Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
4519-v1 Studies of MI Beam Intensity, Loss and Activation Patterns Bruce C. Brown Beam Instrumentation
DCCTs
ES&H
16 Feb 2017
2433-v11 BLM Upgrade Controller Card Program Design Randy M Thurman-Keup Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
Run II Upgrades
16 Oct 2015
4692-v1 Loss History in Main Injector: LI619A-LI621 and LI101C-LI107 Bruce C. Brown Beam Loss Monitors (BLM)
Operations
BPM
28 Oct 2014
3980-v2 Analysis Procedures for Al Activation Studies Bruce C. Brown Beam Instrumentation
Energy Deposition
Beam Loss Monitors (BLM)
Collimation
ES&H
09 Apr 2012
3950-v4 Booster BLM Upgrade -- Presentation Slides Craig C Drennan ACNET
Front-end Systems
Beam Instrumentation
07 Nov 2011
3961-v1 DEVELOPMENT OF A MACHINE PROTECTION SYSTEM FOR THE SUPERCONDUCTING BEAM TEST FACILITY AT FERMILAB Linden R Carmichael et al. NML
ILCTA
Controls
Instrumentation
30 Sep 2011
3898-v1 BLM Upgrade Project Abort Card Specification Michael J. Utes Beam Instrumentation
Instrumentation
06 Jul 2011
3795-v1 Booster BLM Tests on BLMS06 Craig C Drennan Beam Instrumentation
17 Mar 2011
3780-v1 Interfacing to the Booster BLM Upgrade Integrator/Digitizer VME Module Craig C Drennan Beam Instrumentation
17 Feb 2011
3730-v3 Linac and Booster Beam Diagnostics Craig C Drennan Beam Instrumentation
Beam Instrumentation
07 Dec 2010
1410-v10 BLM Upgrade Users' Guide Alan Baumbaugh et al. Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
TeV ABORT
21 Jun 2010
3568-v1 Predicting Residual Radiation using Beam Loss Data - Early Results Bruce C. Brown Beam Instrumentation
Beam Loss Monitors (BLM)
Operations
MI-Dept
ES&H
11 Mar 2010
3097-v1 Impressions from the 13th Beam Instrumentation Workshop BIW2008 Vsevolod Kamerdzhiev et al. Accelerator Seminar
Instrumentation
21 May 2008
3077-v1 BLM Upgrade - Digitizer Card Operating Guide Randy M Thurman-Keup Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
24 Apr 2008
2853-v3 Instrumentation-Systems-SDA meeting of August 1, 2007 David P Capista et al. SDA
09 Aug 2007
2000-v1 BLM System Control Bus Testing Kelly L Knickerbocker Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
31 Oct 2005
1994-v1 BLM VME J2 Backplane Impedance Kelly L Knickerbocker Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
31 Oct 2005
1736-v1 BLM VME J2 Backplane Crosstalk Evaluation Kelly L Knickerbocker Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
16 Mar 2005
1569-v1 Tevatron BLM VME J2 Backplane Specification Document Kelly L Knickerbocker Beam Instrumentation
Beam Loss Monitors (BLM)
Instrumentation
Beam Instrumentation
TeV ABORT
10 Feb 2005
1547-v1 Tevatron Abort Loop Status Jerry Annala TeV ABORT
Run II
Status
28 Jan 2005
1458-v1 Debuncher BLM Calibration Brian E. Drendel Instrumentation
Debuncher
17 Nov 2004
1422-v1 Main Injector BLM electronics calibration Alberto Marchionni et al. Beam Instrumentation
Beam Loss Monitors (BLM)
TeV ABORT
25 Oct 2004
1420-v1 Some data on present and new BLM system calibration Stephen Pordes Beam Loss Monitors (BLM)
TeV ABORT
21 Oct 2004
1176-v1 BLm Crate Count Marv Olson Beam Loss Monitors (BLM)
TeV ABORT
23 May 2004
1151-v1 Response to TeV BLM Review (BDoc 1147) Stephen Pordes Beam Loss Monitors (BLM)
TeV ABORT
29 Apr 2004
1147-v1 Tevatron BLM Review Committee Report of meeting on April 19th. Jerry Annala et al. TeV ABORT
28 Apr 2004
1130-v5 TeV BLM Draft Schedule Alan Baumbaugh et al. Beam Loss Monitors (BLM)
TeV ABORT
19 Apr 2004
1131-v1 Tevatron Proposed BLM system review Slides v3 Alan Baumbaugh Beam Loss Monitors (BLM)
Instrumentation
TeV ABORT
19 Apr 2004
1129-v2 TeV BLM requirements Stephen Pordes Beam Loss Monitors (BLM)
TeV ABORT
18 Apr 2004
1127-v2 TeV BLM Test Card Review Docs Craig C Drennan Beam Loss Monitors (BLM)
Instrumentation
TeV ABORT
16 Apr 2004
1128-v2 Tevatron Proposed BLM system review Slides Alan Baumbaugh Beam Loss Monitors (BLM)
TeV ABORT
16 Apr 2004
1126-v1 Tests of BLM Integrator Alan Baumbaugh et al. Beam Loss Monitors (BLM)
TeV ABORT
14 Apr 2004
1125-v1 TeV BLM Abort Setting Rate Marv Olson et al. Beam Loss Monitors (BLM)
Instrumentation
TeV ABORT
14 Apr 2004
1104-v1 tev blm sensitivity and range Stephen Pordes Beam Loss Monitors (BLM)
TeV ABORT
02 Apr 2004
1072-v2 Latched BLMs Jim Patrick et al. Beam Loss Monitors (BLM)
TeV ABORT
31 Mar 2004
1027-v1 Meeting Summary 02/10/04 - summary of doc 992 Stephen Pordes Beam Loss Monitors (BLM)
TeV ABORT
18 Feb 2004
992-v2 Preliminary BLM notions Alan Baumbaugh Beam Loss Monitors (BLM)
TeV ABORT
18 Feb 2004
825-v1 Programs Using Tevatron BLM Data Brian S. Hendricks Beam Loss Monitors (BLM)
BPM
Tevatron BPM
11 Sep 2003
824-v1 Programs Using Tevatron BLM Data Brian S. Hendricks Beam Loss Monitors (BLM)
BPM
Tevatron BPM
11 Sep 2003
806-v1 The Tevatron Beam Position And Beam Loss Monitoring Systems Alan Baumbaugh et al. Beam Loss Monitors (BLM)
Instrumentation
BPM
25 Aug 2003
790-v1 Comments on the Tevatron Beam Loss Monitor (BLM) System by R. Shafer. Robert Shafer Beam Loss Monitors (BLM)
Instrumentation
BPM
14 Aug 2003
772-v1 Beam Loss Monitor System Description Fred Krueger et al. Beam Loss Monitors (BLM)
BPM
Tevatron BPM
08 Aug 2003
667-v1 Booster Loss Monitor Data Logger Kevin Cahill Java Data Acquisition
Data Loggers
10 Jun 2003
411-v1 BEAM LINE BLM LOG AMPLIFIER EVALUATION FOR BOONE Marv Olson Beam Loss Monitors (BLM)
27 Jan 2003
Number of documents found: 44

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.21 usr + 0.03 sys = 0.24 CPU)