Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
4020-v1 ASTA/NML Transverse Profile Station: Testing and Installation Amber S Johnson et al. ILCTA
OTR
Beamline
13 Dec 2011
3767-v1 Meeting Minutes: Linac Multi-Wires in the Momentum Dump Line Craig C Drennan Studies
Upgrades
Operations
Beam Instrumentation
Linac
05 Jan 2011
3097-v1 Impressions from the 13th Beam Instrumentation Workshop BIW2008 Vsevolod Kamerdzhiev et al. Instrumentation
Accelerator Seminar
21 May 2008
2803-v1 Measurement of Booster Beam Halo using the C836A and C838A Collimators in the MI8 Beamline Bruce C. Brown Beam Loss Monitors (BLM)
Proton Plan
Other
Transfer Lines
Collimation
22 Apr 2008
2931-v1 ODR Imaging of ILC Lepton Beams Alex H. Lumpkin NML
09 Nov 2007
2930-v1 OTR Imaging Considerations for ILC-TA at NML Alex H. Lumpkin NML
09 Nov 2007
2453-v2 Proposed MI BPM 53 MHz Channel Transition Board Gain Settings Robert Dysert et al. Beam Instrumentation
BPM
BPM
15 Sep 2006
2254-v3 The Tevatron Ionization Profile Monitors Kwame J Bowie et al. Ion Profile Monitor
Instrumentation
10 May 2006
2143-v1 First OTR Measurements in Tevatron Talk Vic Scarpine Beam Studies
OTR
10 Feb 2006
1825-v1 Development of an Optical Transition Radiation Detector for Profile Monitoring of Antiproton and Proton Beams at FNAL Alex H. Lumpkin et al. OTR
12 May 2005
1435-v1 The NUMI Beamline Samuel R. Childress et al. Extraction from Main Injector
Target Hall Systems
Focusing Horns
Monitoring Instrumentation
Primary Proton Beam
Commissioning
Run II
04 Nov 2004
1030-v2 Tests of an Optical Transition Radiation Detector for High-Intensity Proton Beams at FNAL Vic Scarpine et al. OTR
19 Feb 2004
179-v2 Magnetic Field Quality Specification for Recycler Ring Combined Function and Quadrupole Magnets Norman M. Gelfand et al. Magnets
Studies
23 Jul 2003
77-v1 Instrumentation Requirements for the Fermilab Main Injector David E. Johnson Beam Instrumentation
Beam Dynamics
23 Jun 2003
224-v1 8 GeV Line Instrumentation: Locations and Rack Layouts Gregory L. Vogel Beam Instrumentation
Civil
29 Oct 1996
137-v1 Design of the Beam Profile Monitor for Phase 1 of the 5 MeV Electron Cooling Test Beam Facility Gerald P. Jackson Beam Instrumentation
11 Aug 1995
Number of documents found: 16

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 0 wallclock secs ( 0.17 usr + 0.03 sys = 0.20 CPU)