Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
4519-v1 Studies of MI Beam Intensity, Loss and Activation Patterns Bruce C. Brown Beam Instrumentation
ES&H
DCCTs
16 Feb 2017
4867-v1 Calibration of BLM Response to Proton Loss Bruce C. Brown Beam Instrumentation
Beam Loss Monitors (BLM)
ES&H
Collimation
30 Jun 2015
4504-v2 Tomography And Related Diagnostics In Synchrotrons: An Introduction Duncan J Scott Beam Instrumentation
Longitudinal Dynamics
Beam Instrumentation
09 Jan 2014
4503-v1 Introduction to Longitudinal Phase Space Tomography Duncan J Scott Longitudinal Dynamics
09 Jan 2014
3723-v13 Booster Beam Loss Monitor Integrator and Data Acquisition Upgrade Craig C Drennan Front-end Services
Operations
Beam Instrumentation
17 Apr 2013
3367-v1 Characterization of the Fast Phase Detector in the Booster LLRF System Craig C Drennan LLRF
Operations
Controls
24 Jul 2012
3940-v1 Linac Toroid Upgrade Meeting Summaries -- Sept, 2, 2011 -- Oct. 27, 2011 Craig C Drennan Beam Instrumentation
Front-end Systems
Intensity Measurements
16 Jul 2012
3890-v1 Booster BLM and BPM upgrade Meeting Minutes, Fall 2010 Craig C Drennan Front-end Systems
Beam Instrumentation
29 Jun 2011
3730-v3 Linac and Booster Beam Diagnostics Craig C Drennan Beam Instrumentation
Beam Instrumentation
07 Dec 2010
3643-v1 Examination of BGA and LGA Connections on the Booster LLRF DDS Module Prototype Craig C Drennan LLRF
21 Jul 2010
3642-v1 Booster Wire Scanner Integrator Craig C Drennan Beam Instrumentation
20 Jul 2010
3615-v1 Optical Beam Position Monitor for Sub-picosecond Spatio-temporal Correlation Monitoring Timothy J Maxwell Experiments
24 May 2010
3486-v6 Installation Planning for BPM-HRM Booster DAQ Extension Craig C Drennan Beam Instrumentation
14 Dec 2009
3454-v1 Detection of Quadrupole Magnetic Center Using Beam Based Diagnostics Anatoli Makarevich et al. Alignment
Instrumentation
BPM
21 Sep 2009
3299-v2 Some Console Applications for Displaying Main Injector BLM Measurements Bruce C. Brown et al. Beam Instrumentation
Beam Loss Monitors (BLM)
Operations
Collimation
Console Applications
24 Jun 2009
3376-v1 Booster BPM Info and Measurement Summary James A. Fitzgerald Beam Instrumentation
27 Apr 2009
2828-v4 Requirements for the Booster LLRF DDS Module Craig C Drennan et al. Hardware
LLRF
15 Apr 2009
3343-v1 HINS Beam Dynamics & Diagnostics Mini-Workshop Jean-Paul Carneiro et al. Beam Instrumentation
Linac
Beam Dynamics
Future Accelerators
Instrumentation
Adv. Accelerator R&D
20 Mar 2009
3281-v1 Microwave Electron Cloud Measurements in the Main Injector James L. Crisp et al. Beam Instrumentation
Project X
13 Jan 2009
3097-v1 Impressions from the 13th Beam Instrumentation Workshop BIW2008 Vsevolod Kamerdzhiev et al. Accelerator Seminar
Instrumentation
21 May 2008
3028-v1 Recycler batch length effects on R:BEAM as measured with a Bergoz 'New Parametric Current Transformer' James L. Crisp Beam Instrumentation
Intensity Measurements
DCCTs
11 Feb 2008
2931-v1 ODR Imaging of ILC Lepton Beams Alex H. Lumpkin NML
09 Nov 2007
2930-v1 OTR Imaging Considerations for ILC-TA at NML Alex H. Lumpkin NML
09 Nov 2007
2748-v1 RF phase stability measurements at NML Sergei Nagaitsev LLRF
NML
Instrumentation
18 Apr 2007
2612-v1 EO introduction and plan in A0 Jinhao Ruan Beam Instrumentation
Instrumentation
08 Feb 2007
2584-v1 The Measurements and Analysis of Electromagnetic Interference arising from the Booster GMPS Weiren Chou et al. Power Supplies
Beam Instrumentation
11 Dec 2006
2469-v1 MI BPM Board-by-Board Gain Values Marv Olson et al. Beam Instrumentation
BPM
BPM
22 Sep 2006
2453-v2 Proposed MI BPM 53 MHz Channel Transition Board Gain Settings Robert Dysert et al. Beam Instrumentation
BPM
BPM
15 Sep 2006
2435-v1 Specification for a MI BPM diagnostics program Marv Olson et al. Beam Instrumentation
BPM
01 Sep 2006
2391-v1 Timing Comparison of Pbars in Main Injector to Recycler and to Tevatron Steve Foulkes et al. Beam Instrumentation
BPM
BPM
15 Aug 2006
2382-v1 Using MathCad to Generate a Polynomial for Computation of Beam Position from MI Extra-Wide Aperture BPM Milton Smith Beam Instrumentation
BPM
BPM
08 Aug 2006
2371-v1 Note on Position Sensitivity of the Sum Signal from a Main Injector Extra-Wide Aperture BPM Bob Webber Beam Instrumentation
BPM
BPM
Intensity Measurements
BPM
01 Aug 2006
2348-v1 Model of RF Leakage Effect on MI Beam Position Measurement Bob Webber Beam Instrumentation
BPM
BPM
BPM
14 Jul 2006
2280-v1 MI Extra Wide Aperture BPM Scaling in Difference-Over-Sum BPM System Bob Webber Beam Instrumentation
BPM
BPM
BPM
05 Jun 2006
2273-v3 MI Extra Wide Aperture BPM Scaling in AM-PM BPM System Bob Webber Beam Instrumentation
BPM
BPM
BPM
26 May 2006
2274-v1 Analog Signal Pre-Processing For The Fermilab Main Injector BPM Upgrade Stefano M Rapisarda et al. BPM
BPM
22 May 2006
2153-v1 Main Injector BPM Test Stand Data Bob Webber Beam Instrumentation
BPM
BPM
BPM
18 Feb 2006
2110-v1 Optical Transition Radiation (OTR) Detectors for Beam Diagnostics Vic Scarpine Accelerator Seminar
24 Jan 2006
2101-v2 MI BPM EchoTek/GrayChip Bandwidths Bob Webber Beam Instrumentation
BPM
BPM
16 Jan 2006
1322-v2 Main Injector/NuMI BPM Scaling - Analysis of Main Injector HP602 and HP604 BPM Data from Traditional Main Injector and NuMI BPM Systems Bob Webber Beam Instrumentation
Commissioning
Monitoring Instrumentation
BPM
General
BPM
03 Oct 2005
1958-v2 Antiproton Beam Position Measurements with Prototype Equipment at MI-30 Charles Briegel et al. Beam Instrumentation
BPM
BPM
19 Sep 2005
1956-v1 Qualification of the Haynes 10/7 Digitizer Clock Signal Peter Prieto et al. Beam Instrumentation
BPM
BPM
12 Sep 2005
1892-v1 Recycler Transverse Damper Status James L. Crisp Instabilities
BPM
Beam Dynamics
BPM
Dampers
06 Jul 2005
1880-v1 A First Look at Direct Measurements of Beta-Star in the Tevatron Michael J. Syphers Collision Point Monitor (CPM)
Transverse Dynamics
Studies
Beam Studies
BPM
Optics
BPM
30 Jun 2005
1870-v1 Improved emittance measurement system for the flat-beam experiment at FNPL Philippe R.-G. Piot et al. Diagnostics
Experiments
14 Jun 2005
1791-v1 Beamline BPM Upgrade Nathan Eddy et al. BPM
Run II
BPM
25 Apr 2005
1337-v2 notes from Instrumentation/Beam Physics Meetings Nathan Eddy et al. Tune Measurement
Ion Profile Monitor
Schottky
SyncLite (SL)
Sampled Bunch Display (SBD)
Instrumentation/beam Physics
Dampers
Flying Wires
FBI
Intensity Measurements
DCCTs
Abort Gap Measurements
29 Mar 2005
1753-v2 BPM Projects - Breakout Talk for March 2005 DOE Review of TeV Operations Bob Webber BPM
BPM
25 Mar 2005
1750-v1 SY120 BPM Electronics Measurements James A. Fitzgerald Extraction
SY120
BPM
23 Mar 2005
1594-v1 Analysis of Longitudinal Phase Monitor Signal during Store #4004 Including Beam Blow-up Bob Webber RF
Longitudinal Dynamics
General
Instrumentation
27 Feb 2005
1584-v1 Collection of BPM Related Papers from the Tev Commissioning Era Alan Baumbaugh et al. Beam Loss Monitors (BLM)
BPM
Instrumentation
BPM
Intensity Measurements
BPM
18 Feb 2005
1529-v1 The CIC Filter Gustavo Cancelo Tevatron BPM
BPM
BPM
14 Jan 2005
1485-v1 Pbar Stacking Report Dave McGinnis Instrumentation
Lattice
Alignment
Accumulator
Stochastic Cooling
Transfer Lines
Debuncher
05 Dec 2004
1470-v1 Communicating Machine States via MDAT to the BLM Upgrade Jonathan D Lewis Beam Instrumentation
Beam Loss Monitors (BLM)
TeV ABORT
23 Nov 2004
1435-v1 The NUMI Beamline Samuel R. Childress et al. Target Hall Systems
Commissioning
Focusing Horns
Monitoring Instrumentation
Extraction from Main Injector
Primary Proton Beam
Run II
04 Nov 2004
1415-v4 Relationship Between Beam Position Monitor Log Ratio and Difference-Over-Sum Formulations Bob Webber BPM
BPM
21 Oct 2004
1199-v2 Emittance Growth Due to Tevatron Flying Wires Nathan Eddy et al. Emittance
EXP Notes
Beam Transfer
Flying Wires
Flying Wires
Multiparticle
16 Sep 2004
1344-v1 Main Injector bpm scale factors James L. Crisp Beam Instrumentation
BPM
14 Sep 2004
1336-v1 Radiation tests of the Texas Instruments TLK2501 in the Tevatron Tunnel Andreas Jansson Ion Profile Monitor
Instrumentation
08 Sep 2004
372-v2 Calibration of the Recycler Transverse Schottky Detectors Martin J. Hu ACNET
Schottky
Beam Instrumentation
28 Jun 2004
1161-v1 Tevatron BPM Upgrade Calibration Specifications Jim Steimel Tevatron BPM
BPM
BPM
BPM
06 May 2004
1088-v1 Determining Beta-Star in the Tevatron Michael J. Syphers Collision Point Monitor (CPM)
BPM
Beam Studies
Instrumentation
BPM
Optics
BPM
29 Mar 2004
1090-v1 Picture of Proton SyncLight Box with Light Splitter Installed Jim Fast et al. SyncLite (SL)
Instrumentation
29 Mar 2004
875-v3 Notes and associated documents from Instrumentation/beam physics meetings Jean Slaughter Beam Instrumentation
Sampled Bunch Display (SBD)
Instrumentation
09 Jan 2004
957-v1 Tevatron Transverse Dampers and Head-Tail effects Alexey Burov et al. Transverse Dynamics
C0 Lambertson Replacement
chromaticity
Dampers
Run II
30 Dec 2003
554-v4 Tevatron Beam Position Monitor Upgrade Requirements Jerry Annala et al. BPM
Instrumentation
BPM
BPM
12 Nov 2003
904-v1 Tevatron BPM Cable and Related Measurements Fritz DeJongh et al. Tevatron BPM
BPM
BPM
07 Nov 2003
867-v1 Recycler_BPM_Sign_Conventions Peter Prieto et al. Beam Instrumentation
BPM
06 Oct 2003
808-v1 Accelerator Clocks Gregory L. Vogel Hardware
Tevatron BPM
BPM
BPM
26 Aug 2003
791-v1 Using CDF and D0 Data to Understand the Tevatron Jean Slaughter Shot Data Analysis (SDA)
Instrumentation
14 Aug 2003
337-v1 Another High Dispersion - Low beta Recycler Insert John A. Johnstone Magnets
Beam Instrumentation
Beam Dynamics
Lattice
14 Aug 2003
764-v1 BLM Data Structures and General Information by Al Baumbaugh Alan Baumbaugh Beam Loss Monitors (BLM)
Instrumentation
BPM
07 Aug 2003
369-v1 Longitudinal Schottky Pickup for the Recycler Edward W. Cullerton et al. Schottky
Beam Instrumentation
29 Jul 2003
658-v1 Calibration of the SBD- 6-6-03 Alvin Tollestrup Sampled Bunch Display (SBD)
Instrumentation
Tevatron Group
06 Jun 2003
541-v2 Tev SBD response and Toy algorithm for unscrambling longitudinal phase space Alvin Tollestrup Emittance
Sampled Bunch Display (SBD)
Instrumentation
Run II
21 May 2003
748-v1 Emittance measurement and acceleration – Revision of MI-0294 Kiyomi Seiya Beam Instrumentation
Studies
LLRF
Beam Dynamics
10 Apr 2003
379-v2 RECYCLER BPM SYSTEM UPGRADE Ming-jen Yang BPM
13 Jan 2003
138-v1 Requirements for the Recycler Ring and Associated Transfer Line BPMs Brajesh Choudhary Beam Instrumentation
BPM
Beam Instrumentation
BPM
07 Feb 2003
744-v1 Simulation of Pbar Stacking and Un-Stacking in the Recycler Ring Chandrashekhara M. Bhat RF
Beam Instrumentation
Studies
Beam Dynamics
01 Sep 2002
376-v1 A First Look at the Longitudinal Emittance in the Fermilab Recycler Ring Chandrashekhara M. Bhat RF
Beam Instrumentation
Beam Dynamics
02 Aug 2002
373-v1 BPM System Requirements Martin J. Hu BPM
Beam Instrumentation
BPM
29 Jul 2002
743-v1 Pbar Acceleration in the MI using 2.5 MHz Coalescing RF system: Tune-up Study Scheme with proton beams and Operational Implementation Chandrashekhara M. Bhat et al. RF
Beam Instrumentation
LLRF
LLRF
14 Feb 2001
362-v1 Pbar Acceleration in the Main Injector RR/AR - MI - Tevatron - Simulations and Tune up Studies Using Protons Chandrashekhara M. Bhat RF
Beam Instrumentation
Studies
20 Nov 2000
353-v1 Slow Deceleration of Anti-Proton Beam in the MI: RF Specifications Chandrashekhara M. Bhat RF
Beam Instrumentation
12 Jun 2000
350-v2 GFSDA Tune Measurement in the Main Injector David A. Herrup Beam Instrumentation
Tune Measurement
23 Mar 2000
349-v1 Anti-Proton Beam Acceleration in the MI and RF Specifications Chandrashekhara M. Bhat RF
Beam Instrumentation
26 Jan 2000
339-v2 Stripline Detectors for Fermilab Main Injector James L. Crisp et al. Beam Instrumentation
Beam Dynamics
07 Dec 1998
333-v2 Main Injector Commissioning Plan C. Shekhar Mishra Beam Instrumentation
Operations
Commissioning
22 Jul 1998
317-v1 Addendum to MI-0226 Gregory L. Vogel RF
Beam Instrumentation
BPM
24 Jun 1998
328-v1 Transient Measurement of the Betatron Phase Advance Around the Recycler Ring Gerald P. Jackson Controls
Beam Instrumentation
Lattice
16 May 1998
312-v1 Recycler Instrumentation: Detector and Electronics Locations Gregory L. Vogel Alignment
Beam Instrumentation
01 Dec 1997
224-v1 8 GeV Line Instrumentation: Locations and Rack Layouts Gregory L. Vogel Beam Instrumentation
Civil
29 Oct 1996
223-v1 MI Instrumentation: Layouts and Rack Layouts Gregory L. Vogel Beam Instrumentation
Schottky
Controls
BPM
21 Oct 1996
137-v1 Design of the Beam Profile Monitor for Phase 1 of the 5 MeV Electron Cooling Test Beam Facility Gerald P. Jackson Beam Instrumentation
11 Aug 1995
82-v1 Summary of the Existing MR Beam Diagnostics for Use in Main Injector Chandrashekhara M. Bhat et al. Beam Instrumentation
Beam Dynamics
01 Mar 1993
72-v1 Main Injector Correctors Workshop, Friday, May 8, 1992, Fermilab Management of Main Injector Project Magnets
MI-Dept
08 May 1992
Number of documents found: 96

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 6 wallclock secs ( 0.53 usr + 0.10 sys = 0.63 CPU)