Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
4880-v1 Magnetic Field Calculations for Recycler Magnets Bruce C. Brown et al. Magnets
Magnets
08 Jul 2015
2198-v1 Beam collimation in the Main Injector Bruce C. Brown et al. Project
Collimation
02 Jun 2008
2769-v1 Results of pre-WQB installation Lambertson Scans David E. Johnson et al. Lattice
Transfer Lines
Alignment
04 May 2007
1746-v1 Harmonic analysis of selected Recycler locations using closed 3-bump orbits. Ming-jen Yang Magnets
Optics
22 Mar 2005
1394-v1 MI8 line measurement, March 2004 Ming-jen Yang Studies
MI-Dept
Lattice
Transfer Lines
Optics
05 Oct 2004
169-v1 Recycler Pbar Transfer Lines David E. Johnson Transfer Lines
01 Aug 2003
753-v1 NuMI Extraction Lambertson Configuration at MI60 David E. Johnson Extraction
Extraction from Main Injector
31 Jul 2003
179-v2 Magnetic Field Quality Specification for Recycler Ring Combined Function and Quadrupole Magnets Norman M. Gelfand et al. Magnets
Studies
23 Jul 2003
322-v1 Recycler Lambertson Magnet Configurations Main Injector -- Recycler Transfer Lines David J. Harding Magnets
Magnets
Magnets
16 Jul 2003
199-v1 Lambertson Final Design Review Responses David E. Johnson Magnets
Magnets
Design Properties
08 Jul 2003
544-v1 Tevatron C0 and F0 Lambertson Beam Impedance James L. Crisp et al. Magnets
Magnets
Magnets
Instabilities
04 Apr 2003
355-v1 Recycler Corrector Status David E. Johnson Alignment
09 Sep 2000
347-v1 Single Turn Extraction Design for NuMI David E. Johnson Extraction
Extraction from Main Injector
Civil
Civil Construction
Design Properties
06 Jan 2000
344-v1 Preliminary Measurement of Airborne Radioactvity in the MI40 Absorber Room and at MI40 Abort Lambertsons Anthony F. Leveling Studies
ES&H
07 Apr 1999
345-v1 Recycler Lambertson Magnetic Design George W. Foster Magnets
Magnets
Vacuum
Transfer Lines
24 Mar 1999
294-v1 Magnet Orientations in Beamlines David E. Johnson Alignment
Civil
Magnets
Transfer Lines
Alignment
30 May 1997
171-v2 MI-10 Injection Layout David E. Johnson Civil
Transfer Lines
17 May 1996
104-v1 Impedance and Instability Threshold Estimates in the Main Injector I Michael A. Martens et al. Instabilities
Beam Dynamics
01 Mar 1994
96-v1 A Numerical Simulation of Resonant Extraction John A. Johnstone Studies
Lattice
08 Oct 1993
85-v1 Transparencies from 150 GeV Line Status Review Management of Main Injector Project Beam Instrumentation
Transfer Lines
Beam Dynamics
21 Jul 1993
79-v1 Beamline Power Supply Ripple and Regulation Specifications David E. Johnson Power Supplies
Transfer Lines
02 Mar 1993
62-v1 Minutes from the First Main Injector 'Review' Meeting May 29, 1991 Philip S. Martin Extraction
Lattice
Transfer Lines
29 May 1991
55-v1 Desirable Tevatron F0 Straight Optics for 150 GeV Injection David E. Johnson et al. Transfer Lines
03 Apr 1991
41-v1 Main Ring Remnant Configuration Steven L. Hays et al. Magnets
Transfer Lines
06 Dec 1990
700-v1 Sloping the Main Injector Philip S. Martin Civil
Design Properties
22 Jun 1990
26-v2 MI_15 Kicker Specifications David E. Johnson Extraction
Magnets
Transfer Lines
17 Apr 1990
Number of documents found: 26

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.31 usr + 0.04 sys = 0.35 CPU)