Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
3324-v1 Instrumentation-Systems-SDA meeting of March 4, 2009 Craig R. McClure et al. Tevatron
SDA
Instrumentation
Main Injector
10 Mar 2009
3323-v1 Main Injector Proton Emittances before and after proton multibatch operation Vaia Papadimitriou SDA
05 Mar 2009
3298-v1 Instrumentation-Systems-SDA meeting of February 4, 2009 Craig R. McClure et al. Tevatron
SDA
Instrumentation
Main Injector
09 Feb 2009
1389-v1 VME Base Addresses Eugene Lorman Ion Profile Monitor
SyncLite (SL)
Flying Wires
LabVIEW
01 Oct 2004
1032-v1 flying wire tests in lab 3 Stephen Pordes Flying Wires
20 Feb 2004
883-v1 flying wire pictures Jim Zagel Flying Wires
27 Oct 2003
838-v1 Update of Snapshot of Tevatron Flying Wire and Synchrotron Light Detector Transverse Emittance Measurements at 980GeV Krzysztof Genser Emittance
Flying Wires
SyncLite (SL)
Instrumentation
Flying Wires
19 Sep 2003
656-v1 A Snapshot of Tevatron Flying Wire and Synchrotron Light Detector Transverse Emittance Measurements at 980GeV Krzysztof Genser Emittance
Flying Wires
SyncLite (SL)
Instrumentation
Flying Wires
05 Jun 2003
564-v1 Mi and TeV FW Analysis Federico Roncarolo Flying Wires
Flying Wires
Flying Wires
25 Apr 2003
552-v4 Tevatron Flying Wire Math Stephen Pordes Emittance
Flying Wires
Flying Wires
24 Apr 2003
141-v1 Software jobs for RR Flying Wire system Alberto Marchionni RR2003Winter
Beam Instrumentation
10 Dec 2002
Number of documents found: 11

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators
Execution time: 2 wallclock secs ( 0.18 usr + 0.02 sys = 0.20 CPU)