance
20 Mar 2003
432-v1 Proton Source Talk to AAC, February 2003 Elliott S McCrory Operations
25 Feb 2003
470-v1 Proton Source Dept Meeting: Using the BD Docs Database Elliott S McCrory Other
25 Feb 2003
Number of documents found: 98

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators
Execution time: 2 wallclock secs ( 0.34 usr + 0.08 sys = 0.42 CPU)