Search Results

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Beams-doc-# Title Author(s) Topic(s) Last Updated
1813-v1 A First Look at NuMI Intensity Measuring Device Calibration Daniel D Cherdack Monitoring Instrumentation
DCCTs
16 Feb 2017
4309-v1 Notes on the Main Ring Spill Control Bucker System Bruce C. Brown Extraction
Magnets
07 Mar 2013
3944-v1 On Possibility of Slow Slective Bunch-by-Bunch extraction from Recycler Vladimir Shiltsev Transverse Dynamics
Beam Dynamics
27 Sep 2011
3408-v1 Half-Integer Resonant Extraction from the Debuncher John A. Johnstone Debuncher
03 Jun 2009
3045-v6 Gap Cleaning in the MI using RF Barrier Weiren Chou et al. Extraction
Operations
HLRF
HLRF
29 Feb 2008
2505-v1 Rebunching in the Debuncher for mu-e Conversion Experiments David V Neuffer Future Accelerators
Debuncher
05 Oct 2006
2233-v1 New recycler Lambertson George W. Foster Magnets
11 Apr 2006
2045-v1 Booster Cogging Robert M Zwaska LLRF
Extraction Lattice
08 Dec 2005
1868-v1 A Proposed Extraction System for the Fermilab Booster Chuck Ankenbrandt et al. Extraction Lattice
10 Jun 2005
1750-v1 SY120 BPM Electronics Measurements James A. Fitzgerald Extraction
SY120
BPM
23 Mar 2005
1277-v1 Booster Cogging: Synchronization with the Main Injector for NuMI & Slip-Stacking Robert M Zwaska LLRF
LLRF
Commissioning
Commissioning
29 Jul 2004
1120-v1 SY120Jamboree: Resonant Extraction Status and Plans David E. Johnson SY120
13 Apr 2004
1102-v2 Operational Status of Resonant Extraction David E. Johnson Extraction
01 Apr 2004
859-v1 Booster cogging for multiple batch operation of the Main Injector William A Pellico et al. LLRF
Commissioning
Project
Studies
Primary Proton Beam
Projects
02 Oct 2003
853-v1 Status of MI Resonant Extraction David E. Johnson Extraction
30 Sep 2003
754-v1 NuMI Extraction Comparison for Two and Three Kickers David E. Johnson Extraction
Extraction from Main Injector
13 Aug 2003
755-v1 Guidelines for MI60 Extraction with Three Kickers David E. Johnson Extraction
Extraction from Main Injector
13 Aug 2003
756-v2 NuMI Extraction Geometry with Current Main Injector Orbits, Quad Offsets, and Correctors David E. Johnson Extraction from Main Injector
Operations
13 Aug 2003
169-v1 Recycler Pbar Transfer Lines David E. Johnson Transfer Lines
01 Aug 2003
753-v1 NuMI Extraction Lambertson Configuration at MI60 David E. Johnson Extraction
Extraction from Main Injector
31 Jul 2003
121-v1 Data Analysis & Quality Control of the Fermilab Main Injector Dipoles Using the Flatcoil Measurements C. Shekhar Mishra Studies
Magnets
25 Jun 2003
752-v1 Proposed Main Injector Quad Offsets and Dipole Correctors Currents for the Current NuMI Extraction Geometry David E. Johnson Extraction
Extraction from Main Injector
10 Jun 2003
528-v1 Notes for MI/RR Group Meeting of 10 March 2003 Bruce C. Brown RF
Extraction
Beam Instrumentation
Vacuum
MI-RR-Group
24 Mar 2003
21-v1 A Stretcher Ring in the MI Tunnel Stanley M. Pruss et al. Other
03 Feb 2003
347-v1 Single Turn Extraction Design for NuMI David E. Johnson Extraction
Extraction from Main Injector
Design Properties
Civil
Civil Construction
06 Jan 2000
333-v2 Main Injector Commissioning Plan C. Shekhar Mishra Beam Instrumentation
Operations
Commissioning
22 Jul 1998
307-v2 Shielding Assessment of F0 to Switchyard Beam Line Enclosure for MI 120 GeV Beam Transport Chandrashekhara M. Bhat Transfer Lines
Beam Dynamics
ES&H
16 Sep 1997
212-v2 Short Summary of my Visit to Fermilab Charles Steinbach Extraction
HLRF
Project
10 Sep 1996
96-v1 A Numerical Simulation of Resonant Extraction John A. Johnstone Studies
Lattice
08 Oct 1993
92-v2 A Simplified Analysis of Resonant Extraction at the Main Injector John A. Johnstone Extraction
Beam Dynamics
03 Sep 1993
89-v1 Study of the Fermilab Main Injector Lattice Fady A. Harfoush et al. Studies
Lattice
25 Aug 1993
85-v1 Transparencies from 150 GeV Line Status Review Management of Main Injector Project Beam Instrumentation
Transfer Lines
Beam Dynamics
21 Jul 1993
80-v1 Kicker Operating Margins David E. Johnson Magnets
Magnets
03 Mar 1993
62-v1 Minutes from the First Main Injector 'Review' Meeting May 29, 1991 Philip S. Martin Extraction
Lattice
Transfer Lines
29 May 1991
60-v1 Design and Multiparticle Simulation of the Half Integer Slow Extraction System for the Main Injector Michael Harrison et al. Extraction
06 May 1991
48-v1 Location of Main Injector Relative to Tevatron Stephen G. Peggs Civil
Beam Transfer
05 Feb 1991
41-v1 Main Ring Remnant Configuration Steven L. Hays et al. Transfer Lines
Magnets
06 Dec 1990
700-v1 Sloping the Main Injector Philip S. Martin Design Properties
Civil
22 Jun 1990
35-v1 Proposal for MI Injection and Extraction Kickers John A. Dinkel Magnets
10 Jun 1990
26-v2 MI_15 Kicker Specifications David E. Johnson Extraction
Transfer Lines
Magnets
17 Apr 1990
3-v1 A Dynamic Lattice Insertion for Main Injector Extraction Rodney E. Gerig Extraction
Lattice
Beam Dynamics
31 Oct 1989
24-v1 Extraction Losses from the Main Injector Samuel R. Childress et al. Extraction
27 Sep 1989
25-v1 Fermilab Fixed Target Beams from the Main Injector Samuel R. Childress Extraction
Transfer Lines
01 May 1989
1888-v1 A REPORT ON THE DESIGN OF THE FERMI NATIONAL ACCELERATOR LABORATORY SUPERCONDUCTING ACCELERATOR Francis T Cole et al. RF
General
Power Supplies
HLRF
Magnets
Vacuum
Vacuum
LLRF
Magnets
Beam Transfer
01 May 1979
Number of documents found: 44

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.7.23, contact Beams Document Database Administrators
Execution time: 1 wallclock secs ( 0.20 usr + 0.03 sys = 0.23 CPU)