Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
367-v3 Determining the Radius and Energy of the Recycler Ring Ioanis Kourbanis BPM
RF
Beam Instrumentation
Studies
17 May 2012
3770-v2 Meeting Minutes: Linac and 400 MeV Beam Position Monitor Upgrade Craig C Drennan et al. Beam Instrumentation
23 Nov 2011
3789-v2 NTF BPM: Note on the New BPM Installation In the NTF Beam Line Craig C Drennan NTF
06 Oct 2011
3801-v4 Beam Position Monitor Requirements in the Linac and 400 MeV Line Craig C Drennan Beam Instrumentation
Upgrades
12 Sep 2011
3615-v1 Optical Beam Position Monitor for Sub-picosecond Spatio-temporal Correlation Monitoring Timothy J Maxwell Experiments
24 May 2010
3486-v6 Installation Planning for BPM-HRM Booster DAQ Extension Craig C Drennan Beam Instrumentation
14 Dec 2009
3454-v1 Detection of Quadrupole Magnetic Center Using Beam Based Diagnostics Anatoli Makarevich et al. Alignment
Instrumentation
BPM
21 Sep 2009
3376-v1 Booster BPM Info and Measurement Summary James A. Fitzgerald Beam Instrumentation
27 Apr 2009
3097-v1 Impressions from the 13th Beam Instrumentation Workshop BIW2008 Vsevolod Kamerdzhiev et al. Accelerator Seminar
Instrumentation
21 May 2008
2803-v1 Measurement of Booster Beam Halo using the C836A and C838A Collimators in the MI8 Beamline Bruce C. Brown Beam Loss Monitors (BLM)
Proton Plan
Other
Transfer Lines
Collimation
22 Apr 2008
2878-v1 Beam Position Monitor Using High Order Modes Nathan Eddy et al. BPM
Adv. Accelerator R&D
17 Sep 2007
1526-v6 MI BPM Meeting Notes and Minutes Steve Wolbers BPM
BPM
08 Nov 2006
2301-v3 Proposed MI BPM 2.5MHz Transition Board Gains Bob Webber BPM
Beam Instrumentation
BPM
03 Oct 2006
2469-v1 MI BPM Board-by-Board Gain Values Marv Olson et al. BPM
Beam Instrumentation
BPM
22 Sep 2006
2450-v2 MI BPM Meeting Bob Webber et al. BPM
13 Sep 2006
1951-v1 Monthly Report of the MI BPM Upgrade Project Bakul Banerjee et al. BPM
BPM
11 Sep 2006
2428-v1 MI BPM alarms David P Capista BPM
30 Aug 2006
2422-v1 Main Injector BPM signoff forms David P Capista BPM
BPM
29 Aug 2006
2414-v1 Investigation of Crosstalk on the Rapid Transfer BPM Analog Transition Module David W. Peterson Instrumentation
BPM
24 Aug 2006
2411-v1 Measurements of Crosstalk and High Frequency Signal Suppression for the Main Injector BPM Transition Board Andrea L Saewert Beam Instrumentation
BPM
24 Aug 2006
2382-v1 Using MathCad to Generate a Polynomial for Computation of Beam Position from MI Extra-Wide Aperture BPM Milton Smith BPM
Beam Instrumentation
BPM
08 Aug 2006
2371-v1 Note on Position Sensitivity of the Sum Signal from a Main Injector Extra-Wide Aperture BPM Bob Webber BPM
Beam Instrumentation
BPM
BPM
Intensity Measurements
01 Aug 2006
2285-v2 Rapid Transfer BPM List as of 6-9-06 (after upgrades) John Van Bogaert Beam Transfer
Transfer Lines
BPM
BPM
BPM
Transfer Lines
Run II Upgrades
09 Jun 2006
2280-v1 MI Extra Wide Aperture BPM Scaling in Difference-Over-Sum BPM System Bob Webber BPM
Beam Instrumentation
BPM
BPM
05 Jun 2006
2288-v1 MIBPM Cable Measurements Bob Webber BPM
Beam Instrumentation
BPM
05 Jun 2006
2273-v3 MI Extra Wide Aperture BPM Scaling in AM-PM BPM System Bob Webber BPM
Beam Instrumentation
BPM
BPM
26 May 2006
2276-v1 MI BPM Commissioning Phase I Robert Dysert BPM
BPM
23 May 2006
1822-v4 MI Service Building Survey (BPM electronics space) Marv Olson BPM
BPM
23 May 2006
2274-v1 Analog Signal Pre-Processing For The Fermilab Main Injector BPM Upgrade Stefano M Rapisarda et al. BPM
BPM
22 May 2006
2243-v3 MI BPM Upgrade Topics Steve Wolbers BPM
BPM
16 May 2006
2252-v6 The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli BPM
BPM
08 May 2006
2250-v9 Fermilab Main Injector BPM Upgrade Steve Wolbers BPM
BPM
03 May 2006
2251-v9 Fermilab Main Injector Beam Position Monitor Upgrade (poster) Steve Wolbers BPM
BPM
02 May 2006
1949-v9 Main Injector Beam Position Monitor Upgrade Software Specifications for Data Acquisition Steve Foulkes et al. BPM
BPM
07 Apr 2006
2221-v1 Proposed Booster bpm geometry James L. Crisp Upgrades
BPM
Beam Instrumentation
03 Apr 2006
2163-v1 MI BPM TBT resolution data Peter Prieto BPM
22 Feb 2006
2153-v1 Main Injector BPM Test Stand Data Bob Webber BPM
Beam Instrumentation
BPM
BPM
18 Feb 2006
2125-v5 MI BPM Offset Table Log Marv Olson Beam Instrumentation
BPM
01 Feb 2006
1276-v6 Tevatron BPM Front End Software User's Guide Luciano Piccoli et al. BPM
20 Jan 2006
2101-v2 MI BPM EchoTek/GrayChip Bandwidths Bob Webber BPM
Beam Instrumentation
BPM
16 Jan 2006
2099-v1 MI BPM Installation Requirements David P Capista BPM
11 Jan 2006
2043-v1 Assessment of MI BPM turn-by-turn measurements Bob Webber BPM
Beam Instrumentation
BPM
07 Dec 2005
1786-v7 Requirements for the Main Injector BPM upgrade David P Capista et al. BPM
24 Oct 2005
1985-v1 MIBPM front-end software release schedule Luciano Piccoli BPM
11 Oct 2005
1978-v2 Memo on Preliminary Values for MI BPM Polynomial Coefficients Bob Webber Monitoring Instrumentation
Extraction from Main Injector
BPM
Beam Instrumentation
BPM
BPM
03 Oct 2005
1322-v2 Main Injector/NuMI BPM Scaling - Analysis of Main Injector HP602 and HP604 BPM Data from Traditional Main Injector and NuMI BPM Systems Bob Webber Commissioning
Monitoring Instrumentation
BPM
Beam Instrumentation
BPM
General
03 Oct 2005
1958-v2 Antiproton Beam Position Measurements with Prototype Equipment at MI-30 Charles Briegel et al. Beam Instrumentation
BPM
BPM
19 Sep 2005
1956-v1 Qualification of the Haynes 10/7 Digitizer Clock Signal Peter Prieto et al. BPM
Beam Instrumentation
BPM
12 Sep 2005
1955-v1 MIBPM Front-End Software Memory Requirements Review Luciano Piccoli BPM
BPM
09 Sep 2005
1937-v2 Main Injector BPM Review Committee Report of July 25, 2005 Alan Baumbaugh et al. BPM
BPM
22 Aug 2005
1067-v23 Tevatron BPM Software Design Dinker Charak et al. BPM
BPM
16 Aug 2005
860-v34 Tevatron BPM Software Specifications Dinker Charak et al. Tevatron BPM
BPM
BPM
16 Aug 2005
1908-v3 MI BPM Upgrade Review -- Overview Talk Bob Webber BPM
BPM
25 Jul 2005
1894-v1 Evaluation and correction of nonlinear effects in FNPL beam position monitors Philippe R.-G. Piot Diagnostics
07 Jul 2005
1892-v1 Recycler Transverse Damper Status James L. Crisp Instabilities
BPM
BPM
Beam Dynamics
Dampers
06 Jul 2005
1880-v1 A First Look at Direct Measurements of Beta-Star in the Tevatron Michael J. Syphers Collision Point Monitor (CPM)
Transverse Dynamics
Studies
Beam Studies
BPM
Optics
BPM
30 Jun 2005
1874-v1 MI States and BPMs Brian E. Chase BPM
BPM
17 Jun 2005
1835-v1 Plans for Tevatron BPM Upgrade Continuity Diagnostics Jim Steimel Tevatron BPM
BPM
BPM
16 Jun 2005
1865-v1 Combiner Board Slides from MI BPM 6/7/05 Meeting Bob Webber et al. BPM
09 Jun 2005
1836-v2 The New Tevatron Beam Position Monitor Front-End Software Luciano Piccoli None
27 May 2005
1845-v1 Beam Sync Clocks Gregory L. Vogel BPM
BPM
25 May 2005
1498-v3 BPM Sub Rack Address maps Bill Haynes et al. BPM
23 May 2005
1810-v1 TeV BPM Timing Generator Fanout (TGF) Features Bill Haynes BPM
BPM
13 May 2005
1490-v3 Tevatron Beam Position Monitor Upgrade Steve Wolbers Tevatron BPM
BPM
BPM
12 May 2005
1496-v3 Using Time Separation of Signals to Obtain Independent Proton and Antiproton Beam Position Measurements Around the Tevatron Bob Webber BPM
BPM
BPM
06 May 2005
1806-v1 MI States and Clock Events David P Capista BPM
03 May 2005
1780-v1 Proton and PBar Beam Measurements in the Main Injector Peter Prieto et al. BPM
BPM
13 Apr 2005
1753-v2 BPM Projects - Breakout Talk for March 2005 DOE Review of TeV Operations Bob Webber BPM
BPM
25 Mar 2005
1751-v2 Tevatron BPM Upgrade (talk at 3/24/05 Run 2 Meeting) Steve Wolbers BPM
Run II
BPM
BPM
24 Mar 2005
1750-v1 SY120 BPM Electronics Measurements James A. Fitzgerald Extraction
SY120
BPM
23 Mar 2005
1065-v8 Tev BPM VME Hardware Specifications Mark J Bowden et al. BPM
11 Mar 2005
1586-v1 Timing Generator Fanout (TGF) Diagnostic Signals Bill Haynes Tevatron BPM
BPM
BPM
22 Feb 2005
1383-v4 TeV BPM Analog Board PRR Bob Forster et al. BPM
18 Feb 2005
1551-v1 Tevatron BPM Upgrade TBT Testing Plans and Status Jim Steimel Tevatron BPM
BPM
BPM
31 Jan 2005
1550-v1 MI BPM Upgrade (Talk given at CD Accelerator Activities Coord. Mtg 1/25/05) Steve Wolbers BPM
BPM
28 Jan 2005
1549-v1 Tevatron BPM Upgrade (CD Accelerator Activities Coord. Mtg talk) Steve Wolbers BPM
BPM
28 Jan 2005
1542-v1 Summary of Tevatron BPMs for Main Injector Michael A. Martens et al. BPM
BPM
BPM
BPM
25 Jan 2005
1499-v5 BPM Electronics Production Test Plan Timothy J. Kasza BPM
24 Jan 2005
1539-v1 Tevatron BPM Upgrade (Talk at All Experimenters Meeting 1/24/05) Steve Wolbers BPM
BPM
24 Jan 2005
1538-v1 Tevatron BPM Upgrade Status and Plans Talk at Tevatron Dept Meeting Jim Steimel et al. BPM
BPM
Tevatron Group
21 Jan 2005
1529-v1 The CIC Filter Gustavo Cancelo Tevatron BPM
BPM
BPM
14 Jan 2005
1528-v1 The TeV BPM Simulation Signal Gustavo Cancelo Tevatron BPM
BPM
BPM
14 Jan 2005
1500-v1 Turn by Turn Measurements with the Tevatron BPM Production Electronics Robert K Kutschke BPM
13 Jan 2005
1524-v1 MI BPM Upgrade Steve Wolbers BPM
11 Jan 2005
1070-v2 Obsolete Tevatron BPM Hardware Specifications (see #1065) Mark J Bowden et al. BPM
04 Jan 2005
1511-v1 Tevatron BPM Upgrade Commissioning Steve Wolbers Tevatron BPM
BPM
BPM
17 Dec 2004
1483-v1 Progress Report Eric James Tevatron BPM
BPM
BPM
03 Dec 2004
1482-v1 Analysis of the phase shift error between A and B signals in BPMs Gustavo Cancelo Tevatron BPM
BPM
BPM
03 Dec 2004
1480-v1 TeV BPM Upgrade (Talk at CD Accelerator Activities Mtg 11/30/04) Steve Wolbers BPM
BPM
02 Dec 2004
1060-v4 Tevatron BPM Online Software Specification Brian S. Hendricks BPM
29 Nov 2004
1101-v8 Tevatron Beam Position Monitor Upgrade Offline Software Specification Robert K Kutschke BPM
29 Nov 2004
1414-v3 First Echotek readout with the “envelope” filter Gustavo Cancelo et al. Tevatron BPM
BPM
BPM
15 Nov 2004
1450-v1 Tevatron BPM Modes of Operation Jim Steimel BPM
BPM
BPM
15 Nov 2004
1446-v1 First Turn Timing in TeV BPM Jim Steimel Tevatron BPM
BPM
BPM
12 Nov 2004
1358-v2 TeV BPM Data Registers Michael A. Martens et al. Tevatron BPM
BPM
BPM
BPM
04 Nov 2004
1435-v1 The NUMI Beamline Samuel R. Childress et al. Target Hall Systems
Commissioning
Monitoring Instrumentation
Extraction from Main Injector
Run II
Focusing Horns
Primary Proton Beam
04 Nov 2004
1431-v1 TeV BPM Upgrade Steve Wolbers Tevatron BPM
BPM
BPM
02 Nov 2004
1421-v1 TeV BPM Commissioning Modes Jim Steimel Tevatron BPM
BPM
BPM
22 Oct 2004
1407-v2 Echotek test bench studies Jim Steimel Tevatron BPM
BPM
BPM
22 Oct 2004
1415-v4 Relationship Between Beam Position Monitor Log Ratio and Difference-Over-Sum Formulations Bob Webber BPM
BPM
21 Oct 2004
1412-v2 Numi BPM Measurement Data James A. Fitzgerald Monitoring Instrumentation
BPM
Beam Instrumentation
19 Oct 2004
1416-v1 Note on BPM Sensitivity Scale Factors for NuMI BPM System Bob Webber Commissioning
Monitoring Instrumentation
BPM
BPM
General
Primary Proton Beam
18 Oct 2004
1413-v1 Echotek Update Eric James Tevatron BPM
BPM
BPM
16 Oct 2004
1384-v1 TeV BPM Analog Board Test Results Bob Forster et al. BPM
07 Oct 2004
1397-v1 Analog filter testing results for TeV BPM Upgrade Timothy J. Kasza Tevatron BPM
BPM
BPM
07 Oct 2004
1349-v3 Timing Generator Fanout PRR Bill Haynes et al. BPM
30 Sep 2004
1361-v1 Introduction to the A0 BPM system Kai Desler Controls
Operations
24 Sep 2004
1360-v1 BPM Test signal spectrum analysis and batch envelope filter Gustavo Cancelo Tevatron BPM
BPM
BPM
BPM
23 Sep 2004
1359-v1 Echotek Update Eric James Tevatron BPM
BPM
BPM
BPM
23 Sep 2004
1356-v1 Tevatron BPM Upgrade (Talk 9/21/04) Steve Wolbers Tevatron BPM
BPM
BPM
22 Sep 2004
1351-v1 More on Echotek Board Setup Eric James Tevatron BPM
BPM
BPM
18 Sep 2004
1344-v1 Main Injector bpm scale factors James L. Crisp BPM
Beam Instrumentation
14 Sep 2004
1323-v3 MI beam orbit verifier specifications for the NuMI Beam Permit System Andrew Godley Monitoring Instrumentation
Extraction from Main Injector
Beam Instrumentation
BPM
Primary Proton Beam
Controls
07 Sep 2004
1297-v1 Graychip in the EchoTek board Eric James Tevatron BPM
BPM
BPM
06 Aug 2004
1296-v1 Graychip filters and simulations Gustavo Cancelo Tevatron BPM
BPM
BPM
06 Aug 2004
1281-v1 Tevatron BPM Upgrade Steve Wolbers Tevatron BPM
BPM
BPM
03 Aug 2004
1202-v3 BLM Prototype Testing Bill Haynes et al. BPM
02 Aug 2004
1257-v2 BPM upgrade Cable Specification Bob Forster et al. BPM
22 Jul 2004
1265-v1 BPM Timing Generator Fanout Bill of Materials Bill Haynes BPM
22 Jul 2004
1261-v1 BPM Timing Generator Fanout Layout Bill Haynes BPM
22 Jul 2004
1260-v1 BPM Timing Generator Fanout Schematics Bill Haynes BPM
22 Jul 2004
1264-v1 BPM Filter Board Bill of Materials Vince Pavlicek BPM
20 Jul 2004
1259-v1 Tevatron Filter Board Layout Vince Pavlicek BPM
20 Jul 2004
1244-v2 Tevatron Filter Board Schematics Vince Pavlicek BPM
20 Jul 2004
1258-v1 Integration Tasks Jim Steimel Tevatron BPM
BPM
18 Jul 2004
1245-v1 BPM Consolidated Crate Specification Vince Pavlicek BPM
08 Jul 2004
1165-v3 Specification for Passive Band Pass / Anti-aliasing Filter for the Tevatron BPM System Vince Pavlicek BPM
18 Jun 2004
1200-v1 Short-gate sampling mode Jim Steimel Tevatron BPM
BPM
BPM
BPM
11 Jun 2004
1172-v1 Tev BPM Diagnostics Thoughts Steve Wolbers Tevatron BPM
BPM
BPM
30 May 2004
1116-v2 Commissioning Outline for Tevatron BPM Upgrade Jim Steimel Tevatron BPM
BPM
BPM
11 May 2004
1161-v1 Tevatron BPM Upgrade Calibration Specifications Jim Steimel Tevatron BPM
BPM
BPM
BPM
06 May 2004
1133-v1 Tevatron Front-End Software Design Review Luciano Piccoli BPM
20 Apr 2004
1088-v1 Determining Beta-Star in the Tevatron Michael J. Syphers Collision Point Monitor (CPM)
Beam Studies
Instrumentation
BPM
Optics
BPM
BPM
29 Mar 2004
1083-v1 Tevatron BPM Single House Commissioning Plan Jim Steimel Tevatron BPM
BPM
BPM
25 Mar 2004
1082-v1 Slides from 3/18/04 Tevatron BPM upgrade meeting Bill Haynes Tevatron BPM
BPM
BPM
BPM
21 Mar 2004
1061-v1 Tevatron BPM Upgrade Timing/Diagnostic Design Ideas Bill Haynes Tevatron BPM
BPM
BPM
BPM
07 Mar 2004
1006-v1 Tevatron BPM Upgrade VME Crate Organization Mark J Bowden Tevatron BPM
BPM
07 Mar 2004
1041-v1 Echotek Drivers Charles Briegel Tevatron BPM
BPM
BPM
Beam Instrumentation
24 Feb 2004
1019-v1 Antiproton Source Debuncher BPM using Synchronous Detection James A. Budlong et al. Hardware
BPM
Front-end Systems
BPM
13 Feb 2004
969-v1 TeV BPM Commissioning Jim Steimel Tevatron BPM
BPM
BPM
12 Jan 2004
960-v4 Strategies For Measuring Resolution of new BPM Electronics Mark Fischler Tevatron BPM
BPM
BPM
09 Jan 2004
950-v1 Tevatron BPM Upgrade Project Review Summary Steve Wolbers Beam Loss Monitors (BLM)
BPM
Tevatron Group
19 Dec 2003
948-v1 Summary: Status, Motivations and Directions Bob Webber Tevatron BPM
BPM
BPM
17 Dec 2003
947-v1 BPM Hardware Vince Pavlicek Tevatron BPM
BPM
BPM
17 Dec 2003
946-v1 Seeing Antiprotons with the Damper Board Robert K Kutschke BPM
BPM
17 Dec 2003
945-v1 Key Specifications for Tevatron BPM Hardware Architecture Choices Jim Steimel Tevatron BPM
BPM
17 Dec 2003
944-v1 Tevatron BPM Requirements Michael A. Martens BPM
BPM
17 Dec 2003
943-v2 Tevatron BPM Upgrade Project Manager Overview Steve Wolbers Tevatron BPM
BPM
BPM
17 Dec 2003
554-v4 Tevatron Beam Position Monitor Upgrade Requirements Jerry Annala et al. Instrumentation
BPM
BPM
BPM
12 Nov 2003
904-v1 Tevatron BPM Cable and Related Measurements Fritz DeJongh et al. Tevatron BPM
BPM
BPM
07 Nov 2003
903-v1 Tevatron BPM Upgrade Data Registers Jim Steimel Tevatron BPM
BPM
BPM
07 Nov 2003
884-v1 Tevatron Beam Position Monitor Upgrade Proton Signal Cancellation Jim Steimel Tevatron BPM
BPM
BPM
28 Oct 2003
882-v1 Tevatron BPM Upgrade Steve Wolbers Beam Loss Monitors (BLM)
BPM
Tevatron Group
24 Oct 2003
872-v1 Tevatron BPM Analog Filter Specifications 10/8/03 Jim Steimel Tevatron BPM
BPM
BPM
08 Oct 2003
870-v1 Make a BPM out of a Damper? Vince Pavlicek Tevatron BPM
BPM
BPM
BPM
07 Oct 2003
867-v1 Recycler_BPM_Sign_Conventions Peter Prieto et al. BPM
Beam Instrumentation
06 Oct 2003
839-v1 The Physics and Math of Bumps in Courant/Snyder Mark Fischler BPM
22 Sep 2003
837-v1 Purpose of Tevatron BPM Upgrade Specifications Talk Jim Steimel Tevatron BPM
BPM
BPM
BPM
19 Sep 2003
836-v1 Tevatron Beam Position Monitor Upgrade Specifications Outline -- Draft Jim Steimel Tevatron BPM
BPM
BPM
BPM
19 Sep 2003
835-v1 Cusp Finding and Deviation Fitting Based on BPM Measurements Mark Fischler Transverse Dynamics
BPM
BPM
19 Sep 2003
827-v1 Controls Java Development for TeVBPM meeting Jim Patrick Tevatron BPM
Java Appl Framework
BPM
BPM
11 Sep 2003
805-v1 Algorithm for Scaling Existing Tev BPMs, Counts to Millimeters Timofei B Bolshakov Shot Data Analysis (SDA)
Instrumentation
BPM
BPM
Program Libraries
SDA
Java Data Acquisition
22 Aug 2003
763-v1 Accelerator Physics Basics Michael J. Syphers General
BPM
BPM
Multiparticle
07 Aug 2003
764-v1 BLM Data Structures and General Information by Al Baumbaugh Alan Baumbaugh Beam Loss Monitors (BLM)
Instrumentation
BPM
07 Aug 2003
369-v1 Longitudinal Schottky Pickup for the Recycler Edward W. Cullerton et al. Schottky
Beam Instrumentation
29 Jul 2003
97-v1 Preliminary Design of the Beam Position Detectors for the Fermilab Main Injector Ed Barsotti, Jr. Design Properties
Beam Instrumentation
24 Jun 2003
77-v1 Instrumentation Requirements for the Fermilab Main Injector David E. Johnson Beam Dynamics
Beam Instrumentation
23 Jun 2003
484-v1 Notes for MI/RR Group Meeting of 26 Feb 2003 Chandrashekhara M. Bhat et al. MI-RR-Group
BPM
RF
Beam Instrumentation
RF
10 Mar 2003
433-v1 Notes for MI/RR Group Meeting of 29 Jan 2003 Bruce C. Brown MI-RR-Group
BPM
Beam Instrumentation
Beam Line Tuner (BLT)
11 Feb 2003
388-v1 Notes for MI/RR Group Meeting of 18 Nov 2002 Bruce C. Brown MI-RR-Group
Commissioning
14 Jan 2003
387-v1 Notes for MI/RR Group Meeting of 6 Nov 2002 Bruce C. Brown MI-RR-Group
Commissioning
14 Jan 2003
386-v1 Notes for MI/RR Group Meeting of 4 Nov 2002 Bruce C. Brown MI-RR-Group
BPM
Lattice
Magnets
14 Jan 2003
383-v1 Notes for MI/RR Group Meeting of 7 Oct 2002 Bruce C. Brown MI-RR-Group
Studies
Controls
BPM
Beam Instrumentation
14 Jan 2003
359-v1 Notes for MI/RR Group Meeting of 11 Sep 2002 Bruce C. Brown MI-RR-Group
BPM
Beam Instrumentation
Studies
13 Jan 2003
373-v1 BPM System Requirements Martin J. Hu BPM
BPM
Beam Instrumentation
29 Jul 2002
370-v1 Radial Position Shift Due to Synchrotron Oscillation Martin J. Hu BPM
Beam Dynamics
15 Jun 2002
788-v1 MI8 Transfer Line Lattice Function Measurement Saeed Assadi et al. Lattice
BPM
01 May 2000
329-v1 Recycler Commissioning Plan Gerald P. Jackson Studies
Commissioning
11 Nov 1998
317-v1 Addendum to MI-0226 Gregory L. Vogel RF
Beam Instrumentation
BPM
24 Jun 1998
328-v1 Transient Measurement of the Betatron Phase Advance Around the Recycler Ring Gerald P. Jackson Lattice
Controls
Beam Instrumentation
16 May 1998
323-v2 Beam Position Monitors for the Fermilab Recycler Ring Ed Barsotti, Jr. et al. BPM
BPM
Beam Instrumentation
29 Apr 1998
316-v1 MI BPM RF Module Test Results Gregory L. Vogel RF
BPM
16 Jan 1998
312-v1 Recycler Instrumentation: Detector and Electronics Locations Gregory L. Vogel Alignment
Beam Instrumentation
01 Dec 1997
286-v1 The Effect of Quadrupole Magnetic Fields on Main Injector BPM Measurements James L. Crisp et al. BPM
Beam Instrumentation
BPM
31 Jan 1997
223-v1 MI Instrumentation: Layouts and Rack Layouts Gregory L. Vogel Controls
BPM
Beam Instrumentation
Schottky
21 Oct 1996
137-v1 Design of the Beam Profile Monitor for Phase 1 of the 5 MeV Electron Cooling Test Beam Facility Gerald P. Jackson Beam Instrumentation
11 Aug 1995
112-v1 Measurement of Main Ring Quads for Main Injector BPM Dimensions James A. Fitzgerald Magnets
Design Properties
Beam Instrumentation
15 Jun 1994
110-v1 Study of the Alignment Tolerance and Corrector Strength in the Fermilab Main Injector Lattice C. Shekhar Mishra Lattice
Alignment
Studies
25 May 1994
104-v1 Impedance and Instability Threshold Estimates in the Main Injector I Michael A. Martens et al. Instabilities
Beam Dynamics
01 Mar 1994
103-v1 BPM Alignment Tolerance Considerations Philip S. Martin Alignment
Beam Instrumentation
07 Jan 1994
96-v1 A Numerical Simulation of Resonant Extraction John A. Johnstone Lattice
Studies
08 Oct 1993
76-v1 Calculating Orbit Errors in Main Injector Using Two or One BPM/Cell Correction Scheme Fady A. Harfoush Lattice
Beam Dynamics
03 Dec 1992
Number of documents found: 192

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 2 wallclock secs ( 0.57 usr + 0.13 sys = 0.70 CPU)