Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
646-v1 A48 Collimator: Beam Physics Justification and Simulation Alexandr Drozhdin et al. Energy Deposition
Collimators
02 Jun 2008
647-v3 Tevatron Abort Kicker Prefire Simulations (Review of the A48 Collimator Design) Alexandr Drozhdin Energy Deposition
Collimators
02 Jun 2008
1390-v3 Abort Gap Monitoring Utilizing Synchrotron Light Randy M Thurman-Keup SyncLite (SL)
Instrumentation
Abort Gap Measurements
19 Feb 2008
1098-v4 Synclite & AGI Harware Setup Eugene Lorman et al. SyncLite (SL)
Instrumentation
Abort Gap Measurements
29 Jan 2008
2519-v1 AGI Status Randy M Thurman-Keup SyncLite (SL)
Emittance
Instrumentation
Tevatron Group
Abort Gap Measurements
13 Oct 2006
2165-v1 Monitoring Abort Gap Beam Intensity in the Tevatron Using Synchrotron Radiation Randy M Thurman-Keup SyncLite (SL)
Instrumentation
Abort Gap Measurements
22 Feb 2006
1889-v1 DC Beam Measurements Randy M Thurman-Keup Instrumentation
Abort Gap Measurements
05 Jul 2005
1807-v1 MI Abort line bpm's Robert Dysert et al. BPM
04 May 2005
1760-v1 Abort Gap Monitoring Randy M Thurman-Keup Instrumentation
Abort Gap Measurements
28 Mar 2005
1589-v1 some sbd and agi data on teV damper issues Stephen Pordes SyncLite (SL)
Sampled Bunch Display (SBD)
Abort Gap Measurements
23 Feb 2005
1547-v1 Tevatron Abort Loop Status Jerry Annala TeV ABORT
Run II
Status
28 Jan 2005
1460-v1 Status of Synclite Randy M Thurman-Keup SyncLite (SL)
Instrumentation/beam Physics
Instrumentation
Abort Gap Measurements
17 Nov 2004
1340-v2 Talk on new BLM system for Controls Group -- 14 Sept 2004 Jonathan D Lewis Beam Loss Monitors (BLM)
TeV ABORT
13 Sep 2004
1219-v1 Tevatron Abort Gap Monitor Timing Controls Tom Meyer et al. Intensity Measurements
SyncLite (SL)
TeV ABORT
Instrumentation
23 Jun 2004
1218-v1 Abort Gap Monitor Status presented at Beam Phys/Inst Mtg. Randy M Thurman-Keup SyncLite (SL)
Instrumentation
23 Jun 2004
1217-v1 Abort Gap Monitor results presented at TeV Mtg. Randy M Thurman-Keup SyncLite (SL)
Instrumentation
23 Jun 2004
1216-v1 Abort Gap Monitor Talk at LARP Mtg. Randy M Thurman-Keup SyncLite (SL)
Instrumentation
23 Jun 2004
1162-v2 Abort Gap Monitoring Status Randy M Thurman-Keup SyncLite (SL)
Talks
Instrumentation
23 Jun 2004
1195-v1 Abort Gap Synch Light Results from 6/4/04 TeV Meeting Randy M Thurman-Keup SyncLite (SL)
Instrumentation
04 Jun 2004
1194-v1 Abort Gap Synch Light results from 5/28/04 TeV Meeting Randy M Thurman-Keup SyncLite (SL)
Instrumentation
04 Jun 2004
1144-v1 Resonant Charging of A0 Kickers George E. Krafczyk Kickers and Separators
26 Apr 2004
1131-v1 Tevatron Proposed BLM system review Slides v3 Alan Baumbaugh Beam Loss Monitors (BLM)
TeV ABORT
Instrumentation
19 Apr 2004
1000-v1 EE Support Abort Talk Daniel A. Wolff Beam Loss Monitors (BLM)
04 Feb 2004
Number of documents found: 23

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.25 usr + 0.04 sys = 0.29 CPU)