Beams-doc-# Title Author(s) Topic(s) Last Updated
5774-v1 PIP: Booster Lattice Studies Cheng-Yang Tan PIP
09 Aug 2017
5519-v1 Study of Two-Stage Collimation System in Fermilab Booster Valery Kapin PIP
12 Jun 2017
5352-v2 Laser Notcher status 3-22-17 David E. Johnson PIP
22 Mar 2017
5350-v4 Y567b Power Amplifier Tests at 76 and 106 MHz Robyn L Madrak et al. Upgrades
PIP
HLRF
22 Mar 2017
5340-v1 A proposal for upgrade of Booster collimation system Valery Kapin PIP
22 Feb 2017
5338-v1 PIP: Booster Lattice Measurements Cheng-Yang Tan PIP
22 Feb 2017
5288-v1 Criteria for proceeding with replacement Booster cavity (PIP) William A Pellico Booster
PIP
05 Dec 2016
5272-v1 Answers to Reviewer Questions David E. Johnson PIP
22 Nov 2016
5270-v1 Laser Instrumentation Todd R. Johnson PIP
22 Nov 2016
5268-v2 July Commissioning and Upgrade palns David E. Johnson PIP
22 Nov 2016
5267-v1 Pulse Formation and Fiber System David E. Johnson PIP
22 Nov 2016
5174-v1 PIP: Measurements and simulations of beam crossing transition Chandrashekhara M. Bhat et al. PIP
15 Jun 2016
5101-v1 A historical comparison of Booster radiation activations surveys William A Pellico Booster
16 Mar 2016
5070-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
10 Feb 2016
5044-v1 PIP Meeting Thomas K Kroc et al. PIP
13 Jan 2016
5046-v2 PIP Meeting: 2nd Harmonic cavity Update Cheng-Yang Tan PIP
13 Jan 2016
5045-v1 PIP Status Report Meeting Ken Domann et al. PIP
13 Jan 2016
4610-v18 PIP RF Cavity and Tuners Refurbishement Progress & Projections Keith E Gollwitzer Upgrades
PIP
11 Jan 2016
4928-v1 Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandrashekhara M. Bhat Upgrades
18 Aug 2015
4801-v1 PIP Status Report Meeting Joe Compton et al. PIP
13 Apr 2015
4779-v1 PIP Status Report Meeting Ryan Crawford et al. Booster
PIP
09 Mar 2015
4774-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
Linac
Upgrades
25 Feb 2015
4763-v1 PIP Status Report Meeting Tom N Kubicki et al. Booster
PIP
HLRF
13 Feb 2015
4753-v1 PIP Status Report Meeting Ken Domann et al. Booster
PIP
02 Feb 2015
4738-v2 Laser Notcher Demonstration Experiment Matthew H Gardner et al. PIP
14 Jan 2015
4733-v1 Impact of Laser Notcher on Radiation in MEBT David E. Johnson ES&H
Projects
22 Dec 2014
4731-v1 PIP Status Report Meeting Ryan Crawford et al. PIP
17 Dec 2014
4719-v1 Enhancements of the Fermilab Booster to Reduce Losses and Extend Lifetime: The Proton Improvement Plan Robert M Zwaska Booster
PIP
Linac
30 Nov 2014
4718-v1 PIP Status Report Meeting Ken Domann et al. PIP
HLRF
25 Nov 2014
4700-v2 Preparing for PIP II - What are the issues and plans for Booster William A Pellico Accelerator Seminar
Booster
PIP
18 Nov 2014
4693-v1 PIP Status Report Meeting Trevor A Butler et al. PIP
Linac
Upgrades
29 Oct 2014
4684-v1 PIP General Meeting Status Update Keith E Gollwitzer Booster
PIP
Linac
Regular Meetings
16 Oct 2014
4683-v3 Booster Injection in PIP-II Era An Update David E. Johnson Upgrades
14 Oct 2014
4021-v2 PIP – Linac Modulator Specification Data Trevor A Butler et al. PIP
Linac
22 Sep 2014
4664-v4 Numerical Studies for Proton Improvement Plan at Fermilab Leonid Vorobiev Transverse Dynamics
Instabilities
PIP
Energy Deposition
Beam Dynamics
Longitudinal Dynamics
Beam Dynamics
19 Sep 2014
4669-v1 PIP Status Report Meeting William A Pellico PIP
17 Sep 2014
4662-v1 Superconducting Linac in Fermilab Paul Derwent et al. Accelerator Seminar
Linac
Upgrades
26 Aug 2014
4660-v8 PIP Status Report Meeting David Augustine et al. PIP
20 Aug 2014
4649-v5 PIP Linac Notcher - September Readiness Review Jean-Paul Carneiro et al. PIP
Upgrades
13 Aug 2014
4646-v1 PIP Status Report Meeting Ken Domann et al. Beam Dynamics
PIP
Linac
02 Aug 2014
4620-v1 PIP Status Report Meeting William A Pellico et al. Booster
PIP
HLRF
20 Jun 2014
4609-v1 PIP General Info Ken Domann et al. PIP
28 May 2014
4606-v1 Doubling the Main Injector Beam Power Ioanis Kourbanis Accelerator Seminar
PIP
Recycler
Main Injector
20 May 2014
4587-v1 PIP Status Report Meeting Nathan Eddy et al. Booster
PIP
30 Apr 2014
4585-v1 PIP General Info Ken Domann et al. PIP
24 Apr 2014
4584-v1 PIP Status Update - Linac Utilities Report Matthew H Gardner PIP
23 Apr 2014
4565-v1 Booster Bias Supply Upgrade Patrick G. Sheahan Booster
PIP
02 Apr 2014
4537-v2 Linac Laser Notcher Project in the Proton Improvement Plan Kevin Duel et al. Pre-Accelerator
Accelerator Seminar
Booster
Linac
01 Apr 2014
4554-v1 PIP General Info Salah Chaurize et al. Booster
PIP
13 Mar 2014
4552-v1 Accelerator Operations and PIP Sergei Nagaitsev Operations
PIP
11 Mar 2014
4547-v1 PIP General Info Ken Domann et al. PIP
20 Feb 2014
4538-v1 PIP General Info Fernanda G Garcia PIP
11 Feb 2014
4534-v1 35 Years of H- Ions at Fermilab Dan Bollinger Pre-Accelerator
Accelerator Seminar
PIP
06 Feb 2014
4531-v2 Proton Improvement Plan (PIP) - Meeting the HEP Proton Needs William A Pellico et al. Accelerator Seminar
04 Feb 2014
4501-v1 PIP General Info Trevor A Butler et al. PIP
27 Dec 2013
4492-v1 PIP General Info Ken Domann et al. PIP
Beam Dynamics
LLRF
04 Dec 2013
4490-v1 Status of Pulser for Short Magnets Chris Jensen PIP
Power Supplies
04 Dec 2013
4480-v2 PIP General Info Ken Domann et al. PIP
07 Nov 2013
4456-v2 MITIGATION OF NUMERICAL NOISE FOR SPACE CHARGE CALCULATIONS IN TRACKING CODES Chuck Ankenbrandt et al. Future Accelerators
Multiparticle
27 Sep 2013
4454-v1 Source Development Dan Bollinger Pre-Accelerator
PIP
24 Sep 2013
4453-v1 PIP General Info William A Pellico PIP
24 Sep 2013
4443-v1 Booster Cavity: Parametric Study Mohamed H Hassan et al. Booster
PIP
HLRF
16 Sep 2013
4442-v1 PIP General Info William A Pellico PIP
16 Sep 2013
4431-v1 Booster Aperture and Alignment Kiyomi Seiya Booster
PIP
22 Aug 2013
4430-v1 PIP General Info Ken Domann et al. PIP
21 Aug 2013
4412-v1 PIP General Info William A Pellico PIP
11 Jul 2013
4306-v1 Linac Laser Notcher Status David E. Johnson PIP
Projects
28 Jun 2013
4392-v1 PIP General Info William A Pellico PIP
24 Jun 2013
4380-v2 The FNAL 400 MeV Linac in TRACEWIN Jean-Paul Carneiro PIP
Linac
11 Jun 2013
4363-v2 Plans for Booster & Linac Transformer Installation Ryan Crawford Booster
Upgrades
PIP
Linac
Upgrades
08 May 2013
4366-v1 PIP General Info William A Pellico PIP
08 May 2013
4365-v1 PIP Vacuum Upgrades and Future Plans David Augustine Booster
PIP
08 May 2013
4353-v1 PIP General Info William A Pellico PIP
24 Apr 2013
4352-v1 PIP Budget/Schedule Status Ken Domann PIP
24 Apr 2013
4337-v1 Booster ORM status Eliana Gianfelice-Wendt PIP
Beam Dynamics
10 Apr 2013
4335-v1 Booster Transition Crossing Yuri Alexahin Booster
PIP
Beam Dynamics
03 Apr 2013
4334-v1 Linac Modulator Upgrade Trevor A Butler PIP
Linac
Upgrades
03 Apr 2013
4333-v1 PIP General Info William A Pellico PIP
03 Apr 2013
4330-v1 PIP Budget/Schedule Status Ken Domann PIP
02 Apr 2013
4325-v1 PIP General Info Robert M Zwaska PIP
27 Mar 2013
4313-v1 Plans for Booster Optics Correction Eliana Gianfelice-Wendt Booster
Beam Dynamics
13 Mar 2013
4312-v1 Booster Ferrite Bias Supply Upgrade Patrick G. Sheahan Booster
Upgrades
PIP
HLRF
13 Mar 2013
4311-v1 PIP General Info William A Pellico PIP
13 Mar 2013
4307-v1 PIP General Info William A Pellico PIP
06 Mar 2013
4304-v1 Update of Booster Alignment & Magnet Moves Kiyomi Seiya Booster
PIP
Beam Dynamics
25 Feb 2013
4302-v1 PIP General Info William A Pellico PIP
25 Feb 2013
4301-v1 Booster Beam Notching Installation Update Salah Chaurize Booster
Upgrades
PIP
Beam Dynamics
25 Feb 2013
4293-v1 Status of Low-Energy Linac Lattice Update Valery Kapin Beam Dynamics
PIP
13 Feb 2013
4292-v1 PIP General Info William A Pellico PIP
13 Feb 2013
4282-v1 Design of Booster Transverse Damper Timofey Zolkin Booster
Upgrades
PIP
Beam Dynamics
30 Jan 2013
4281-v1 Design of the Booster transverse damper. Timofey Zolkin PIP
Beam Dynamics
30 Jan 2013
4280-v1 PIP Budget/Schedule Status Ken Domann PIP
30 Jan 2013
4278-v1 PIP - General Info Robert M Zwaska PIP
30 Jan 2013
4274-v1 Simulation of Booster Transverse Instabilities Alexandru Macridin Booster
PIP
Beam Dynamics
16 Jan 2013
4273-v1 PIP General Info William A Pellico PIP
16 Jan 2013
4270-v1 PIP General Info William A Pellico PIP
10 Jan 2013
4268-v1 Final Update - 2012 Booster LCW Improvement Plan David Hixson Upgrades
PIP
09 Jan 2013
4266-v1 Refurbished Booster RF John S Reid Booster
Upgrades
PIP
HLRF
21 Dec 2012
4263-v1 PIP Budget/Schedule Status Ken Domann PIP
21 Dec 2012
4265-v1 PIP General Info William A Pellico PIP
21 Dec 2012
4262-v1 Linac Low Energy Modulators Status Update Howard Pfeffer HLRF
PIP
19 Dec 2012
4259-v1 PIP General Info William A Pellico PIP
10 Dec 2012
4258-v4 Longitudinal Dynamics Studies for Proton Improvement Plan (PIP) at Fermilab Leonid Vorobiev PIP
Beam Dynamics
Longitudinal Dynamics
06 Dec 2012
4257-v2 PIP -- Status of RFQ Injector Cheng-Yang Tan PIP
05 Dec 2012
4256-v3 PIP - Linac Startup Plan Fernanda G Garcia PIP
Linac
Operations
05 Dec 2012
4254-v1 PIP-University Collaboration Robert M Zwaska PIP
28 Nov 2012
4255-v1 PIP Budget/Schedule Status Ken Domann PIP
28 Nov 2012
4253-v1 PIP Update William A Pellico PIP
28 Nov 2012
4251-v2 RFQ Linac Matching. Numerical optimization. Leonid Vorobiev Transverse Dynamics
Beam Dynamics
PIP
27 Nov 2012
4246-v1 Project Status Update Ken Domann et al. Projects
PIP
Projects
09 Nov 2012
4245-v1 PIP - General Info William A Pellico et al. PIP
09 Nov 2012
4242-v1 PIP Update Talk Booster Notched Beam Kicker Pulser General Talk Salah Chaurize Booster
PIP
24 Oct 2012
4241-v1 Refurbished Booster RF John S Reid PIP
HLRF
24 Oct 2012
4240-v1 PIP - General Info William A Pellico et al. Booster
PIP
Linac
24 Oct 2012
4239-v1 PIP - General Info William A Pellico PIP
11 Oct 2012
4236-v1 Proton Improvement Plan - S&T Review William A Pellico Booster
PIP
Linac
04 Oct 2012
4234-v1 PIP General Info William A Pellico PIP
03 Oct 2012
4231-v1 PIP Budget/Schedule Status Ken Domann PIP
27 Sep 2012
4230-v1 PIP General Info William A Pellico PIP
27 Sep 2012
4229-v2 Progress Update - 2012 Booster LCW Improvement Plan David Hixson Upgrades
PIP
Operations
26 Sep 2012
4228-v1 Linac MCC/Transformer, Hatch, Booster Transformers, Anode Supply Ryan Crawford Booster
Upgrades
PIP
Linac
Upgrades
25 Sep 2012
4223-v1 PIP - General Info William A Pellico PIP
19 Sep 2012
4220-v1 9/19/2012 PIP meeting Source talk Dan Bollinger Pre-Accelerator
PIP
19 Sep 2012
4221-v1 Booster Notch Absorber Update Vladimir Sidorov Booster
PIP
19 Sep 2012
4214-v1 PIP General Info William A Pellico PIP
12 Sep 2012
4210-v1 RFQ PA Systems Brian Schupbach Pre-Accelerator
PIP
Upgrades
30 Aug 2012
4209-v1 Booster L12/Noker-L13/Absorber Update Salah Chaurize Booster
Upgrades
PIP
30 Aug 2012
4207-v1 PIP General Info William A Pellico PIP
29 Aug 2012
4204-v1 PIP General Info William A Pellico PIP
22 Aug 2012
4203-v1 PIP Booster RF Mudulators Status Update Rene Padilla HLRF
22 Aug 2012
4200-v1 PIP General Info William A Pellico PIP
21 Aug 2012
4199-v1 Booster Turbo Manifold Design Analysis David Augustine Booster
Upgrades
PIP
Vacuum
21 Aug 2012
4197-v1 New Ferrite Testing for Booster Tuners Dennis Barak et al. PIP
HLRF
15 Aug 2012
4195-v1 Linac Substation L1 & Booster Substation Y-BE2 --- Update #3 Ryan Crawford Booster
Upgrades
PIP
Linac
Upgrades
15 Aug 2012
4193-v1 PIP - General Info William A Pellico PIP
09 Aug 2012
4192-v1 Linac 400 MeV BPM Status Nathan Eddy PIP
Beam Instrumentation
08 Aug 2012
4183-v1 PIP - General Info William A Pellico PIP
26 Jul 2012
4182-v1 PIP - General Info William A Pellico et al. Upgrades
PIP
19 Jul 2012
4181-v1 PIP - General Info William A Pellico PIP
18 Jul 2012
4179-v1 Booster Bias Supply & Test Stand Patrick G. Sheahan PIP
HLRF
Power Supplies
18 Jul 2012
4168-v1 PIP - General Info Robert M Zwaska Booster
PIP
Linac
27 Jun 2012
4167-v2 PIP - Linac: Substation L1 & MCC Upgrade Ryan Crawford PIP
Linac
27 Jun 2012
4166-v1 Laser Notcher Status David E. Johnson Projects
PIP
27 Jun 2012
4164-v1 PIP - General Info Salah Chaurize et al. Booster
Upgrades
PIP
20 Jun 2012
4156-v1 PIP - General Info William A Pellico PIP
12 Jun 2012
4155-v1 PIP - Linac: BPM Readout Upgrade - Status Report Nathan Eddy Beam Instrumentation
Linac
Upgrades
12 Jun 2012
4140-v1 PIP - General Info and Shutdown 2012 Activities Status Report William A Pellico et al. PIP
30 May 2012
4135-v1 PIP - General Info William A Pellico PIP
24 May 2012
4113-v1 PIP - General Info and Shutdown 2012 Schedule - First 2 weeks William A Pellico PIP
19 Apr 2012
4114-v1 Proton source shutdown schedule Mary Convery Booster
Linac
18 Apr 2012
4111-v1 PIP - General Info William A Pellico PIP
13 Apr 2012
4106-v1 L13 Notched Beam Absorber Update Salah Chaurize Booster
Upgrades
PIP
Operations
05 Apr 2012
4105-v1 PIP - General Info William A Pellico PIP
04 Apr 2012
4104-v1 PIP - General Info William A Pellico PIP
29 Mar 2012
4103-v1 PIP Presentation on Booster Main Injector Phase Lock Craig C Drennan PIP
LLRF
28 Mar 2012
4100-v1 PIP - General Info William A Pellico PIP
23 Mar 2012
4081-v4 Booster Nocthing and Absorber Review Salah Chaurize et al. Booster
PIP
21 Mar 2012
4097-v1 PIP - Linac: 200MHz Modulator Upgrade - Status Report Trevor A Butler PIP
Linac
Upgrades
21 Mar 2012
4096-v1 PIP - Linac: Substation L1 & MCC Upgrade Ryan Crawford PIP
Linac
Upgrades
20 Mar 2012
4089-v1 Calibration of Booster BPMs using IPM, and measurement of quad center relative to BPMs Meghan J McAteer Booster
PIP
Alignment
14 Mar 2012
4088-v1 PIP - General Info William A Pellico PIP
14 Mar 2012
4084-v1 First Refurbished Booster RF Cavity for 15Hz John S Reid Booster
PIP
HLRF
07 Mar 2012
4083-v1 PIP - General Info William A Pellico et al. Booster
PIP
Linac
07 Mar 2012
4078-v1 PIP - General Info William A Pellico PIP
29 Feb 2012
4068-v1 Booster SS Driver Upgrade Update Tom N Kubicki Booster
Upgrades
PIP
09 Feb 2012
4067-v1 PIP Schedule Summary Elmie Peoples PIP
09 Feb 2012
4065-v1 PIP - General Info William A Pellico PIP
09 Feb 2012
4066-v1 PIP - General Info William A Pellico PIP
09 Feb 2012
4058-v1 PIP - General Info William A Pellico PIP
31 Jan 2012
4057-v1 PIP - General Info William A Pellico PIP
31 Jan 2012
4050-v1 Progress in the RF/Thermal Modeling Effort of the Booster Cavity Mohamed H Hassan PIP
HLRF
18 Jan 2012
4049-v1 Booster Bias Supply Upgrade Patrick G. Sheahan PIP
HLRF
18 Jan 2012
4042-v3 Status of Linac Lattice Study H.J Kim PIP
Linac
Beam Physics
11 Jan 2012
4041-v1 PIP - General Info William A Pellico PIP
11 Jan 2012
4040-v1 Booster Notching Absorber Design Vladimir Sidorov Booster
PIP
10 Jan 2012
4038-v1 Fermilab Booster Model Calibration Alexey Petrenko Booster
PIP
10 Jan 2012
4037-v1 Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP
09 Jan 2012
4036-v1 PIP - General Info William A Pellico PIP
09 Jan 2012
4032-v1 PIP - General Info William A Pellico PIP
03 Jan 2012
4031-v1 PIP - General Info William A Pellico PIP
03 Jan 2012
4028-v2 Booster Digital Damper Status & Plans Nathan Eddy PIP
Beam Instrumentation
21 Dec 2011
4022-v1 Proton source 2012 shutdown schedule Mary Convery Booster
Linac
14 Dec 2011
4018-v1 PIP - General Info William A Pellico PIP
07 Dec 2011
4017-v1 PIP - General Info William A Pellico PIP
07 Dec 2011
4016-v1 Booster Bias Supply Upgrade Patrick G. Sheahan PIP
07 Dec 2011
4015-v1 Booster Beam Notching Overview for 2012 Salah Chaurize Booster
07 Dec 2011
4008-v1 PIP - General Info William A Pellico PIP
28 Nov 2011
4007-v3 Linac L1 Substation Upgrade Steven L. Hays PIP
Upgrades
23 Nov 2011
4006-v1 Orbit response matrix measurements and model calibration for the Fermilab Booster Alexey Petrenko Booster
PIP
23 Nov 2011
3999-v1 Booster Bias Supply and Cavity Upgrade Patrick G. Sheahan PIP
17 Nov 2011
3998-v1 PIP General Info William A Pellico PIP
17 Nov 2011
3997-v1 Booster Cogging Upgrades Kiyomi Seiya Upgrades
16 Nov 2011
3992-v1 Optice Measurements in the Booster Meghan J McAteer PIP
Beam Dynamics
09 Nov 2011
3989-v2 Booster Linear Coupling Measurement and comparison with MAD8 Yuri Alexahin et al. PIP
Studies
09 Nov 2011
3985-v1 PIP - Linac:7835 Procurement Strategy Fernanda G Garcia PIP
Linac
Upgrades
Operations
Projects
02 Nov 2011
3976-v1 PIP Budget Codes Budget FY12 Updates William A Pellico et al. PIP
25 Oct 2011
3952-v1 Spare cavity status and tuner update Matt Slabaugh Booster
PIP
28 Sep 2011
3926-v1 Proton Improvement Plan -- Preliminary Overview of FY12 Bob Webber Booster
PIP
Linac
24 Aug 2011
3920-v1 PIP- Booster RF -- Spare Cavity Status Matt Slabaugh Booster
PIP
HLRF
10 Aug 2011
3904-v2 Linac 200 MHz Power Systems Meeting Minutes Bob Webber HLRF
Linac
15 Jul 2011
3878-v1 Proton Source Improvement Plan to DOE in March 2011 Stuart Henderson Booster
Linac
03 Jun 2011
3740-v2 Booster Cogging - Proton Source Improvement Workshop William A Pellico Booster
22 Dec 2010
Number of documents found: 202

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 2 wallclock secs ( 0.48 usr + 0.12 sys = 0.60 CPU)