Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
4633-v2 Functional Requirement Specification Performance of the MI EBP Randy M Thurman-Keup Beam Instrumentation
Instrumentation
21 Jul 2014
3995-v2 Tevatron LCW System Decommissioning Meeting Summary11/09/2011 Abhishek Deshpande Water
Tevatron
Main Ring
15 Nov 2011
3970-v2 Tevatron LCW Cooling Reconfiguration Analysis / Tevatron Decommissioning Activity / Meeting 2 Abhishek Deshpande Water
Tevatron
Main Ring
18 Oct 2011
3965-v3 Tevatron LCW Cooling Reconfiguration Analysis / Tevatron Decommissioning Activity Abhishek Deshpande Water
Tevatron
Main Ring
18 Oct 2011
1748-v2 OBSOLETE Duane C Voy Beam Instrumentation
Beam Line Tuner (BLT)
07 Jul 2010
1270-v1 Echotek Based Main Injector Beam Line Tuner Front-end Operation Duane C Voy Beam Instrumentation
Front-end Systems
Beam Line Tuner (BLT)
BPM
11 Sep 2009
3323-v1 Main Injector Proton Emittances before and after proton multibatch operation Vaia Papadimitriou SDA
05 Mar 2009
2275-v1 Simulation of longitudinal coupled bunch instability in the Main Injector driven by parasitic high order cavity mode Vincent Wu Studies
Beam Dynamics
22 May 2006
2208-v1 Bunch compression and stretching using barrier rf system Chandrashekhara M. Bhat Longitudinal Dynamics
Beam Dynamics
Beam Dynamics
15 Mar 2006
1378-v2 NUMI MI Batch by Batch Intensity Measurements Alexei Semenov Beam Instrumentation
Intensity Measurements
Monitoring Instrumentation
Talks
Instrumentation/beam Physics
18 Mar 2005
1400-v1 Main Injector Bunch Shapes from WCM- pbar production Chandrashekhara M. Bhat Beam Instrumentation
Sampled Bunch Display (SBD)
Instrumentation/beam Physics
29 Oct 2004
476-v2 2.5 MHz acceleration in the Main Injector Vincent Wu Project
15 Sep 2004
1347-v1 Calibration of 2.5 MHz voltage in Main Injector Vincent Wu RF
15 Sep 2004
1307-v1 Study of Main Injector BLT Nicole Michelotti Beam Instrumentation
Transfer Lines
Beam Line Tuner (BLT)
17 Aug 2004
1157-v1 Redefining MI 8 GeV Energy, a Proposal David E. Johnson Operations
04 May 2004
1140-v1 Redefining MI 8 GeV Energy to Maximize Pbar Production David E. Johnson Operations
Operations
23 Apr 2004
1028-v2 MI BLT Injections Movie for Pbar Shot to Recycler Vic Scarpine Beam Line Tuner (BLT)
19 Feb 2004
890-v1 Longitudinal Emittance Measurement in MI SBD: How and why? Chandrashekhara M. Bhat Studies
Longitudinal Dynamics
30 Oct 2003
767-v1 LabVIEW VI Upgrades on the IPM Systems at Fermilab Thomas Spears Beam Instrumentation
Beam Instrumentation
Ion Profile Monitor
Beam Instrumentation
08 Aug 2003
629-v1 2 MW Upgrade of the Fermilab Main Injector Weiren Chou Future Accelerators
Project
28 May 2003
573-v1 Beam Loading Compensation - RF Station Feedback Gain Measurement Joseph E. Dey HLRF
29 Apr 2003
521-v1 Main Injector SBD guide Willem Blokland et al. Beam Instrumentation
Sampled Bunch Display (SBD)
20 Mar 2003
474-v1 Agenda, Committee and Charge for the MI BPM Requirements Review Pushpalatha C. Bhat None
03 Mar 2003
406-v3 On M.I. to Tevatron Bunch Lengths and Transfer Efficiencies Paul Lebrun Emittance
Sampled Bunch Display (SBD)
13 Feb 2003
412-v1 FNAL instrumentation: Lessons Learned James L. Crisp Beam Instrumentation
Beam Loss Monitors (BLM)
Data Acquisition
BPM
27 Jan 2003
Number of documents found: 25

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.9, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.22 usr + 0.04 sys = 0.26 CPU)