Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
3649-v2 8-GeV Pbar Horizontal instability in Main Injector Ming-jen Yang et al. Main Injector
Instabilities
10 Aug 2010
3220-v2 Preparation of Accelerator Complex for Muon Physics Experiments at Fermilab Chuck Ankenbrandt et al. Antiproton Source
28 Oct 2008
2949-v1 Debuncher Transverse Cooling Measurements - Fall 2007 Steve Werkema Stochastic Cooling
04 Dec 2007
2913-v1 Debuncher Transverse Cooling Measurements - Fall 2006 Steve Werkema Stochastic Cooling
01 Nov 2007
2783-v1 Recent Lattice Developments in the Antiproton Source Vladimir Nagaslaev Lattice
17 May 2007
2645-v1 Record Luminosities at the Tevatron & Future Potentiality Steve Werkema Recycler
Main Injector
Tevatron
BPM
Antiproton Source
20 Feb 2007
1742-v3 Antiproton Source Target Rotation Motor Controller David W. Peterson et al. Target Station
07 Aug 2006
2245-v1 Antiproton Source Studies and Stacking Keith E Gollwitzer Studies/Commissioning
Accumulator
Stochastic Cooling
Instrumentation
Accelerator Seminar
Transfer Lines
Debuncher
Lattice
18 Apr 2006
2091-v1 BEAM BASED ALIGNMENT OF THE DEBUNCHER INJECTION SEPTUM Dave McGinnis Transfer Lines
Debuncher
08 Jan 2006
1452-v3 Measuring and Adjusting Debuncher Tunes Brian E. Drendel Operations
Instrumentation
Debuncher
Lattice
Beam Dynamics
13 Oct 2005
1453-v2 Measuring and Adjusting Accumulator Tunes Brian E. Drendel Accumulator
Operations
Instrumentation
Lattice
Beam Dynamics
13 Oct 2005
1980-v1 Phase Space and Antiproton Production at Fermilab Dave McGinnis Beam Dynamics
Accumulator
Beam Dynamics
Beam Dynamics
Debuncher
04 Oct 2005
1941-v1 ANTIPROTON AND NEUTRINO PRODUCTION ACCELERATOR TIMELINE ISSUES Dave McGinnis General
Accumulator
29 Aug 2005
1496-v3 Using Time Separation of Signals to Obtain Independent Proton and Antiproton Beam Position Measurements Around the Tevatron Bob Webber BPM
BPM
BPM
06 May 2005
1150-v3 Recycler transverse instability Sergei Nagaitsev Beam Dynamics
07 May 2004
1042-v1 Analysis of Tevatron Complex Reliability Elliott S McCrory None
25 Feb 2004
1021-v1 Pbar Rookie Book Jim P Morgan et al. Training Docs
13 Feb 2004
1019-v1 Antiproton Source Debuncher BPM using Synchronous Detection James A. Budlong et al. Hardware
Front-end Systems
BPM
BPM
13 Feb 2004
1016-v1 A Simple Protocol for Data Exchange With Small Processors Glenn C. Johnson et al. LLRF
Java Data Acquisition
Acnet
12 Feb 2004
762-v8 Simulation of Main Injector 2.5 MHz Pbar Acceleration with Space Charge and Beam Loading Effects Vincent Wu Beam Dynamics
15 Dec 2003
337-v1 Another High Dispersion - Low beta Recycler Insert John A. Johnstone Beam Instrumentation
Beam Dynamics
Magnets
Lattice
14 Aug 2003
169-v1 Recycler Pbar Transfer Lines David E. Johnson Transfer Lines
01 Aug 2003
179-v2 Magnetic Field Quality Specification for Recycler Ring Combined Function and Quadrupole Magnets Norman M. Gelfand et al. Magnets
Studies
23 Jul 2003
213-v1 Main Injector and Beamline Naming Conventions David E. Johnson et al. Controls
Lattice
Civil
08 Jul 2003
77-v1 Instrumentation Requirements for the Fermilab Main Injector David E. Johnson Beam Instrumentation
Beam Dynamics
23 Jun 2003
633-v1 A New Antiproton Beam Transfer Scheme without Coalescing Weiren Chou et al. Studies
Longitudinal Dynamics
LLRF
Operations
Beam Dynamics
Beam Transfer
Multiparticle
28 May 2003
747-v1 Slip Stacking at Low Intensity – Status of the Beam Studies Kiyomi Seiya RF
Beam Instrumentation
Studies
LLRF
Beam Dynamics
03 Feb 2003
392-v1 Notes for MI/RR Group Meeting of 08 Jan 2003 Bruce C. Brown MI-RR-Group
Studies
15 Jan 2003
744-v1 Simulation of Pbar Stacking and Un-Stacking in the Recycler Ring Chandrashekhara M. Bhat RF
Beam Instrumentation
Studies
Beam Dynamics
01 Sep 2002
362-v1 Pbar Acceleration in the Main Injector RR/AR - MI - Tevatron - Simulations and Tune up Studies Using Protons Chandrashekhara M. Bhat RF
Beam Instrumentation
Studies
20 Nov 2000
354-v1 Pbar Acceleration in the Main Injector for Run II: ESME Simulations Chandrashekhara M. Bhat et al. RF
Beam Instrumentation
Studies
26 Jul 2000
353-v1 Slow Deceleration of Anti-Proton Beam in the MI: RF Specifications Chandrashekhara M. Bhat RF
Beam Instrumentation
12 Jun 2000
349-v1 Anti-Proton Beam Acceleration in the MI and RF Specifications Chandrashekhara M. Bhat RF
Beam Instrumentation
26 Jan 2000
333-v2 Main Injector Commissioning Plan C. Shekhar Mishra Beam Instrumentation
Operations
Commissioning
22 Jul 1998
323-v2 Beam Position Monitors for the Fermilab Recycler Ring Ed Barsotti, Jr. et al. Beam Instrumentation
BPM
BPM
29 Apr 1998
310-v1 Options for Line-of-Sight Signal Transmission of the Recycler Stochastic Cooling Systems Gerald P. Jackson Stochastic Cooling
Magnets
27 Oct 1997
200-v1 Mass Separation in a Proton Analog of a 5 MeV Electron Beam Kirt J. Bertsche Beam Instrumentation
Electron Cooling
Electron Cooling
01 Aug 1996
174-v1 Momentum Stacking in the Recycler John P. Marriner Beam Dynamics
01 Apr 1996
172-v1 Stochastic Cooling of the Recycler Antiproton Stack Momentum Spread Including Intrabeam Scattering and Barrier Buckets Gerald P. Jackson Stochastic Cooling
29 Mar 1996
154-v2 Transverse Schottky Detector for Antiproton Recycle Ring Ping J. Chou Beam Instrumentation
18 Dec 1995
143-v1 Design Specifications for the 90o Dipoles for the Recycler Ring Electron Cooling Beamline Gerald P. Jackson Electron Cooling
Magnets
Magnets
14 Aug 1995
136-v2 µ-Dose Level in the Vicinity of the Intersection of the 8 GeV and the AP2-Beamlines Chandrashekhara M. Bhat Beam Dynamics
ES&H
28 Jun 1995
29-v1 150 GeV and Revised 120 GeV Ramps Philip S. Martin Power Supplies
06 Dec 1990
35-v1 Proposal for MI Injection and Extraction Kickers John A. Dinkel Magnets
10 Jun 1990
Number of documents found: 44

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.22 usr + 0.02 sys = 0.24 CPU)