339-v2 |
Stripline Detectors for Fermilab Main Injector |
James L. Crisp et al. |
Beam Dynamics
Beam Instrumentation
|
26 Sep 2019 |
372-v2 |
Calibration of the Recycler Transverse Schottky Detectors |
Martin J. Hu |
ACNET
Schottky
Beam Instrumentation
|
26 Sep 2019 |
350-v2 |
GFSDA Tune Measurement in the Main Injector |
David A. Herrup |
Beam Instrumentation
Tune Measurement
|
26 Sep 2019 |
6811-v4 |
AD/Instrumentation Status Meeting Minutes and Slides |
Craig C Drennan |
Monitoring Instrumentation
IOTA
Beamline
Beam Instrumentation
Beam Instrumentation
PXIE
Beam Instrumentation
FAST
Beam Instrumentation
Instrumentation
|
10 Jul 2019 |
6270-v2 |
Al Tag Radiation Studies for Instrumentation in the Main Injector |
Bruce C. Brown et al. |
Recycler
Beam Instrumentation
Photographs
ES&H
Beam Instrumentation
Main Injector
Instrumentation
|
13 Apr 2018 |
6049-v4 |
LBNF Hadron Monitor Notes |
Craig C Drennan |
Ion Profile Monitor
|
24 Jan 2018 |
4519-v1 |
Studies of MI Beam Intensity, Loss and Activation Patterns |
Bruce C. Brown |
DCCTs
Beam Instrumentation
ES&H
|
16 Feb 2017 |
4867-v1 |
Calibration of BLM Response to Proton Loss |
Bruce C. Brown |
Beam Loss Monitors (BLM)
Beam Instrumentation
ES&H
Collimation
|
30 Jun 2015 |
4504-v2 |
Tomography And Related Diagnostics In Synchrotrons: An Introduction |
Duncan J Scott |
Beam Instrumentation
Longitudinal Dynamics
Beam Instrumentation
|
09 Jan 2014 |
4503-v1 |
Introduction to Longitudinal Phase Space Tomography |
Duncan J Scott |
Longitudinal Dynamics
|
09 Jan 2014 |
3723-v13 |
Booster Beam Loss Monitor Integrator and Data Acquisition Upgrade |
Craig C Drennan |
Operations
Front-end Services
Beam Instrumentation
|
17 Apr 2013 |
3367-v1 |
Characterization of the Fast Phase Detector in the Booster LLRF System |
Craig C Drennan |
Operations
Controls
LLRF
|
24 Jul 2012 |
3940-v1 |
Linac Toroid Upgrade Meeting Summaries -- Sept, 2, 2011 -- Oct. 27, 2011 |
Craig C Drennan |
Beam Instrumentation
Front-end Systems
Intensity Measurements
|
16 Jul 2012 |
3890-v1 |
Booster BLM and BPM upgrade Meeting Minutes, Fall 2010 |
Craig C Drennan |
Front-end Systems
Beam Instrumentation
|
29 Jun 2011 |
3730-v3 |
Linac and Booster Beam Diagnostics |
Craig C Drennan |
Beam Instrumentation
Beam Instrumentation
|
07 Dec 2010 |
3643-v1 |
Examination of BGA and LGA Connections on the Booster LLRF DDS Module Prototype |
Craig C Drennan |
LLRF
|
21 Jul 2010 |
3642-v1 |
Booster Wire Scanner Integrator |
Craig C Drennan |
Beam Instrumentation
|
20 Jul 2010 |
3615-v1 |
Optical Beam Position Monitor for Sub-picosecond Spatio-temporal Correlation Monitoring |
Timothy J Maxwell |
Experiments
|
24 May 2010 |
3486-v6 |
Installation Planning for BPM-HRM Booster DAQ Extension |
Craig C Drennan |
Beam Instrumentation
|
14 Dec 2009 |
3454-v1 |
Detection of Quadrupole Magnetic Center Using Beam Based Diagnostics |
Anatoli Makarevich et al. |
Alignment
Instrumentation
BPM
|
21 Sep 2009 |
3299-v2 |
Some Console Applications for Displaying Main Injector BLM Measurements |
Bruce C. Brown et al. |
Beam Loss Monitors (BLM)
Beam Instrumentation
Operations
Collimation
Console Applications
|
24 Jun 2009 |
3376-v1 |
Booster BPM Info and Measurement Summary |
James A. Fitzgerald |
Beam Instrumentation
|
27 Apr 2009 |
2828-v4 |
Requirements for the Booster LLRF DDS Module |
Craig C Drennan et al. |
Hardware
LLRF
|
15 Apr 2009 |
3343-v1 |
HINS Beam Dynamics & Diagnostics Mini-Workshop |
Jean-Paul Carneiro et al. |
Beam Dynamics
Future Accelerators
Beam Instrumentation
Linac
Instrumentation
Adv. Accelerator R&D
|
20 Mar 2009 |
3281-v1 |
Microwave Electron Cloud Measurements in the Main Injector |
James L. Crisp et al. |
Beam Instrumentation
Project X
|
13 Jan 2009 |
3097-v1 |
Impressions from the 13th Beam Instrumentation Workshop BIW2008 |
Vsevolod Kamerdzhiev et al. |
Accelerator Seminar
Instrumentation
|
21 May 2008 |
3028-v1 |
Recycler batch length effects on R:BEAM as measured with a Bergoz 'New Parametric Current Transformer' |
James L. Crisp |
DCCTs
Beam Instrumentation
Intensity Measurements
|
11 Feb 2008 |
2931-v1 |
ODR Imaging of ILC Lepton Beams |
Alex H. Lumpkin |
NML
|
09 Nov 2007 |
2930-v1 |
OTR Imaging Considerations for ILC-TA at NML |
Alex H. Lumpkin |
NML
|
09 Nov 2007 |
2748-v1 |
RF phase stability measurements at NML |
Sergei Nagaitsev |
LLRF
NML
Instrumentation
|
18 Apr 2007 |
2612-v1 |
EO introduction and plan in A0 |
Jinhao Ruan |
Beam Instrumentation
Instrumentation
|
08 Feb 2007 |
2584-v1 |
The Measurements and Analysis of Electromagnetic Interference arising from the Booster GMPS |
Weiren Chou et al. |
Power Supplies
Beam Instrumentation
|
11 Dec 2006 |
2469-v1 |
MI BPM Board-by-Board Gain Values |
Marv Olson et al. |
BPM
Beam Instrumentation
BPM
|
22 Sep 2006 |
2453-v2 |
Proposed MI BPM 53 MHz Channel Transition Board Gain Settings |
Robert Dysert et al. |
BPM
Beam Instrumentation
BPM
|
15 Sep 2006 |
2435-v1 |
Specification for a MI BPM diagnostics program |
Marv Olson et al. |
BPM
Beam Instrumentation
|
01 Sep 2006 |
2391-v1 |
Timing Comparison of Pbars in Main Injector to Recycler and to Tevatron |
Steve Foulkes et al. |
BPM
Beam Instrumentation
BPM
|
15 Aug 2006 |
2382-v1 |
Using MathCad to Generate a Polynomial for Computation of Beam Position from MI Extra-Wide Aperture BPM |
Milton Smith |
BPM
Beam Instrumentation
BPM
|
08 Aug 2006 |
2371-v1 |
Note on Position Sensitivity of the Sum Signal from a Main Injector Extra-Wide Aperture BPM |
Bob Webber |
BPM
Beam Instrumentation
BPM
BPM
Intensity Measurements
|
01 Aug 2006 |
2348-v1 |
Model of RF Leakage Effect on MI Beam Position Measurement |
Bob Webber |
BPM
Beam Instrumentation
BPM
BPM
|
14 Jul 2006 |
2280-v1 |
MI Extra Wide Aperture BPM Scaling in Difference-Over-Sum BPM System |
Bob Webber |
BPM
Beam Instrumentation
BPM
BPM
|
05 Jun 2006 |
2273-v3 |
MI Extra Wide Aperture BPM Scaling in AM-PM BPM System |
Bob Webber |
BPM
Beam Instrumentation
BPM
BPM
|
26 May 2006 |
2274-v1 |
Analog Signal Pre-Processing For The Fermilab Main Injector BPM Upgrade |
Stefano M Rapisarda et al. |
BPM
BPM
|
22 May 2006 |
2153-v1 |
Main Injector BPM Test Stand Data |
Bob Webber |
BPM
Beam Instrumentation
BPM
BPM
|
18 Feb 2006 |
2110-v1 |
Optical Transition Radiation (OTR) Detectors for Beam Diagnostics |
Vic Scarpine |
Accelerator Seminar
|
24 Jan 2006 |
2101-v2 |
MI BPM EchoTek/GrayChip Bandwidths |
Bob Webber |
BPM
Beam Instrumentation
BPM
|
16 Jan 2006 |
1322-v2 |
Main Injector/NuMI BPM Scaling - Analysis of Main Injector HP602 and HP604 BPM Data from Traditional Main Injector and NuMI BPM Systems |
Bob Webber |
Commissioning
Monitoring Instrumentation
BPM
Beam Instrumentation
BPM
General
|
03 Oct 2005 |
1958-v2 |
Antiproton Beam Position Measurements with Prototype Equipment at MI-30 |
Charles Briegel et al. |
Beam Instrumentation
BPM
BPM
|
19 Sep 2005 |
1956-v1 |
Qualification of the Haynes 10/7 Digitizer Clock Signal |
Peter Prieto et al. |
BPM
Beam Instrumentation
BPM
|
12 Sep 2005 |
1892-v1 |
Recycler Transverse Damper Status |
James L. Crisp |
Instabilities
BPM
BPM
Beam Dynamics
Dampers
|
06 Jul 2005 |
1880-v1 |
A First Look at Direct Measurements of Beta-Star in the Tevatron |
Michael J. Syphers |
Collision Point Monitor (CPM)
Transverse Dynamics
Studies
Beam Studies
BPM
Optics
BPM
|
30 Jun 2005 |
1870-v1 |
Improved emittance measurement system for the flat-beam experiment at FNPL |
Philippe R.-G. Piot et al. |
Diagnostics
Experiments
|
14 Jun 2005 |
1791-v1 |
Beamline BPM Upgrade |
Nathan Eddy et al. |
Run II
BPM
BPM
|
25 Apr 2005 |
1337-v2 |
notes from Instrumentation/Beam Physics Meetings |
Nathan Eddy et al. |
Ion Profile Monitor
Dampers
Flying Wires
DCCTs
Abort Gap Measurements
Tune Measurement
Schottky
SyncLite (SL)
Sampled Bunch Display (SBD)
Instrumentation/beam Physics
FBI
Intensity Measurements
|
29 Mar 2005 |
1753-v2 |
BPM Projects - Breakout Talk for March 2005 DOE Review of TeV Operations |
Bob Webber |
BPM
BPM
|
25 Mar 2005 |
1750-v1 |
SY120 BPM Electronics Measurements |
James A. Fitzgerald |
Extraction
SY120
BPM
|
23 Mar 2005 |
1594-v1 |
Analysis of Longitudinal Phase Monitor Signal during Store #4004 Including Beam Blow-up |
Bob Webber |
RF
General
Instrumentation
Longitudinal Dynamics
|
27 Feb 2005 |
1584-v1 |
Collection of BPM Related Papers from the Tev Commissioning Era |
Alan Baumbaugh et al. |
Beam Loss Monitors (BLM)
Instrumentation
BPM
BPM
BPM
Intensity Measurements
|
18 Feb 2005 |
1529-v1 |
The CIC Filter |
Gustavo Cancelo |
Tevatron BPM
BPM
BPM
|
14 Jan 2005 |
1485-v1 |
Pbar Stacking Report |
Dave McGinnis |
Instrumentation
Lattice
Alignment
Transfer Lines
Debuncher
Accumulator
Stochastic Cooling
|
05 Dec 2004 |
1470-v1 |
Communicating Machine States via MDAT to the BLM Upgrade |
Jonathan D Lewis |
Beam Loss Monitors (BLM)
Beam Instrumentation
TeV ABORT
|
23 Nov 2004 |
1435-v1 |
The NUMI Beamline |
Samuel R. Childress et al. |
Target Hall Systems
Commissioning
Monitoring Instrumentation
Extraction from Main Injector
Run II
Focusing Horns
Primary Proton Beam
|
04 Nov 2004 |
1415-v4 |
Relationship Between Beam Position Monitor Log Ratio and Difference-Over-Sum Formulations |
Bob Webber |
BPM
BPM
|
21 Oct 2004 |
1199-v2 |
Emittance Growth Due to Tevatron Flying Wires |
Nathan Eddy et al. |
Emittance
Beam Transfer
Flying Wires
EXP Notes
Flying Wires
Multiparticle
|
16 Sep 2004 |
1344-v1 |
Main Injector bpm scale factors |
James L. Crisp |
BPM
Beam Instrumentation
|
14 Sep 2004 |
1336-v1 |
Radiation tests of the Texas Instruments TLK2501 in the Tevatron Tunnel |
Andreas Jansson |
Ion Profile Monitor
Instrumentation
|
08 Sep 2004 |
1161-v1 |
Tevatron BPM Upgrade Calibration Specifications |
Jim Steimel |
Tevatron BPM
BPM
BPM
BPM
|
06 May 2004 |
1088-v1 |
Determining Beta-Star in the Tevatron |
Michael J. Syphers |
Collision Point Monitor (CPM)
Beam Studies
Instrumentation
BPM
Optics
BPM
BPM
|
29 Mar 2004 |
1090-v1 |
Picture of Proton SyncLight Box with Light Splitter Installed |
Jim Fast et al. |
Instrumentation
SyncLite (SL)
|
29 Mar 2004 |
875-v3 |
Notes and associated documents from Instrumentation/beam physics meetings |
Jean Slaughter |
Instrumentation
Beam Instrumentation
Sampled Bunch Display (SBD)
|
09 Jan 2004 |
957-v1 |
Tevatron Transverse Dampers and Head-Tail effects |
Alexey Burov et al. |
Transverse Dynamics
C0 Lambertson Replacement
chromaticity
Dampers
Run II
|
30 Dec 2003 |
554-v4 |
Tevatron Beam Position Monitor Upgrade Requirements |
Jerry Annala et al. |
Instrumentation
BPM
BPM
BPM
|
12 Nov 2003 |
904-v1 |
Tevatron BPM Cable and Related Measurements |
Fritz DeJongh et al. |
Tevatron BPM
BPM
BPM
|
07 Nov 2003 |
867-v1 |
Recycler_BPM_Sign_Conventions |
Peter Prieto et al. |
BPM
Beam Instrumentation
|
06 Oct 2003 |
808-v1 |
Accelerator Clocks |
Gregory L. Vogel |
Hardware
Tevatron BPM
BPM
BPM
|
26 Aug 2003 |
791-v1 |
Using CDF and D0 Data to Understand the Tevatron |
Jean Slaughter |
Shot Data Analysis (SDA)
Instrumentation
|
14 Aug 2003 |
337-v1 |
Another High Dispersion - Low beta Recycler Insert |
John A. Johnstone |
Lattice
Magnets
Beam Instrumentation
Beam Dynamics
|
14 Aug 2003 |
764-v1 |
BLM Data Structures and General Information by Al Baumbaugh |
Alan Baumbaugh |
Beam Loss Monitors (BLM)
Instrumentation
BPM
|
07 Aug 2003 |
369-v1 |
Longitudinal Schottky Pickup for the Recycler |
Edward W. Cullerton et al. |
Schottky
Beam Instrumentation
|
29 Jul 2003 |
658-v1 |
Calibration of the SBD- 6-6-03 |
Alvin Tollestrup |
Instrumentation
Sampled Bunch Display (SBD)
Tevatron Group
|
06 Jun 2003 |
541-v2 |
Tev SBD response and Toy algorithm for unscrambling longitudinal phase space |
Alvin Tollestrup |
Emittance
Instrumentation
Run II
Sampled Bunch Display (SBD)
|
21 May 2003 |
748-v1 |
Emittance measurement and acceleration Revision of MI-0294 |
Kiyomi Seiya |
LLRF
Beam Dynamics
Beam Instrumentation
Studies
|
10 Apr 2003 |
379-v2 |
RECYCLER BPM SYSTEM UPGRADE |
Ming-jen Yang |
BPM
|
13 Jan 2003 |
138-v1 |
Requirements for the Recycler Ring and Associated Transfer Line BPMs |
Brajesh Choudhary |
BPM
Beam Instrumentation
BPM
Beam Instrumentation
|
07 Feb 2003 |
744-v1 |
Simulation of Pbar Stacking and Un-Stacking in the Recycler Ring |
Chandrashekhara M. Bhat |
Beam Dynamics
RF
Beam Instrumentation
Studies
|
01 Sep 2002 |
376-v1 |
A First Look at the Longitudinal Emittance in the Fermilab Recycler Ring |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
Beam Dynamics
|
02 Aug 2002 |
373-v1 |
BPM System Requirements |
Martin J. Hu |
BPM
BPM
Beam Instrumentation
|
29 Jul 2002 |
743-v1 |
Pbar Acceleration in the MI using 2.5 MHz Coalescing RF system: Tune-up Study Scheme with proton beams and Operational Implementation |
Chandrashekhara M. Bhat et al. |
LLRF
LLRF
RF
Beam Instrumentation
|
14 Feb 2001 |
362-v1 |
Pbar Acceleration in the Main Injector RR/AR - MI - Tevatron - Simulations and Tune up Studies Using Protons |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
Studies
|
20 Nov 2000 |
353-v1 |
Slow Deceleration of Anti-Proton Beam in the MI: RF Specifications |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
|
12 Jun 2000 |
349-v1 |
Anti-Proton Beam Acceleration in the MI and RF Specifications |
Chandrashekhara M. Bhat |
RF
Beam Instrumentation
|
26 Jan 2000 |
333-v2 |
Main Injector Commissioning Plan |
C. Shekhar Mishra |
Commissioning
Beam Instrumentation
Operations
|
22 Jul 1998 |
317-v1 |
Addendum to MI-0226 |
Gregory L. Vogel |
RF
Beam Instrumentation
BPM
|
24 Jun 1998 |
328-v1 |
Transient Measurement of the Betatron Phase Advance Around the Recycler Ring |
Gerald P. Jackson |
Lattice
Controls
Beam Instrumentation
|
16 May 1998 |
312-v1 |
Recycler Instrumentation: Detector and Electronics Locations |
Gregory L. Vogel |
Alignment
Beam Instrumentation
|
01 Dec 1997 |
224-v1 |
8 GeV Line Instrumentation: Locations and Rack Layouts |
Gregory L. Vogel |
Beam Instrumentation
Civil
|
29 Oct 1996 |
223-v1 |
MI Instrumentation: Layouts and Rack Layouts |
Gregory L. Vogel |
Controls
BPM
Beam Instrumentation
Schottky
|
21 Oct 1996 |
137-v1 |
Design of the Beam Profile Monitor for Phase 1 of the 5 MeV Electron Cooling Test Beam Facility |
Gerald P. Jackson |
Beam Instrumentation
|
11 Aug 1995 |
82-v1 |
Summary of the Existing MR Beam Diagnostics for Use in Main Injector |
Chandrashekhara M. Bhat et al. |
Beam Instrumentation
Beam Dynamics
|
01 Mar 1993 |
72-v1 |
Main Injector Correctors Workshop, Friday, May 8, 1992, Fermilab |
Management of Main Injector Project |
Magnets
MI-Dept
|
08 May 1992 |