Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
5675-v1 Beam Emittance using MW in MI8 for two different LINAC beam Currents Chandrashekhara M. Bhat et al. Beam Physics
Studies
23 Jul 2017
5284-v1 Computed Tomography of Transverse Phase Space Carol J. Johnstone et al. External Beams
Beam Physics
Instrumentation
21 Nov 2016
5281-v1 Modification of LBNF Beam, Concept Milorad B. Popovic Adv. Accelerator R&D
21 Nov 2016
5040-v2 Magnetic Control of Fermilab Switchyard Beam Splits Adam Watts External Beams
Transverse Dynamics
SY120
24 Feb 2016
4994-v5 Effects of Rough Vacuum in the P3 Beamline Adam Watts SY120
Main Ring
02 Feb 2016
4146-v2 Integration of ORKA and SY120 Thomas R. Kobilarcik SY120
26 Jun 2012
2201-v4 Beam collimation in the transfer line from 8~GeV linac to the Main Injector Alexandr Drozhdin Project
Proton Plan
Collimation
27 Jan 2012
4043-v2 General HINS Meetings Brian E. Chase et al. LLRF
Proton Driver
26 Jan 2012
3755-v1 Plans and Status for Beams at NML Mike Church NML
15 Dec 2010
3664-v1 Alternative siting for the g -2 experiment David E. Johnson Projects
02 Sep 2010
3529-v1 Expected Activation of SmCo5 Beam Line Magnets Bruce C. Brown Magnets
ES&H
Transfer Lines
NOvA
05 Jan 2010
2597-v4 Conceptual Design Report of 8GeV H- Transport and Injection David E. Johnson Proton Driver
14 Nov 2008
3127-v1 Beam Loss in the Superconducting Quadrupoles of Extraction Line for 14 mrad Crossing Angle Alexandr Drozhdin et al. ILCTA
20 Jun 2008
1977-v1 MI8 Beamline Collimation Design Bruce C. Brown Transfer Lines
Collimation
22 Apr 2008
2287-v1 Mechanical Design of MI8 Collimators Bruce C. Brown et al. Transfer Lines
Collimation
22 Apr 2008
2299-v1 Alignment Check for MI8 Collimators Bruce C. Brown Alignment
Transfer Lines
Collimation
22 Apr 2008
2426-v2 MARS15 Calculations for MI8 Collimator Design Bruce C. Brown et al. Proton Plan
ES&H
Transfer Lines
Collimation
22 Apr 2008
2618-v1 First Results from MI8 Collimator Use Phil Adamson et al. Studies
ES&H
Transfer Lines
Collimation
22 Apr 2008
2803-v1 Measurement of Booster Beam Halo using the C836A and C838A Collimators in the MI8 Beamline Bruce C. Brown Beam Loss Monitors (BLM)
Proton Plan
Other
Transfer Lines
Collimation
22 Apr 2008
2553-v2 General Solutions for a Transverse to Lonitudinal Emittance Exchange Beamline Raymond P Fliller Experiments
Photoinjector
29 Nov 2007
336-v1 Shielding Assessment of the Main Injector Complex Chandrashekhara M. Bhat et al. Studies
19 Nov 2007
2675-v1 R20 beamline optics study Ming-jen Yang Transfer Lines
05 Mar 2007
2390-v1 The NuMI Beam System: First Year of Operation Samuel R. Childress Target Hall Systems
Extraction from Main Injector
Primary Proton Beam
14 Aug 2006
2231-v1 Thoughts on Recycler Transfer lines in the Proton Stacker Era David E. Johnson Transfer Lines
13 Apr 2006
2219-v1 Proton Driver H- transport and injection David E. Johnson Proton Driver
30 Mar 2006
2121-v1 SNS visit David E. Johnson Proton Driver
Transfer Lines
28 Mar 2006
2210-v1 Care and Feeding of the Oscillation Overthruster Dave McGinnis Operations
Transfer Lines
20 Mar 2006
1989-v1 The NuMI Beam System:Commissioning & Initial Operation Samuel R. Childress Commissioning
Primary Proton Beam
13 Oct 2005
1943-v1 Measurement of Switchyard Phase Space 18Aug05 Thomas R. Kobilarcik SY120
31 Aug 2005
1745-v1 Numi Beamline Optics study, March 14, 2005 Ming-jen Yang Transfer Lines
Primary Proton Beam
Optics
22 Mar 2005
1573-v1 Multipole fields in Booster extraction septum MP02 Ming-jen Yang Transfer Lines
Extraction Lattice
11 Feb 2005
1548-v1 Beamline BPM Electronics Using FPGA William J. Ashmanskas et al. Instrumentation
Transfer Lines
28 Jan 2005
1485-v1 Pbar Stacking Report Dave McGinnis Instrumentation
Lattice
Alignment
Accumulator
Stochastic Cooling
Transfer Lines
Debuncher
05 Dec 2004
1439-v1 Effect of Longitudinal Translation of a Quadrupole Magnet on the Downstream Amplitude Function Michael J. Syphers Optics
09 Nov 2004
1435-v1 The NUMI Beamline Samuel R. Childress et al. Target Hall Systems
Commissioning
Focusing Horns
Monitoring Instrumentation
Extraction from Main Injector
Primary Proton Beam
Run II
04 Nov 2004
1394-v1 MI8 line measurement, March 2004 Ming-jen Yang Studies
Lattice
Transfer Lines
MI-Dept
Optics
05 Oct 2004
1316-v1 SY120 Mixed-mode Operation David E. Johnson Transfer Lines
SY120
Transfer Lines
24 Aug 2004
1307-v1 Study of Main Injector BLT Nicole Michelotti Beam Instrumentation
Transfer Lines
Beam Line Tuner (BLT)
17 Aug 2004
1242-v2 Potential Optical Solutions For Pbar Stacking and SY120 Mixed-Mode Operation David E. Johnson SY120
07 Jul 2004
1138-v1 A Simple Beam Line for the MuCool Test Area Chuck Ankenbrandt Upgrades
Future Accelerators
Adv. Accelerator R&D
22 Apr 2004
1137-v1 A Simple Beam Line for the MuCool Test Area Chuck Ankenbrandt Upgrades
22 Apr 2004
935-v2 Safety System Overview Mark T. Obrycki Adv. Accelerator R&D
17 Dec 2003
169-v1 Recycler Pbar Transfer Lines David E. Johnson Transfer Lines
01 Aug 2003
179-v2 Magnetic Field Quality Specification for Recycler Ring Combined Function and Quadrupole Magnets Norman M. Gelfand et al. Magnets
Studies
23 Jul 2003
293-v1 Optics and Field Error Compensation in the FNAL Permanent Magnet 8.9 GeV/c Proton Transfer Line John A. Johnstone Magnets
Lattice
17 Jul 2003
725-v2 Dispersion Matching into the Tevatron David E. Johnson et al. Beam Transfer
Transfer Lines
Optics
12 Jul 2003
728-v1 MI60 Quad Offsets for NuMI David E. Johnson Alignment
Alignment
Primary Proton Beam
Installation
11 Jul 2003
148-v2 AP4 Beam Dump and Allowed Beam Intensity Limit During the Construction Phase of theMI-8 GeV Beam-line Chandrashekhara M. Bhat Beam Dynamics
ES&H
10 Jul 2003
213-v1 Main Injector and Beamline Naming Conventions David E. Johnson et al. Lattice
Controls
Civil
08 Jul 2003
45-v1 Physical Aperture and Beamline Matching Criteria for the Main Injector Stephen D. Holmes et al. Lattice
Beam Dynamics
30 Jun 2003
105-v1 Radiation Levels in the 8 GeV Beamline Arising from the Tevatron Beam Losses Chandrashekhara M. Bhat et al. ES&H
24 Jun 2003
77-v1 Instrumentation Requirements for the Fermilab Main Injector David E. Johnson Beam Instrumentation
Beam Dynamics
23 Jun 2003
752-v1 Proposed Main Injector Quad Offsets and Dipole Correctors Currents for the Current NuMI Extraction Geometry David E. Johnson Extraction
Extraction from Main Injector
10 Jun 2003
468-v4 Notes for MI/RR Group Meeting of 19 Feb 2003 Bruce C. Brown RF
Beam Dynamics
Beam Instrumentation
Transfer Lines
MI-RR-Group
Studies
10 Mar 2003
469-v3 Notes for MI/RR Group Meeting of 24 Feb 2003 Bruce C. Brown Vacuum
Transfer Lines
MI-RR-Group
Studies
25 Feb 2003
462-v1 Focusing Properties of The Booster Extraction Septa Bruce C. Brown et al. Transfer Lines
Extraction Lattice
Magnets
21 Feb 2003
381-v1 Notes for MI/RR Group Meeting of 25 Sep 2002 Bruce C. Brown Vacuum
MI-RR-Group
Vacuum
Transfer Lines
14 Jan 2003
361-v1 Notes for MI/RR Group Meeting of 18 Sep 2002 Bruce C. Brown Operations
MI-RR-Group
Transfer Lines
13 Jan 2003
375-v1 Vacuum Windows in Recycler Transfer Lines Carol J. Johnstone et al. Transfer Lines
Vacuum
Transfer Lines
27 Sep 2002
356-v1 Analysis of the Beam Loss Observed During the October 12, 2000 Main Injector Deceleration Studies Gerald P. Jackson Studies
Beam Dynamics
23 Oct 2000
351-v1 Strength Measurements of B3 (ODM) Dipoles Bruce C. Brown Magnets
Transfer Lines
Magnets
07 Sep 2000
788-v1 MI8 Transfer Line Lattice Function Measurement Saeed Assadi et al. Lattice
BPM
01 May 2000
344-v1 Preliminary Measurement of Airborne Radioactvity in the MI40 Absorber Room and at MI40 Abort Lambertsons Anthony F. Leveling Studies
ES&H
07 Apr 1999
341-v3 The Main Injector SBD for Studiers Willem Blokland et al. Beam Instrumentation
Sampled Bunch Display (SBD)
Acnet
LabVIEW
Console Applications
Data Acquisition
15 Feb 1999
339-v2 Stripline Detectors for Fermilab Main Injector James L. Crisp et al. Beam Instrumentation
Beam Dynamics
07 Dec 1998
296-v1 Mirror Magnet Designs for the Recycler Ring George W. Foster Magnets
Magnets
Transfer Lines
01 Aug 1998
315-v1 Main Injector and Recycler Ring Shielding Assessment Chandrashekhara M. Bhat et al. Studies
ES&H
01 Jul 1998
307-v2 Shielding Assessment of F0 to Switchyard Beam Line Enclosure for MI 120 GeV Beam Transport Chandrashekhara M. Bhat Beam Dynamics
ES&H
Transfer Lines
16 Sep 1997
294-v1 Magnet Orientations in Beamlines David E. Johnson Alignment
Alignment
Magnets
Transfer Lines
Civil
30 May 1997
292-v1 Beam Line Beam Loss Monitors Marv Olson Beam Instrumentation
Beam Loss Monitors (BLM)
Transfer Lines
Design Properties
12 Mar 1997
289-v1 Main Injector 8 GeV Beam Line Shielding Assessment Chandrashekhara M. Bhat et al. ES&H
Magnets
17 Feb 1997
287-v1 Measurements of the Longitudinal Shape and Center of the Magnetic Field of PDD Dipoles Bruce C. Brown Magnets
Magnets
Transfer Lines
17 Feb 1997
235-v1 Groundwater, Air-Borne and Soil Activation from the Operation of the Temporary Beam Absorber in the MI-8 GeV Beam Line Chandrashekhara M. Bhat et al. ES&H
Civil
25 Jan 1997
227-v1 Rogowski Coil Measurements of PQP003 and PQP004 Bruce C. Brown et al. Magnets
Magnets
Transfer Lines
25 Nov 1996
214-v1 MI Device and ACNET Names David E. Johnson et al. Controls
29 Oct 1996
211-v2 Ground-water Activation from the Operation of MI40 Beam Absorber Chandrashekhara M. Bhat et al. ES&H
Design Properties
28 Aug 1996
201-v2 Achromatic Bends for Electron Beam Transport at Fermilab Kirt J. Bertsche Electron Cooling
Magnets
Electron Cooling
01 Aug 1996
200-v1 Mass Separation in a Proton Analog of a 5 MeV Electron Beam Kirt J. Bertsche Electron Cooling
Electron Cooling
Beam Instrumentation
01 Aug 1996
197-v1 8 GeV Beam Absorber for Beam Line Commissioning Chandrashekhara M. Bhat et al. ES&H
Design Properties
Commissioning
31 Jul 1996
170-v1 Closed Orbit Effects Due to Longitudinal Bend Center Displacement Bruce C. Brown Alignment
Transfer Lines
Transfer Lines
02 Apr 1996
157-v1 RF Power Limitation on Main Injector Beam Current James E. Griffin RF
Beam Instrumentation
03 Feb 1996
146-v2 Radiation Level in the Intersection Region of AP2 and 8 GeV Beam-line due to Beam Loss in the AP2 Beam-line Chandrashekhara M. Bhat et al. Beam Dynamics
ES&H
23 Aug 1995
143-v1 Design Specifications for the 90o Dipoles for the Recycler Ring Electron Cooling Beamline Gerald P. Jackson Electron Cooling
Magnets
Magnets
14 Aug 1995
136-v2 µ-Dose Level in the Vicinity of the Intersection of the 8 GeV and the AP2-Beamlines Chandrashekhara M. Bhat Beam Dynamics
ES&H
28 Jun 1995
106-v2 An Air-Cooled FMI Abort Dump? Chandrashekhara M. Bhat et al. Design Properties
Water
04 Apr 1994
85-v1 Transparencies from 150 GeV Line Status Review Management of Main Injector Project Beam Instrumentation
Beam Dynamics
Transfer Lines
21 Jul 1993
79-v1 Beamline Power Supply Ripple and Regulation Specifications David E. Johnson Power Supplies
Transfer Lines
02 Mar 1993
75-v1 Beamline Errors and Corrector Strengths David E. Johnson Beam Dynamics
Magnets
14 Aug 1992
72-v1 Main Injector Correctors Workshop, Friday, May 8, 1992, Fermilab Management of Main Injector Project Magnets
MI-Dept
08 May 1992
704-v1 Proton Single Coalesced-Bunch Intensities in the Main Injector Gerry Dugan RF
Beam Dynamics
06 Aug 1991
62-v1 Minutes from the First Main Injector 'Review' Meeting May 29, 1991 Philip S. Martin Extraction
Lattice
Transfer Lines
29 May 1991
48-v1 Location of Main Injector Relative to Tevatron Stephen G. Peggs Beam Transfer
Civil
05 Feb 1991
46-v1 Microwave Instability at Transition - Stability Diagram Approach S. Alex Bogacz Beam Dynamics
01 Dec 1990
700-v1 Sloping the Main Injector Philip S. Martin Design Properties
Civil
22 Jun 1990
11-v1 MI-14 Beamlines Solutions for TeV Injection, Slow Extraction, Pbar Production, and Pbar Injection David E. Johnson Extraction
Beam Transfer
Transfer Lines
21 Mar 1990
8-v1 A 150 GeV MI_11 to Tevatron Beamline Solution David E. Johnson Transfer Lines
16 Nov 1989
3-v1 A Dynamic Lattice Insertion for Main Injector Extraction Rodney E. Gerig Extraction
Lattice
Beam Dynamics
31 Oct 1989
1-v2 A Dispersion Mismatch Criterion for the Main Injector to Tevatron Transfer Line Rodney E. Gerig Transfer Lines
24 Oct 1989
25-v1 Fermilab Fixed Target Beams from the Main Injector Samuel R. Childress Extraction
Transfer Lines
01 May 1989
Number of documents found: 99

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 2 wallclock secs ( 0.38 usr + 0.07 sys = 0.45 CPU)