Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
5355-v1 The Challenges of Next Generation Neutrino Beam Targetry Patrick G. Hurh et al. Target Hall Systems
NuMI
NOvA
23 Mar 2017
3330-v33 List of NuMI Upgrades Meetings and Reviews Michael A. Martens NuMI
22 Apr 2010
3159-v1 Delivering High Intensity Proton Beam; Lessons for the Next Beam Generations Samuel R. Childress NuMI
Primary Proton Beam
15 Jul 2008
2844-v1 Radiological Issues of NuMI with a 2.3 MW Beam Kamran Vaziri Radiation Safety
31 Jul 2007
2687-v1 MINU -- Main Injector Neutrino Upgrades Infrastructure Dixon Bogert Civil Construction
14 Mar 2007
2439-v1 NuMI and Rapid Transfer BPM Test Application Program Specifications Duane C Voy Monitoring Instrumentation
BPM
06 Sep 2006
2393-v1 Fermilab Proton Projections for Long-Baseline Neutrino Beams Robert M Zwaska Proton Plan
General
SNuMi
16 Aug 2006
2392-v1 Target and Horn Configuration for SNuMI, NOvA, and MINERvA Michael A. Martens SNuMi
15 Aug 2006
2390-v1 The NuMI Beam System: First Year of Operation Samuel R. Childress Target Hall Systems
Extraction from Main Injector
Primary Proton Beam
14 Aug 2006
2178-v2 First Report of the Proton Study Group Sergei Nagaitsev et al. Other
Operations
Upgrades
General
SY120
03 Apr 2006
2039-v1 Tritium Production in the Dolomitic Rock Adjacent to NuMI Beam Tunnels Samuel R. Childress et al. Radiation Safety
05 Dec 2005
1782-v7 A 2 MegaWatt Multi-Stage Proton Accumulator Dave McGinnis Future Accelerators
03 Nov 2005
1992-v1 Proton Intensity Improvements for MINOS Dave McGinnis Upgrades
Accumulator
Stochastic Cooling
Alignment
14 Oct 2005
1989-v1 The NuMI Beam System:Commissioning & Initial Operation Samuel R. Childress Commissioning
Primary Proton Beam
13 Oct 2005
1978-v2 Memo on Preliminary Values for MI BPM Polynomial Coefficients Bob Webber Beam Instrumentation
Monitoring Instrumentation
BPM
BPM
Extraction from Main Injector
BPM
03 Oct 2005
1322-v2 Main Injector/NuMI BPM Scaling - Analysis of Main Injector HP602 and HP604 BPM Data from Traditional Main Injector and NuMI BPM Systems Bob Webber Beam Instrumentation
Commissioning
Monitoring Instrumentation
BPM
General
BPM
03 Oct 2005
1953-v1 NuMI_090805.ppt Samuel R. Childress et al. Extraction from Main Injector
09 Sep 2005
1941-v1 ANTIPROTON AND NEUTRINO PRODUCTION ACCELERATOR TIMELINE ISSUES Dave McGinnis General
Accumulator
29 Aug 2005
1745-v1 Numi Beamline Optics study, March 14, 2005 Ming-jen Yang Transfer Lines
Primary Proton Beam
Optics
22 Mar 2005
1382-v2 Residual Radiation Hints for Aperture and Alignment Issues in the Main Injector Bruce C. Brown Alignment
ES&H
Vacuum
18 Jan 2005
1527-v1 Description of the ACNET devices that control the Main Injector inputs to the NuMI Beam Permit System Andrew Godley Beam Instrumentation
Monitoring Instrumentation
Extraction from Main Injector
Intensity Measurements
14 Jan 2005
1435-v1 The NUMI Beamline Samuel R. Childress et al. Target Hall Systems
Commissioning
Focusing Horns
Monitoring Instrumentation
Extraction from Main Injector
Primary Proton Beam
Run II
04 Nov 2004
1412-v2 Numi BPM Measurement Data James A. Fitzgerald Monitoring Instrumentation
Beam Instrumentation
BPM
19 Oct 2004
1416-v1 Note on BPM Sensitivity Scale Factors for NuMI BPM System Bob Webber Commissioning
Monitoring Instrumentation
BPM
General
Primary Proton Beam
BPM
18 Oct 2004
1323-v3 MI beam orbit verifier specifications for the NuMI Beam Permit System Andrew Godley Beam Instrumentation
Monitoring Instrumentation
BPM
Extraction from Main Injector
Primary Proton Beam
Controls
07 Sep 2004
1277-v1 Booster Cogging: Synchronization with the Main Injector for NuMI & Slip-Stacking Robert M Zwaska LLRF
Commissioning
LLRF
Commissioning
29 Jul 2004
1241-v1 Synchronization of the Fermilab Booster and Main Injector for Multiple Sacha E. Kopp et al. LLRF
Projects
LLRF
01 Jul 2004
1210-v2 NuMI Transition Module Calibration Procedure Peter Prieto Monitoring Instrumentation
BPM
22 Jun 2004
1212-v1 NuMI Calibration Board Test Procedure Peter Prieto Monitoring Instrumentation
BPM
22 Jun 2004
1036-v1 Beam to NuMI Peter Kasper Primary Proton Beam
24 Feb 2004
918-v1 Talks given at NBI2003 in KEK by Bob Zwaska Robert M Zwaska Dampers
Commissioning
Monitoring Instrumentation
Upgrades
Extraction from Main Injector
Primary Proton Beam
Commissioning
18 Nov 2003
859-v1 Booster cogging for multiple batch operation of the Main Injector William A Pellico et al. Commissioning
Project
Projects
LLRF
Studies
Primary Proton Beam
02 Oct 2003
754-v1 NuMI Extraction Comparison for Two and Three Kickers David E. Johnson Extraction
Extraction from Main Injector
13 Aug 2003
756-v2 NuMI Extraction Geometry with Current Main Injector Orbits, Quad Offsets, and Correctors David E. Johnson Extraction from Main Injector
Operations
13 Aug 2003
753-v1 NuMI Extraction Lambertson Configuration at MI60 David E. Johnson Extraction
Extraction from Main Injector
31 Jul 2003
752-v1 Proposed Main Injector Quad Offsets and Dipole Correctors Currents for the Current NuMI Extraction Geometry David E. Johnson Extraction
Extraction from Main Injector
10 Jun 2003
472-v2 REQUIREMENTS FOR THE MAIN INJECTOR & ASSOCIATED TRANSFER LINES BPMs INCLUDING THE NuMI BEAM LINE Brajesh Choudhary Beam Instrumentation
BPM
04 Mar 2003
471-v1 MAIN INJECTOR BPM SYSTEM UPGRADE + NUMI BEAMLINE BPM REQUIREMENTS Brajesh Choudhary Beam Instrumentation
BPM
03 Mar 2003
Number of documents found: 38

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.22 usr + 0.06 sys = 0.28 CPU)